Loading...
Building PermitPermitMECHANICAL PERMIT NU of Edmonds EdmondsCity 98020 BLD2021-0282 www.edmondswa.gov71.022 Type: MECHANICAL Owner/ Business: JEFFREY SAETHER Status: ISSUED Subtype: COMMERCIAL MECHANICAL Parcel No: 27032300407700 Site Address: 202 5TH AVE S EDMONII 98020-3425 Applied: 2/23/2021 Subdivision: Lot: 0 Issued: 3/9/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 9/5/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: SOUND CREDIT UNION- MECHANICAL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JEFFREY SAETHER PO BOX 789, MONROE WA (360)805-1835 TEAM MECHANICAL@AOL.COM 98272 CONTACT TEAM MECHANICAL INC PO BOX 789, MONROE WA (360)805-1835 teammechanical@aol.com 98272 CONTRACTOR TEAM MECHANICAL INC PO BOX 789, MONROE WA (360)8051835 teammechanical@aol.com 98272 PO BOX 1595, TACOMA WA OWNER SOUND CREDIT UNION 98401 DESCRIPTION 71BASEcFEE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 3/9/21R10919 MIT CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 3/9/21 R10919 PER PERMIT MECHANICAL PLAN REVIEW FEE 001.000.345.83.000.00 $110.00 $110.00 3/9/21 R10919 MISC MECHANICAL EQUIPMENT 001.000.322.10.000.00 $30.00 $30.00 3/9/21 R10919 FOR WHICH NO FEE IS INDICATED TOTALS: $230.00 $230.00 7 CONDITION TYPE STATUS NOTES Printed: Tuesday, March 09, 2021 9:21:49 AM 1 of 2 PermitMECHANICAL PERMIT NUM City of Edmonds . •:01 1 -. •. � • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. INSPECTIONSSchedule •https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-0 MECH FINAL" B-3 MECH ROUGH IN B-3 MECH EQUIP ATTACHMENT Printed: Tuesday, March 09, 2021 9:21:49 AM 2 of 2