Building Permit 2020Permit
PERMIT NU
City of Edmonds
I
It
EdmondsSIGN
121 5th Ave N, 98020
BLD2020-1216
www.edmondswa.gov
jM01111111h&
—
Type: SIGN
Owner/ Business: FRANCES CHAPIN
Status: ISSUED
Subtype: SIGN - WALL OR GENERAL
Parcel No: 00434202100100 Site Address: 118 5TH AVE N EDMONDS,WA 98020-3145
Applied: 11/6/2020
Subdivision: 004342
Lot: 0
Issued: 11/18/2020
Fire Sprinklers: Lot
Area: Zoning:
Final:
Valuation: $0.00 Occupancy Type: Construction Type:
Expiration Date: 5/17/2021
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: NED
Scope of Work: MUSEUM ART SIGN
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
FRANCES CHAPIN
121 5TH AVE N, EDMONDS WA
(425)771-0228
FRANCES.CHAPIN@EDMONDSWA.GO
98020
V
CONTACT
CITY OF EDMONDS
121 5TH AVE N, EDMONDS WA
(425)771-0228
frances.chapin@edmondswa.gov
98020
CONTRACTOR
OWNER
250 5TH AVE N, EDMONDS WA
OWNER
EDMONDS CITY OF
98020-3146
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/16/20
R8598
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
11/16/20
R8598
SIGN - BLDG PERMIT FEE
001.000.322.10.000.00
$55.00
$55.00
11/16/20
R8598
SIGN - ENG INSP FEE
001.000.341.82.000.00
$55.00
$55.00
11/16/20
R8598
SIGN - ENG REVIEW FEE
001.000.341.82.000.00
$25.00
$25.00
11/16/20
R8598
SIGN - PLAN REVIEW FEE
001.000.345.83.000.00
$30.00
$30.00
11/16/20
R8598
TOTALS: $230.00 $230.00
CONDITIONS
CONDITION TYPE
STATUS NOTES
Printed: Wednesday, November 18, 2020 9:37:36 AM 1 of 2
SIGN Permit
PERMIT NUM
City of Edmonds
. •:� 1 1-12116-
www -.
•. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities
DAMAGE TO FRONTAGE
FOR
and/or frontage improvements in city right of way per city standards that is caused by or
IMPROVEMENTS
INFORMATION
occurs during the permitted project.
ESC REQUIRED
FOR
Maintain erosion & sediment control per city standards.
NFORMATION
Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees
to indemnify defend and hold harmless the City of Edmonds, Washington, its officials,
FOR
employees, and agents from any and all claims for damages of whatever nature, arising
HOLD HARMLESS
INFORMATION
directly or indirectly from the issuance of this permit. Issuance of this permit shall not be
deemed to modify, waive or reduce any requirements of any City ordinance nor limit in
any way the City's ability to enforce any ordinance provision.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays
SOUND OR NOISE
INFORMATION
and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
• •NS
- Schedule •https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL
B-4 FRAMING
B-2 FOOTINGS
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
Printed: Wednesday, November 18, 2020 9:37:36 AM 2 of 2