APPROVED PLN ENG BLD BLD2020-1351 PLAN SETDemetri's Woodstone Taverna 101 Main St, Edmonds, WA 98020 Temporary Tents Anchoring Details = Tied Off to Rail = 200# Steel Weights FLOOR PLAN = Drop-in Anchor Points (drilled into concrete pillars) These anchors measure 1” round and 3” long. We use a concrete drill with a 7/8” bit and go down about 3 ¼”. The hole is blown out to remove concrete dust. The anchor is tapped into the hole and set into the surface. A ¾” eyebolt is screwed into the anchor, which is what we use to hook the ropes or ratchet straps to. = Staked into Gravel (leg falls outside of deck) 42" Double Headed Metal Tent Stake WATER /FERRYTERMINALMAIN STREET X DOOR IndoorDiningRoomDeck guardrail RECEIVED Dec 09 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2020-1351 City Of Edmonds Building Department Work Address Owner Approved Date Building Official Permit Number TEMP TENTS 101 MAIN ST DEMETRIS 12/11/2020 BLD2020-1351 CITY OF EDMONDS BUILDING DIVISION APPROVED PLAN APPROVED PLANS MUST BE ON JOB SITE Page 1 of 3 10x10 Clear 10x20 Clear 15x 15 Clear Demetri's Woodstone Taverna 101 Main St, Edmonds, WA 98020 Temporary Tents SEATING PLAN DOOR Indoor DiningRoomRECEIVED Dec 09 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2020-1351 TENT PERMIT CONDITIONS 1. Occupant load shall comply with state regulations. 2. Tent structure is not to be occupied during heavy snow events. 3. Tent structure is not to be occupied during high wind events. 4. This permit is temporary and tent structure must be removed no later than 60 days after permit is issued. 5. Pre-occupancy inspections by Fire and Building inspectors required. 6. Post-removal inspection by Building inspector is required. 7. Installation, use and maintenance of equipment and components shall be per manufacturer’s specifications, installation instructions, and applicable state codes. 8. Heating equipment must be approved by Fire Marshal. 9. All governor-issued orders and guidelines related to COVID 19 must be observed. Page 2 of 3 WATER / FERRYTERMINALMAIN STREET •10x10 Clear •10x20 Clear •15x15 Clear •Walls on west, north, and south sides of tent •North and south sides will have slider cables to act as doors •X = Exit Sign •Red Box =propane heater •Blue Line = External Gutter, rests against building, not attached to,water discharge inside the deck •Brown Line =deck railing X DOOR Demetri's Woodstone Taverna 101 Main St, Edmonds, WA 98020 Temporary Tents SITE PLAN Indoor DiningRoomAnchoring–see separate pages for specs = Tied Off to Rail =Staked into Gravel (legs falls outside of deck) =Drop-in Anchor Points (drilled into concrete pillars) = 200# Steel Weights Property boudary Side walk –main street Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. RECEIVED Dec 09 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Shall be staked on subject site, not BNSF ROW BLD2020-1351 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE ***Surface water runoff from the tents shall not discharge onto neighboring properties (including the City right-of-way).*** ENGINEERING DIVISION APPROVED AS NOTED __________________12/11/2020 Page 3 of 3 APPROVED BY PLANNING Dec 14 2020