Loading...
Building Permit•M MERCIAL BLDG PermitCity PERMITNUM 1[798020 • • • • 121 5th Ave N, Edmonds WA 1 1.1 -. •. Type: COMMERCIAL BLDG Owner/ Business: SARAH KENNEDY Status: ISSUED Subtype: COM ALTERATION OR REPAIR Parcel No: 01041200022100 Site Address: 8021234TH ST SW 221 EDMONDS,WA 98026 Applied: 4/29/2021 Subdivision: LLA PLN20130029, 005767, 004918, 010412, 008830 Lot: 0 Issued: 5/7/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $11,100.00 Occupancy Type: Construction Type: Expiration Date: 5/9/2022 Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: DO- DRYWALL/FLOOR REPAIR- WATER DAMAGED WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SARAH KENNEDY 18915 142ND AVE NE STE 140, (206)669-9692 SARAH@AMORRESTORATION.COM WOODINVILLE WA 98072 CONTACT ROBERT CLOWES 18915 142ND AVE NE STE 140, (206)707-5206 robert@amorrestoration.com WOODINVILLE WA 98072 CONTRACTOR AMOR RESTORATION 18915 142ND AVE NE STE 140, (206)669-9692 SARAH@AMORRESTORATION.COM WOODINVILLE WA 98072 8021 234TH ST SW #221, OWNER DO 1ULIE K EDMONDS WA 98026 IMMM •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 5/7/21 R12215 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 5/7/21 R12215 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/29/21 R11993 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 5/7/21 R12215 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $358.00 $358.00 5/7/21 R12215 PLAN REVIEW FEE - COMMERCIAL j 001.000.345.83.000.00 j $304.30 j $304.30 j 4/29/21 j R11993 TOTALS: $792.30 $792.30 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, May 07, 2021 3:03:41 PM 1 of 2 • Permit PERMIT NUM City of Edmonds JIL-. •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS•• •nline at: https://Inspection.MyBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 MECH ROUGH IN B-4 DRYWALL FASTENING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Friday, May 07, 2021 3:03:41 PM 2 of 2