ENG2021-0061 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMITNUMBER,
City of Edmonds
-0061
www.cityofedmonds.gov
Description: COMCAST-OVERLASH 598' FIBER, PROOF & PULL FOR 21705 HWY 99
ISSUED: 05/17/2021
Address: 21700 HIGHWAY 99 EDMONDS WA 98026
EXPIRES: 11/17/2021
rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00580700003000
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201
CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300
OWNER PUBLIC HOSPITAL DISTRICT 2 4710 196TH ST SW, LYNNWOOD WA 98036-5517
SNOHOMISH CO
INFORMFEE
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00
ENGINEERING INSPECTION FEE $110.00 $0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00
•
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
05/17/2021
RELEASED BY
DATE
Printed: Monday, May 17, 2021 10:36:39 AM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
OTHER CONDITION
City of Edmonds UPO required.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND OR NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
111110
•Mr
INSPECTION TYPE
1A-1
DATE RESULT
NOTES
COMPLETE
JOB START
X-2 ENGINEERING FINAL"
E-7 TRAFFIC CTRL
Printed: Monday, May 17, 2021 10:36:39 AM 2 of 2
RECEIVED
0\ t u,tl(-).
FEB 23 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
ROW PERMIT NO.: ENG 2021-0061
ISSUE DATE: 5/17/21
RIGHT-OF-WAY CONSTRUCTION
"VC. I3'�J PERMIT APPLICATION
PROJECT NAME: JB-580866 CONTACT:
CONTRACTOR: Cablecomm, LLC
Mailing Address: 1316 BONNEVILLE AVE, BLDG A,
SNOHOMISH WA 98290
State License #: CABLE*971DP
City Business License #: NR-021818
Jourden Lawrence
Phone #: 425-921-8201
Fax #:
Email #:
j ourden_lawrence@comcast.com
❑x Liability Insurance ❑x Bonded
ADDRESS OR INTERSECTION OF CONSTRUCTION: 21700 Highway 99, Edmonds, WA 98026
(PROPOSED WORK IN ROW FOR SITE LOCATED AT 21705 HIGHWAY 99, LYNNWOOD, WA 98036)
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT:
❑x Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only)
❑ Multi -Family ❑ Single Family
x❑ EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket permit?
ANY ASSOCIATED PERMITS?
❑ Other
❑ Yes ❑ No
BLD# ENG#
DESCRIPTION OF PROPOSED WORK (Be Specific) : The proposed work in the right of way is to
overlash 598' of fiber to existing Comcast strand alonh HWY 99 and 216th St SW: Droof existing riser/
conduit and pull 384' of 96ct fiber through existing conduit along 216th St SW. Proposed work in order
to provide fiber connectivity for Emerald City Engineers Inc at address 21705 HIGHWAY 99
LYNNWOOD WA 98036. * No disturbance of surface
WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year:
PAVEMENT CUT: ❑ Yes 0 No If yes, indicate size of cut: x
CONCRETE CUT: ❑ Yes 0 No If yes, indicate size of cut: X.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(NUMBER OF MONTHS)
Sidewalk 48 Hrs + LF
X
LF
SF
Alley 72 Hrs + LF
X
LF
SF
Parking 72 Hrs + LF
X
LF
SF
APPLICANT TO READ AND SIGN
*Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
*Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS.
Indemnity: The Applicant has signed an application which states he/she hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this permit.
I have read the above statements and understand the permit requirements and acknowledge that I must
follow all requirements in order for the permit to be valid.
SIGNATURE �` DATE 2/23/21
Contractor or Agent
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
C.O.E. U.P.O. REQUIRED.
WORK HOURS M - F: 9 AM TO 3 PM ONLY.
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
�o
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TMA ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 lbs.
HOST VEHICLE WEIGHT
> 22,000 lbs.
< 45 MPH
1 45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100'
1 123'
172'
74'
100'
150'
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
CHANNELIZING DEVICE SPACING (FEET)
MPH
TAPER
TANGENT
50
40
1 80
35/45
30
60
25/30
20
40
SIGN SPACING = X (FEET) (1)
RURAL ROADS 45 / 55 MPH 500't
RURAL ROADS & URBAN ARTERIALS 35 140 MPH 350't
RURAL ROADS, URBAN ARTERIALS 25 / 30 MPH 200'3 (2)
RESIDENTIAL & BUSINESS DISTRICTS
ALL SIGNS ARE 48" z 48" BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
MINIMUM TAPER LENGTH = L (feet)
Lane
Width (feet)
Posted Speed (mph)
25 30 35 40 45 50 55 60 65 70
10
105
150
1 205
1 270
1 450
1 500
1 -
I -
-
-
11
115
165
1 225
1 295
1 495
1 550
1
-
-
-
12
125
180
1 245
1 320
1 540
1 600
1
-
-
-
(1) All spacing may be adjusted to accommodate interchange ramps, CONTACT WSDOT AUTHORITIES 48-72
at -grade intersections, and driveways. HOURS IN ADVANCE OF WORK ON HWY 99.
