Loading...
2388_001C � ENGINEERING September 16, 2019 JoAnne Zulauf City of Edmonds 121 5th Ave N Edmonds, WA 98020 civil & structural engineering & planning RE: Permit Number: BLD20190116 Project Name: Aw - Single Family Residence Project Address: 9527 190th PI SW Dear Ms. Zulauf, itemized below is our response to the review comments dated September 11, 2019 for the above referenced project. Our response appears in bold. Engineering Review Division: Site Frontage 1. Show curb ramp on west side of OVD. Curb ramp is now shown. 2. Label asphalt sidewalk on west side of OVD. Label added. 3. Label center line on OVD. Label added. 4. Add to Paint Crosswalk call out that Existing Crosswalk will be removed, crosswalk realigned. Callout revised. 5. At the southeast corner of intersection of 190th, add notes to remove existing fogline, realign, and paint. Fogline callout revised. 6. The 4 x 4 landing for the crosswalks at the southeast corner of the intersection shall be behind the realigned fogline. R E S t 1 B Landing added and called out. 'SEP 19 2019 BUILDING !-)rPARTME11,1T (,'I Y 0r: E DMONr)S 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778,8500 1 f.425,778.5536 www.cgengineering.com Aw Residence Comment Response September 16, 2019 Page 2 of 2 The current alignment of the proposed curb ramp puts the 4 x 4 landing in the drive lane. Redesign to correct. Revised. 1901h crosswalk was moved east slightly and OVD crosswalk has been revised based off the centerline (per the City's detail) and offset similar to existing OVD crosswalk. 8. At the east end of the proposed sidewalk should be a 4x4 landing. Please revise plans. Revised. Landing delineated and callout added. If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, CG engineering Gre Gui en, PE, SE Principal 250 4th Avenue South, Suite 200 Edmonds, WA 98020 C ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com ENGINEERING