Loading...
Building Inspection CardTo Schedule your inspection(s) go to: Building Department Inspections can be scheduled up to 7:00 B - building: AM on any given business day. Please schedule online or call 1. Go to: www.edmondswa.gov 425.771.0220 during business hours. 2. Then: Services 3. Then: Permits/Development 4. Then: Online Permit Info 5: If you don't have one already, create a login (upper right hand corner) 6: Schedule your inspection Engineering Inspections require 24 hours notice. Fire Inspection availability can vary - Please call 425.775.7720 to schedule. Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY Status: ISSUED Parcel No:00434600007901 Site Address: 9527 190TH PL SW EDMONDS, WA98020 Issued: 1/22/2020 Finaled: Permit Expiration: 1/22/2021 WORK DESCRIPTION : NEW SFR, PLUMBING AND MECHANICAL INCLUDED FIRE SPRINKLER UNDER SEPARATE PERMIT CONSTRUCTION HOURS ARE 7AM - 6PM ON WEEKDAYS, 10AM - 6PM SATURDAYS NAME TYPE NAME CONTACTS ADDRESS PHONE dM EMAIL APPLICANT STROBL DESIGN PO BOX 20764, SEATTLE WA 98102 (206)661-3622 JACOB@STROBLDESIGN.COM CONTRACTOR PETERSON CUSTOM HOMES 2114 120TH PL SW, EVERETT WA 98204 (206)351-7255 PCHBUILDER@MSN.COM OWNER CHAK AND EVA AW 114 N 200TH ST, SHORELINE WA 98133 (425)785-2038 CHAKAW63@GMAIL.COM SEQID INSPECTION TYPE INSPECTOR INSPECTIONS COMPLETED RESULT DATE NOTES B-6 BUILDING FINAL" OTHER - BUILDING E-2 TESC AND MOBILIZE B-1 BUILDING PRECON B-2 FOOTINGS B-2 FOUNDATION DRAIN B-2 FOUNDATION WALL B-2 PIER FOOTINGS B-2 RETAINING WALL r7B-2 SETBACKS Printed: Tuesday, January 21, 2020 9:33:27 AM 1 of 2 Inspection www.edmondswa.gov Progress Card PERMITConstruction NUMBER BLD2019-0116 B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 HEIGHT VERIFICATION B-2 SLAB INSULATION B-3 GAS PIPING TEST B-3 LATH B-3 MECH ROUGH IN B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-5 INSULATION ENERGY E-3 STRM TIGHTLINE E-4 DRIVE WIDTH SLOPE B-4 FRAMING B-3 ROOF SHEATHING B-4 INTERIOR SHEATH E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-4 DW TRENCH E-4 RET WALL DRAIN E-4 WATER SERVICE LINE E-6 ENGINEERING FINAL Printed: Tuesday, January 21, 2020 9:33:27 AM 2 of 2