(2) This spacing may be reduced in urban areas to fit roadway CALL BONIE NAU AT 206-440-4471
conditions. LIGHTED ARROW BOARDS TO REQUEST AN
REQUIRED. W4-2L n W20-1 OFFICER, CONTRACT
WILL REQUIRE CITY OF EDMONDS UNIFORMED
POLICE OFFICER FOR OVERLASH WORK
CROSSING PACIFIC HWY
END ROAD
WORK
u2 200'
TAPER ,
W20 I ROAD
� WORK
AHEAD
W20-7B RIGHT
BE TWO LANES
PREPARE CLOSED
0 STOP AHEAD
W20-501
x x x
x x L , 2L - r 12
® q q
-----------.- ®------®---®----- --- - -®---- ---------- ---- -----®-------- -----®-------- ----- ®------- a--®--------------------------------��---
----------�J--,--------------------------------------®- 1
---13 Et -- 0- -0--- a --- 13---- z--- a ---- Et --- 0--- M----a----0--- 0---®---a---CL--®---0--13------------------------------------
-----------'------------------------------------------------------------------ -- - ------------ - --- -----------------------------
V00-------------------------------- --- lc---------------------------------------------
®® EMla Ea
W20-1
ROAD I
WORK
AHEAD
RIGHT
TWO LANES
CLOSED
LEGEND W20-501
N
SIGN LOCATION
®
SIGN LOCATION -
5' MOUNTING HEIGHT RECOMENDED
CCD
ARROW BOARD
o
TMA
0 o m
CHANNELIZING DEVICES
TRAFFIC SAFTEY DRUMS /
® ® ®
TALL CHANNELIZATION DEVICES
PCMS
PORTABLE CHANGEABLE
MESSAGE SIGN RECOMMENDED
X I R
W4-2L W20-7A
T
BE
PREPARED
0 STOP
W20-7B
JASON SHIER AT
206-353-2987 TEN DAYS
PRIOR TO START OF
WORK (SEE ATTACHED
OFF DUTY DETIAL
INFORMATION).
CALL CITY INSPECTOR
JEFF WHATMORE
206-305-0618 FOR
INSPECTION DATE OF
U.P.O.
END ROAD
200'
WORK
NOTES
1. Protective vehicle with TMA required for roadway 45 mph or higher. For roads 40
(SAMPLE MESSAGE)
mph or less - If no TMA is available, the protective vehicle shall be strategically
PCMS
located in the field to shield workers and no roll ahead distance is specified.
1 z
2. Devices should not encroach into adjacent lanes. The 2' lateral buffer is
RIGHT sLowoR
recommended. ENGINEERING DIVISION
LANE STOPPED
3. Use transverse devices in closed lane every 1000', or when work APPROVED AS NOTED
CLOSED TRAFFIC
operation allows.
1.5 SEC 1.5 SEC
4. Traffic safety drums or tall channelization devices required for all lane %?,2Q 05/17/2021
PLACE 1/2 MILE FROM
closure tapers on roadways 45 mph or higher. (Half spacing required for-
BEGINNING OF TAPER
tall channelization devices).
