Loading...
Building PermitPermit PERMIT NU City of Edmonds . •:� 1 1I iL www.edmondswa.gov Type: SOLAR Owner/ Business: ADAM LEE Status: ISSUED Subtype: SOLAR RESIDENTIAL Site Address: 19311 OLYMPIC VIEW DR EDMONDS,WA 98020- Parcel No: 00434600008602 Applied: 4/13/2021 2561 Subdivision: 005319, 007369, 004346, SP S-17-87 Lot: 0 Issued: 4/13/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 10/10/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: PERRY- ROOFTOP SOLAR WA State Contractor L & I #: PUGETSS920RH City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ADAM LEE 5308 BAKER AVE NW, SEATTLE (206)706-1931 INFO@PUGETSOUNDSOLAR.COM WA 98107 CONTACT PUGET SOUND SOLAR 5308 BAKER AVE NW, SEATTLE (425)260-7280 ayoung@pugetsoundsolar.com WA 98107 CONTRACTOR PUGET SOUND SOLAR LLC 5308 BAKER AVE NW, SEATTLE (206)706-1931 info@pugetsoundsolar.com WA 98107 OWNER KYLEENE E TTEE PERRY 19311 OLYMPIC VIEW DR, (585)339-8111 EDMONDS WA 98020 FEE INFORMATION DESCRIPTION ACCOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/13/21 R11625 PER PERMIT RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/13/21 R11625 SOLAR - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $60.00 $60.00 4/13/21 R11625 SOLAR - SUB RES FIRE INSP FEE 001.000.342.40.000.00 $60.00 $60.00 4/13/21 R11625 TOTALS: $166.50 $166.50 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, April 13, 2021 2:43:13 PM 1 of 2 10LAR Permit PERMIT NUM of Edmonds EdmondsCity 9:01 1 • www.edmondswa.gov/425.77 • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Tuesday, April 13, 2021 2:43:13 PM 2 of 2