Building Permit 2020D • Permit
PERMIT NUM
of Edmonds
EdmondsCity
0, 9:01 1 •
www.edmondswa.gov
OAL
Type: DEMO Owner/ Business: GEORGE PEPPIN Status: ISSUED
Subtype: RES SECONDARY DEMO
Parcel No: 00614600000400 Site Address: 8615 193RD PL SW EDMONDS,WA 98026-6132
Applied: 12/4/2020
Subdivision: SP PLN-2010-0018, 006146 Lot: 0
Issued: 12/17/2020
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $0.00 Occupancy Type: Construction Type:
Expiration Date: 6/17/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: WAC
Scope of Work: POOL DEMO
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTSIL g
NAME TYPE
NAME
ADDRESS T
PHONE
EMAIL
APPLICANT
GEORGE PEPPIN
8615 193RD PL SW, EDMONDS
(425)744-5624
G-PEPPIN@HOTMAIL.COM
WA 98026
CONTACT
GEORGE PEPPIN
8615 193RD PL SW, EDMONDS
(425)744-5624
g-peppin@hotmail.com
WA 98026
CONTRACTOR
CONTRACTOR UNKNOWN
OWNER
GEORGE & NANETTE PEPPIN
8615 193RD PL SW, EDMONDS
(425)744-5624
WA 98026
INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
12/6/20
R8945
PER PERMIT
DEMO - INTERIOR OR SECONDARY
001.000.322.10.000.00
$150.00
$150.00
12/6/20
R8945
STRUCTURE
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
12/6/20
R8945
TOTALS: $196.50 $196.50
7
CONDITION TYPE
STATUS1
NOTES
Printed: Thursday, December 17, 2020 9:24:39 AM 1 of 2
DTMO Permit
PERMIT NU
City of Edmonds
I
. 9:0020
www.edmondswa.gov
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
O
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
70M
R-1 :91 *10111 Eel L1
1 0 - so
COMPLETED RES
SEQID
INSPECTION TYPE
INSPECTOR
DATE
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
E-9 COMPOST AMEND
X-2 ENGINEERING FINAL
Printed: Thursday, December 17, 2020 9:24:39 AM 2 of 2