5. When used, device spacing for the downstream taper should be 20' O.C.
6. Coordinate with region traffic office work hour restrictions.
CHANNELIZING DEVICE SPACING (FEET)
MPH
TAPER
TANGENT
50 / 70
40
80
40/45
30
60
Applicant shall repair/replace all
damage to utilities or frontage
R E S U B
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
Apr29 2021
CITY OF EDMONDS
OWNER/CONTRACTOR IS RESPONSIBLE FOR
DEVELOPMENT SERVICES
EROSION CONTROL AND DRAINAGE
DEPARTMENT
ROAD
WORK
AHEAD
RIGHT
LANE
9 CLOSED
AHEAD KEEP
LEFT
R4-8 B
LIGHTED ARROW WITH
BOARD REQUIRED
ROLL SPACING
50' MIN 100' MAX TRUCK 4t
WITH
WORK FLASHING
AREA BEACON _ (c
R
~ L
PACIFIC HWY
Spotter to assist pedestrians
through work zone
TABLE A
SPEED
(MPH)
TAPER LENGTH
FOR SHIFT WIDTH
CONE SPACING
ALONG TAPER
(FT)
10,
12'
25
105'
125'
25
30
150'
180,
30
35
205'
245'
35
40
270'
320'
40
45
450'
540'
45
*Permitted work hours are only M-F 9 AM to 3 PM
W4-2R W20-5R W20-1
RIGHT ROAD
LANE WORK
CLOSED AHEAD
AHEAD
SEE SEE SEE
NOTE 1 NOTE 1 NOTE 1
PACIFIC HWY
NOTES
1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR
RESIDENTIAL STREETS (25 MPH) AND 350' FOR
ARTERIAL ROADWAYS
0
2. FLASHING BEACON INSTALLED AT EACH SIGN FOR
NIGHT-TIME USE (OPTIONAL).
ROAD 3. DISTANCES MAY VARY AS APPROVED BY THE
WORK ENGINEER.
AHEAD
I
4. SPOTTERS REQUIRED WHENEVER THE CONTRACTOR
W20-1 MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE
WORK SITE WITH MATERIALS OR EQUIPMENT
(FLAGGING REQUIRES 3 OR 4 SIGN SETUP).
V) 5. SIGN SIZE PER MUTCD.
U0
6. THIS PLAN IS PROVIDED AS A GUIDE ONLY. FOR
11.0 SPECIFIC INFORMATION ON TRAFFIC CONTROL PLANS
r_1 SEE CURRENT MUTCD.
N
LEGEND
0 CONE OR CHANNELIZING DEVICE SEE STANDARD
DRAWING 713.
RESUB
Apr 29 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
TITLE
TRAFFIC CONTROL PLAN
LANE ROADWAY WITH RIGHT LANE
CLOSURE FAR SIDE OF INTERSECTION
C)
C
N
V
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
]o
LENGTH (feet)
155
200
250
305
360
—
--
—
—
--
TMA ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 Ibs.
HOST VEHICLE WEIGHT
> 22,000 Ibs.
<45 MPH
45-55 MPH
> 55 MPH
<45 MPH
45-55 MPH
> 55 MPH
100'
74'
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
SIGN SPACING = X (FEET) ( 1 )
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350't
RURAL ROADS, URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200't (2)
URBAN STREETS 25 MPH OR LESS
100't (2)
ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE
DESIGNATED.
MINIMUM SHOULDER TAPER LENGTH = U3 (feet)
SHOULDER
Pceted Speed (mph)
WIDTH
(' 0
25
1 30
I 35
1 40
45
50
55
fi0
65
]0
e'
40
40
60
98
120
130
150
160
1]0
190
10'
40
60
90
90
150
1]0
190
200
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN 8'.
(1) All spacing may be adjusted to accommodate interchange ramps,
at -grade intersections, and driveways.
(2) This spacing may be reduced in urban areas to fit roadway
conditions.
*Spotter to assist pedestrians through work zone
Z
216TH ST SW
8B 8B 88 ® 8
Kl Kl
I I
X X 1 1/3 B R
CHANNELIZING DEVICE SPACING (FEET)
MPH
TAPER
TANGENT
35 / 40
30
60
25 / 30
20
40
ROAD SHOULDER Contractor to post no parking signs 72HRS in
WORK
AHEAD WORK advance for road side parking locations in order
NOTE
to access pedestals/vaults for proof and pull
W20-1 W21-5 1. When used, device spacing for the downstream
locations taper should be 20' O.C.
LEGEND
N SIGN LOCATION
®®® CHANNELIZING DEVICES
l� PROTECTIVE VEHICLE - RECOMMENDED
TYPICAL SHOULDER CLOSURE - LOW SPEED (40 MPH OR LESS)
TCP 5
RESUB
Apr 29 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
n
3
� a
0
z
O
�G a
n
Cl)
VJ
O
s=
s?
