Loading...
Building Permit 2020Permit PERMIT NU City of Edmonds I It EdmondsSIGN 121 5th Ave N, 98020 BLD2020-1216 www.edmondswa.gov jM01111111h& — Type: SIGN Owner/ Business: FRANCES CHAPIN Status: ISSUED Subtype: SIGN - WALL OR GENERAL Parcel No: 00434202100100 Site Address: 118 5TH AVE N EDMONDS,WA 98020-3145 Applied: 11/6/2020 Subdivision: 004342 Lot: 0 Issued: 11/18/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 5/17/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: MUSEUM ART SIGN WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT FRANCES CHAPIN 121 5TH AVE N, EDMONDS WA (425)771-0228 FRANCES.CHAPIN@EDMONDSWA.GO 98020 V CONTACT CITY OF EDMONDS 121 5TH AVE N, EDMONDS WA (425)771-0228 frances.chapin@edmondswa.gov 98020 CONTRACTOR OWNER 250 5TH AVE N, EDMONDS WA OWNER EDMONDS CITY OF 98020-3146 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/16/20 R8598 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 11/16/20 R8598 SIGN - BLDG PERMIT FEE 001.000.322.10.000.00 $55.00 $55.00 11/16/20 R8598 SIGN - ENG INSP FEE 001.000.341.82.000.00 $55.00 $55.00 11/16/20 R8598 SIGN - ENG REVIEW FEE 001.000.341.82.000.00 $25.00 $25.00 11/16/20 R8598 SIGN - PLAN REVIEW FEE 001.000.345.83.000.00 $30.00 $30.00 11/16/20 R8598 TOTALS: $230.00 $230.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, November 18, 2020 9:37:36 AM 1 of 2 SIGN Permit PERMIT NUM City of Edmonds . •:� 1 1-12116- www -. •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, FOR employees, and agents from any and all claims for damages of whatever nature, arising HOLD HARMLESS INFORMATION directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays SOUND OR NOISE INFORMATION and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • •NS - Schedule •https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-7 BUILDING OTHER INSP X-3 BUILDING FINAL B-4 FRAMING B-2 FOOTINGS A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL Printed: Wednesday, November 18, 2020 9:37:36 AM 2 of 2