AW Residence Grading Extension-Wet SeasonAw Residence Revised September 6, 2019 9527 190th Place SW Project #18102 Edmonds, Washington Strobl Design LLC iacob@strobidesign.com �p P IN Attention: Jacob Strobl "J Subject: Grading Season Extension —Aw Residence q lotzbIg City of Edmonds Permit #: BLD20190116 Mr. Strobl: The purpose of this letter is to provide our opinion with respect to a grading season extension. Based on our recent correspondence, it is our understanding that the normal grading season restriction for geologically hazardous areas is from October 111 through May 1st. To facilitate efficient construction, a reduction of the grading restriction is desired. For the sake of brevity, we presume that people reading this letter are highly familiar with the subject property and the proposed development. The remainder of this letter will set forth our opinions on extending the grading season for the proposed development of the subject property. Summary of Soil Conditions and Statement of Minimal Risk The native Vashon advance outwash soils are dense in -place, relatively permeable, and moderately resistant to erosion, except when subjected to concentrated flows. Based on our review of the site topography, the native soils present, and the proposed grading and temporary erosion and sediment control plan prepared by CG Engineering, it is our opinion that the site work may be performed through the wet season and this construction, the areas disturbed by construction will remain stable, there will not be an increase in the potential for soil movement, and the risk of damage to the subject property and adjacent properties will be minimal. Review of Wet Season Work Schedule Though some weather work is required to facilitate timely construction, it is our understanding that there is an intent to limit earthwork during the wet season. The intent is to start construction in mid -September and to have the foundation excavation, foundation concrete placed, and foundation backfill, and temporary soil stabilization completed by mid -November. Then final grading and landscaping will be completed next year. The following contractor schedule was provided via e-mail for our review by Strobl Design: Start: Mid -September • Grub site, install filter and high visibility fencing, construction entrance ,remove certain trees, remove stumps, haul logs. • 2-weeks • Excavate for foundation including removal of unsuitable soil, import and compaction of compactable soil if necessary. • 1-week • install foundation. Waterproofing, footing and roof drainage. • 3-weeks. SOUTH FORK GEOSCIENCES, PLLC Page 1 PO Box 1 275 NORTH BEND, WA 98045 425-890-4858 1 INFO@SFG EO. CO M Aw Residence Revised September 6, 2019 9527 1901h Place SW Project #18102 Edmonds, Washington • Backfill • 1-week TESC. as required. • 1-week Total - 8 weeks This construction scheduling and phasing is consistent for the standard of practice for the Puget Sound region. As previously stated, it is our opinion that the site work may be performed through the wet season and this construction, the areas disturbed by construction will remain stable throughout construction. Closure We have enjoyed working with you and we are confident that this letter will aid in the permitting roject. If there are any questions, please feel free to contact us. Sincer 8S Andrew L. Glandon An , Engineering Geologist / Owner South Fork Geosciences, PLLC Cc: City of Edmonds Attention: Building Department SOUTH FORK GEOSCIENCES, PLLC Page 2 PO Box 1 275 NORTH BEND, WA 98045 42 5-890-4858 1 I N FOCaSFG EO. CO M Szafran, Michele From: Jacob Strobl <jacob@strobldesign.com> Sent: Friday, September 6, 2019 10:23 AM To: Szafran, Michele Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension Hi Michele, Per our phone call, final grading would not occur until the summer of 2020. Thanks, Jacob STROBL DESIGN LLC 206.661.3622 strobldesign.com From: Jacob Strobl [mailto:jacob@strobldesign.com] Sent: Friday, September 06, 2019 9:40 AM To:'Szafran, Michele' <Michele.Szafran@edmondswa.gov> Cc:'ChakAw' <chakaw63@gmail.com>;'EVA PETERSON' <pch builder@ msn.com>; 'Andrew Glandon' <Andrew@sfgeo.com> Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension Hi Michele, Please see the updated letter addressing your comments in your email below regarding timeline. Let me know if you need any additional information. Thanks, Jacob STROBL DESIGN LLC 206.661.3622 strobldesign.com From: Szafran, Michele[maiIto: Michele.Szafran @edmondswa.gov] Sent: Thursday, September 05, 2019 9:46 AM To: 'Jacob Strobl' <iacob@strobldesign.com> Cc:'ChakAw' <chakaw63@gmail.corn>;'EVA PETERSON' <pchbuilder@msn.com> Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension Jacob, The seasonal restrictions are from October thru April so any ground disturbing activity during this time should be clearly addressed by the Geotech. The remaining question regarding the Grading Season Extension letter is what ground disturbing activity will take place after mid -November? The letter states that final grading and landscaping can be completed next year, if that's January next year that would need to be in the letter, or if that's April then state that.