CD
C7
O
I
r
0
m
(D
Q
CD
3
ZT
O
r
CD
cn
f1
a-
z
N
OFF DUTY DETAIL INFORMATION SHEET
EDMONDS POLICE OFFICERS ASSOCIATION
250 5T" AVE N, EDMONDS, WA 98020
The purpose of this sheet is to provide information regarding the requesting of; cost of; and
procedures for scheduling Police Officers for 'off -duty' details within the City of Edmonds.
Point of Contact:
Officer Jason Shier, EPOA Vice President:
o Email: vicepresident.epoa@gmail.com.
o Cellular phone: 206-353-2987
Requesting an officer: (Please request an officer with as much advance notice as possible!)
• To schedule an officer, please email Officer Jason Shier at
vicepresident.epoa@gmail.com. Please include your company name, Point of Contact
(name, phone number, and email), location of the detail, date(s) and time(s) of detail,
and a brief description of what officer will be doing (i.e. directing traffic, closing a traffic
lane, providing security, etc).
• Additionally, if your Point of Contact is NOT the same person to whom the invoice is to
be sent, please include the 'Finance Person's': name, email address, and phone
number.
NOTE: Oficer Shier works a rotating schedule, so to insure that your detail request is
received and reviewed in a timely manner, it is recommended that you call his cell phone
in addition to sending the email.
Rate of Pay: (NOTE: Minimum of 4 hours will be paid to the officer)
• Requests made 7 or more days in advance: The rate of pay for an officer working an off -
duty detail will be $75 per hour.
• Requests made less than 7 days in advance: The rate of pay for an officer working and
off -duty detail will be $80 per hour.
Effective: May 24, 2018
OFF DUTY DETAIL INFORMATION SHEET
• Details that fall on a holiday will be paid at an additional $30 per hour ($105 per hour
with 7 or more days notice/$110 per hour if less than 7 days notice).
List of Holidays:
New Year's Day (January 1)
Washington's Birthday (Third Monday of February)
Independence Day (July 4)
Veteran's Day (November 11)
Friday following Thanksgiving Day
Christmas Day (December 25)
Martin Luther King Day (Third Monday of January)
Memorial Day (Last Monday of May)
Labor Day (First Monday of September)
Thanksgiving Day (Fourth Thursday of November)
Christmas Eve (December 24)
New Year's Eve (December 31)
Cancellations: (Note: date and time of cancellation will be based on the date and time of the
phone call, not email.)
• To cancel an officer, you MUST call Officer Shier at 206-353-2987. Additionally, please
follow up the phone call with an email to vicepresident.epoa@gmail.com requesting
the cancellation If you cancel an officer more than 24 hours before the start of the
detail, you will not be charged for the cancelled detail.
• If you cancel an officer less than 12 hours prior to the start of the detail, you will be
charged for the '4 hour minimum'.
• Administrative fees will still be charged for all details, regardless of when they are
cancelled.
Payment Deadlines:
• If you do not require an invoice, officers are to be paid via check or cash at the start of
the event. (check made payable directly to the individual officer(s).
• If you require an invoice, officers should be paid within two weeks of invoice being
emailed to your Point of Contact (or Finance if provided).
• Delays in paying officers may result in difficulty obtaining officers for future details.
2
Effective: May 24, 2018
Route Overview
Completed By:
W. PASCHAL
Address:
21705 HIGHWAY 99, LYNNWOOD, WA 98036
Completion Date:
2/12/2021
Footages
COMICAST
Survey Revision Date:
New Aerial Coax
0
Overlash Coax
0
New UG Fiber
384
Survey Revision Task ID:
New Aerial Fiber
598
Overlash Fiber
0
Existing UG Fiber
0
Engineered For:
ISP Footage
68
New UG Coax
0
Total Aerial
598
Project Manager:
Conduit Only
0
Existing UG Coax
0
Total Underground
384
P2 ID:
580866
Are Additional Pages Needed
No
Total Private Footage
0
Legend
New Ped ❑
Pole
New Vault ❑V
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
New Tap
Interior Path
❑1
Phase Identifier
Footage Break
Power Supply
Fiber Splice Point
w
Hard Surface Cut
•
Route Overview
Provide Clear Detail about the Project
Construction Notes:
1. TIE POINT AT SP.WALY.0489 IN VAULT
- 4' ROW UG 96C FOC CONDUIT PULL TO EXISTING DOGHOUSE
(EXISTING 2" CONDUIT - PROOF AND PULL)
212' ROW UG 96C FOC CONDUIT PULL TO EXISTING DOGHOUSE
(EXISTING 2" CONDUIT - PROOF AND PULL)
8' ROW UG 96C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
71' ROW UG 96C FOC CONDUIT PULL TO EXISTING PED
(EXISTING 2" CONDUIT - PROOF AND PULL)
48' ROW UG 96C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
25' RISER - EXISTING 2" CONDUIT
2. 452' ROW AERIAL 96C FOC OVERLASH
- INSTALL ENCLOSURE TO TRANSITION 96C TO 12C FOC
3. 146' ROW TO PRIVATE EXT AERIAL 12C FOC OVERLASH
4. 25RISER PRIVATE EXT 12C FOC
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 41' ROW UG 12C FOC CONDUIT PULL
PULL)(EXISTING 2" CONDUIT - PROOF AND
RECEIVED
(EXISTING EXTERIOR POE A BREAKOUT)
B
5. 60' PRIVATE INT 12C FOC INTO BASEMENT CEILING TO IDF
(DROP PANEL CEILINGS TO ROUTE FIBER) FEB
23 2021
8' PRIVATE INT 12C FOC IN IDF
INSTALL EQUIPMENT ON WALL PER POC REQUEST
A
kk
A
STEN021 AA
all
& W-.- - - 0%
fie ,.fL POlt'CLINK Er �.,W •.2001*00.
