STORM1_Review CommentsTo: Date: Project Name: STO RM WATE R REVIEW COMMENTS City of Edmonds Engineering Division Applicant March 5, 2019 Aw Residence Permit Number: BLD20190116 Address: 9527 190t" PL W Review Type: Building (SFR) Submittal Date: 1/30/2019 Reviewer: Zack Richardson, PE City of Edmonds, Stormwater Engineer Recommendation: I recommend that BLD20190116 be withheld until the comments below are adequately addressed. Review Comments: 1. General: It is not clear that sufficient testing was done to establish a measured infiltration rate as required by ECDC 18.30 and 2014 SWMMWW; review Edmonds Addendum Appendix B and revise geotechnical information as needed to ensure infiltration rate is measured and adjusted consistent with the requirements. a. It appears that on -site testing was not performed and grain -size analysis was not performed and therefore it does not appear that a site -specific infiltration rate was measured. b. It is not clear that the stipulated correction factors have been applied to the measured rate. c. The report does establish a medium SAND at the infiltration layer (EP2 does note gravel but appears further from the trench than EP1 & EP3 which do not note any gravel) which, per the prescriptive sizing for downspout full infiltration (Edmonds Checklist #13), would suggest more like 150' of typical trench is required (75' at the doubled -depth proposed): 4,986 / 1000 X 30 = 150' 2. Report: Update report text to acknowledge the bypass flows from the ROW portion of driveway and state how they are mitigated (ie. oversized infiltration trench, etc). Page 1 of 2 3. C3.1: Show/list the existing invert elevation at the connection CB in the south- west corner. 4. C3.1: Label/callout the roof and footing stub connection points (where it joins the lines surrounding the structure) as "Connect roof drains only" and "Connect footing drain only" as appropriate. Page 2 of 2