Loading...
Building Permit 2020PermitMECHANICAL PERMIT NU of Edmonds EdmondsCity 98020 BLD2020-0617 www.edmondswa.gov Type: MECHANICAL Owner/ Business: MACKENZIE AFDEM Status: READY TO ISSUE Subtype: COMMERCIAL MECHANICAL Parcel No: 27043000403500 Site Address: 22618 HIGHWAY 99EDMONDS,WA98026-8395 Applied: 6/15/2020 Subdivision: 005278 Lot: 0 Issued: Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: Scope of Work: BOO HAN MARKET - REFRIGERATED CASES, REPLACE LIKE FOR LIKE WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MACKENZIE AFDEM 5102 20TH STREET EAST #102, (253)844-2943 MAFDEM@RU-INC.COM FIFE WA98424 CONTACT REFRIGERATION UNLIMITED 5102 20TH STREET EAST #102, (253)844-2943 mafdem@ru-inc.com FIFE WA98424 CONTRACTOR REFRIGERATION UNLIMITED 5102 20TH ST E 102, FIFE WA (205)474-3100 mafdem@ru-inc.com INC 98424 3880 STEILACOOM BLVD, OWNER BOO HAN PLAZA III LLC LAKEWOOD WA 98499 • ' I • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 7/1/20 R6107 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/1/20 R6107 PER PERMIT MECHANICAL PLAN REVIEW FEE 001.000.345.83.000.00 $110.00 $110.00 7/1/20 R6107 MISC MECHANICAL EQUIPMENT 001.000.322.10.000.00 $120.00 $120.00 7/1/20 R6107 FOR WHICH NO FEE IS INDICATED TOTALS: $320.00 $320.00 77 CONDITION TYPE STATUS NOTES Printed: Wednesday, July 01, 2020 2:52:59 PM 1 of 2 PermitMECHANICAL PERMITNU City • • • • •:• • 1 1 3 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests ALL BUILDING PERMITS FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, FOR employees, and agents from any and all claims for damages of whatever nature, arising HOLD HARMLESS INFORMATION directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. SM COMPLETED RESULT 7ID INSPECTION TYPE INSPECTOR DATE ME X-0 CH F INAL" B-3 MECH EQUIP ATTACHMENT Printed: Wednesday, July 01, 2020 2:52:59 PM 2 of 2