n+r.�
N
A .
! •�
""waft
'0 AM
ALL ENCLOSUR:2CFOC
PT!RANSTION 96C TO 1
N, ti
0004
-D
TIE POINT @ %•
SP.WALY.0489 1 �•, •
.�
Jt AACk. L T
212' _ !
0
71'
s s
288'
2
3
4
EXISTING POE WITH 2" CONDUIT
AND BREAKOUT ON EXTERIOR
INTO BASEMENT CEILING
Lt a,
ft, �
598 AERIAL'
�pLM JL le
t AAmI
f,
r rnt
25'
RISER
IDF IN
5 BASEMENT
INSTALL
EQUIPMENT ON
WALL PER POC
REQUEST
DEVELOPMENT
SERVICES DEPARTMENT
Right of Way
Completed By:
W. PASCHAL
N
W _ - p E
s
Completion Date:
2/12/2021
Address
21705 HIGHWAY99, LYNNWOOD, WA98036
COMICAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
1
580866
Additional Pages Needed
No
Legend
New Ped ❑
Pole
New Vault ❑V
Lock Box
Existing U/G
FootageExisting
Aerial
Text Box Text
New U/G
Callout Arrow
;
New Aerial
New Tap 0
r
Interior Path
Phase Identifier ❑i
'
Footage Break
Power Supply ■
. %.
Fiber Splice Point H
Co
Hard Surface Cut
I
Right of Way
Provide Clear Detail about the Project
Construction Notes:
1. TIE POINT AT SP.WALY.0489 IN VAULT
- 4' ROW UG 96C FOC CONDUIT PULL TO
EXISTING DOGHOUSE
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 212' ROW UG 96C FOC CONDUIT PULL TO
212'
EXISTING DOGHOUSE
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 8' ROW UG 96C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 71' ROW UG 96C FOC CONDUIT PULL TO
EXISTING PED
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 48' ROW UG 96C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 25' RISER - EXISTING 2" CONDUIT
(PROOF AND PULL) RECEIVE
FEB 23 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
2" CONDUIT
l TIE POINT @
SP WALY,0489It
r � ,
•-yam _
vy •- A.
216TH ST SW
1
4'
TIE POINT r~.�
SP.WALY.0489
i
` 2" CONDUIT �
r
a
atA
EXISTING
DOGHOUSE
1 �HWY99�
�--
i may,
Right of Way
Completed By:
W. PASCHAL
N
q,1J _ p
�4 `
s
Completion Date:
2/12/2021
Address
21705 HIGHWAY 99, LYNNWOOD, WA 98036
COMICAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
580866
Additional Pages Needed
No
Legend
New Ped ❑
Pole 0
New Vault ❑v
Lock Box
,
Existing U/G
Footage
150'
t
'
EXISTING
PEE
'
Existing Aerial
Text Box
Text
`
New U/G
fallout Arrow
—
1
rk '► d,[r. S ,�j '
--
New Aerial --"
EXISTING
_ FxlsTrv6
r PEU
New TapA
DOGHOUSE
25'
_
Interior Path
Phase Identifier
0
--
Footage Break
Power Supply
1
g�
72ND AVE W
HWY99
71' lA
�
8'
Fiber Splice Point H
Hard Surface CutCED
OC
d�
'
' ., • .
'1°���P,
;'•
.� �`�
•-
`
Right of Way
slJ,
-� .114
Provide Clear Detail about the Project
212'
`
. —
Construction Notes:
y... r -.3
• 1_
�' ..'�.
I-
1. TIE POINT AT SP.WALY.0489 IN VAULT-
•' -.
- 4' ROW UG 96C FOC CONDUIT PULL TO
'
�' �.:`s I+r•r+•.
"�
_
EXISTING DOGHOUSE10
(EXISTING 2" CONDUIT - PROOF AND PULL)
J
- 212' ROW UG 96C FOC CONDUIT PULL TO
~•
EXISTING DOGHOUSE',
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 8' ROW UG 96C FOC CONDUIT PULL
ti
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 71' ROW UG 96C FOC CONDUIT PULL TO
2" CONDUIT
"r+
EXISTING PED
s*
-
(EXISTING 2" CONDUIT - PROOF AND PULL)
++
- 48' ROW UG 96C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
2" CONDUIT
2" CONDUIT
(PROOF AND PIG
PULL) RECEIVED
r
,.
FEB
23 2021
Ar
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Right of Way
Completed By:
W. PASCHAL
�j ,,. .. p • ' " rE
.s�
Completion Date:
2/12/2021
Address
21705 HIGHWAY 99, LYNNWOOD, WA 98036
110 ?ASurvey
COMCAST
Survey Revision Date:
Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
580866
Additional Pages Needed
No
Legend
New Ped ❑
Pole
New Vault ❑v
Lock Box
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial — — — — —
New Tap
0
Interior Path — — — —
Phase Identifier
❑i
Footage Break
■
Power Supply
Fiber Splice Point H
Hard Surface Cut
•
Right of Way
Provide Clear Detail about the Project
Construction Notes:
1. 71' ROW UG 96C FOC CONDUIT PULL TO
EXISTING PED
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 48' ROW UG 96C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 25' RISER - EXISTING 2" CONDUIT
(PROOF AND PULL)
2. 19' ROW AERIAL 96C FOC OVERLASH
- 101' ROW AERIAL 96C FOC OVERLASH
- 44' ROW AERIAL 96C FOC OVERLASH
- 288' ROW AERIAL 96C FOC OVERLASH
- INSTALL ENCLOSURE TO TRANSITION 96C
TO 12C FOC
3. 146' ROW TO PRIVATE EXT AERIAL 12C FOC
OVERLASH RECEIVED
FEB 23 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
2 _
216TH ST SW
288'
E do
�01
216TH ST SW
3
INSTALL ENCLOSURE TO 146
TRANSITION 96C TO 12C FOC
Right of Way
Completed By:
W. PASCHAL
N
W _ • o _
s
Completion Date:
2/12/2021
Address
21705 HIGHWAY99, LYNNWOOD, WA98036
COMICAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
580866
Additional Pages Needed
No
Legend
New Ped ❑
Poles--'
New Vault ❑V
Existing U/G
Lock Box
Footage
150'
-!-
"• -
a
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial r—"
New Tap
INSTALL ENCLOSURE TO
— -
Interior Path
Phase Identifier
❑i
_ — _----
TRANSITION 96C TO 12C FOC
146'
Footage Break
Power Supply
PS
Fiber Splice Point H
co
Hard Surface Cut
OC
288
_
EE
Right of Way
HWY99
Provide Clear Detail about the Project
INSTALL ENCLOSURE TO
-
21705
Construction Notes:
TRANSITION 96C TO 12C FOC
- ..r
2. 19' ROW AERIAL 96C FOC OVERLASH
- 101' ROW AERIAL 96C FOC OVERLASH
- 44' ROW AERIAL 96C FOC OVERLASH
146'
- 288' ROW AERIAL 96C FOC OVERLASH
- INSTALL ENCLOSURE TO TRANSITION 96C
-
TO 12C FOC
M
�'
_
��
3. 146' ROW TO PRIVATE EXT AERIAL 12C FOC
,
_
BREAKOUT / POE
OVERLASH
-
r.
25
INTO BASEMENT
CEILING VOID
4. 25' RISER PRIVATE EXT 12C FOC
2" CONDUIT PROOF AND PULL)-
�
- - �.,.�-.
(EXISTING -
- 41' ROW UG 12C FOC CONDUIT PULL
4
(EXISTING 2" CONDUIT - PROOF AND PULL)
amp-
- -
(EXISTING EXTERIOR POE AT BREAKOUT)
_
5. 60' PRIVATE INT 12C FOC INTO BASEMENT
HwY 99
A
CEILING�:':...
RECEIVED
r
41,Ar21705
FEB 23 2021
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Private Exterior
Completed By:
W. PASCHAL
,
Completion Date:
2/12/2021
Address
21705 HIGHWAY 99, LYNNWOOD, WA 98036
Survey Revision Date:
COMICAST
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
W _ O
Engineered For:
Project Manager:
-
`S
P2 ID:
580866
Additional Pages Needed
No
Legend
New Ped
❑
Pole
New Vault
FYI
Lock Box
■
Existing U/G
Footage
150'
Existing Aerial
Text Box
Text
New U/G
Callout Arrow
New Aerial
New Tap
0
Interior Path
Phase Identifier
❑i
Footage Break
■
Power Supply
Fiber Splice Point
H
Hard Surface Cut
Private Exterior
Provide
Clear
Detail about the Project
Construction Notes:
3. 146' ROW TO PRIVATE EXT AERIAL 12C FOC
OVERLASH
4. 25' RISER PRIVATE EXT 12C FOC
(EXISTING 2" CONDUIT - PROOF AND PULL)
- 41' ROW UG 12C FOC CONDUIT PULL
(EXISTING 2" CONDUIT - PROOF AND PULL)
(EXISTING EXTERIOR POE AT BREAKOUT)
5. 60' PRIVATE INT 12C FOC INTO BASEMENT
CEILING
RECEIVED
FEB 23 2021 :• `
Z
5
POE INTO BASEMENT
FROM BREAKOUT BOX
.� ON EXTERIOR
III
DEVELOPMENT
SERVICES DEPARTMENT
Private Interior
Completed By:
W. PASCHAL
N,
Completion Date:
2/12/2021
Address
21705 HIGHWAY99, LYNNWOOD, WA98036
Survey Revision Date:
'•,
COMICAST
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
"
Engineered For:
Project Manager:
-
s
P2 ID:
580866
Additional Pages Needed
No
Legend
New Ped
❑
Pole
New Vault
❑V
Lock Box
Existing U/G
Footage
Existing Aerial
Text Box
New U/G
Callout Arrow
New Aerial
New Tap
Interior Path
Phase Identifier
Footage Break
Power Supply
Fiber Splice Point
H
co
Hard Surface Cut
Private Interior
Provide
Clear
Detail about the Project
Construction Notes:
5. 60' PRIVATE INT 12C FOC INTO BASEMENT
CEILING TO IDF
(DROP PANEL CEILINGS TO ROUTE FIBER)
- & PRIVATE INT 12C FOC IN IDF
- INSTALL EQUIPMENT ON WALL PER POC
REQUEST
150'
Text
0
❑1 POC FROM EXTERIOR
BREAKOUT BOX INTO
BASEMFNT
O
Ui.
RECEIVED
FEB 23 2021
61
60'
DEVELOPMENT
SERVICES DEPARTMENT
Private Interior
Completed By:
W. PASCHAL
Y
dill _ O E
r`
's
Completion Date:
2/12/2021
Address
21705 HIGHWAY99, LYNNWOOD, WA98036
COMCAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
580866
Additional Pages Needed
No
Legend
New Ped ❑
Pole
New Vault ❑V
Lock Box
Existing U/G
Footage 150'
Existing Aerial
Text Box Text
New U/G
Callout Arrow ,
New Aerial
New Tap A
60' 5
Interior Path
Phase Identifier 0
Footage Break
Power Supply
DROP
Fiber Splice Point
Hard Surface Cut •
PANEL
CEILING
Private Interior
Provide Clear Detail about the Project
Construction Notes:
5. 60' PRIVATE INT 12C FOC INTO BASEMENT
CEILING TO IDF
(DROP PANEL CEILINGS TO ROUTE FIBER)
- 8' PRIVATE INT 12C FOC IN IDF
- INSTALL EQUIPMENT ON WALL PER POC
REQUEST
RECEIVED I INSTALL
EQUIPMENT
FEB 23 2021 ON WALL
PER POC
IDF OTHER
SIDE OF
WALL
BASEMENT IDF
BASFMFNT
U I Y ur tulvluNub
DEVELOPMENT
SERVICES DEPARTMENT