APPROVED ENG BLD - ED M Canopy Final Assembly V.2 with PolycarbonateS-2
W-2
N
0
00
C-1
1
W_1 Face
i S-1
TOP VIEW
S-3
C-2
S-1
C/L C/L
T-6"
(90")
S-5
Drill (3) Qty 3/4" dia. weep holes -
for water drainage. Holes for rear (lower) angle only.
S-3 With (3) Qty holes each; hole dia. sized
I to accommodate 1/2" lag screws.
Note: Concrete Footings provided by City of Edmonds
Description: (2) Qty. 2' Dia. Recommended Min. depth 3'
set in 95% compacted soil base. Use standard
/ sono tube as form work. Concrete poured in place
or pre -cast. Note: Necessary soil prep and
steel rebar configuration and final depth of footing
as required to support canopy structure
to be determined by C of E Parks & Rec.
C-1 C-2
FRONT VIEW
C/L 1/4" Drill Hole
C/L 1/4" Drill Hole
co
S-5 (lower)
' S-2
MATERIAL SPECIFICATIONS
Steel: Note: All welds continuous. fillet on exposed surfaces
Carbon Tube Steel:
S-1 2x4" wall gauge 1/8" 4.75 Ibs/ft
S-2 4x6" wall guage 1/8" 8.16 Ibs/ft
S-3 3x2" wall guage 1/8" 3.90 Ibs/ft
Steel Angle
S-4 2x2"x1/8"
Steel Angle (for polycarbonate retainers)
S-5 1"x1"x 3/16"
S-6 3/4"x3/4"x1/8"
Wood: (Artist Carvings not shown- refer to concept drwg.)
W-3 W-1 Center Panel 36"x72"x4"th.
W-2 Left Column Wrap
W-3 Right Column Wrap
\P-1 Polycarbonate: Clear Sheet 1/2"th.
P-1 Canopy Top 36-1/2" x 96"
\ Vinyl Film: Frosted Etch Computer Cut -Decorative Art Pattern
V-1: Applied second surface (underside of P-1), not
S-5 (upper) shown here -refer to sheet 3 for details.
Concrete: Two post foundation footings as shown
C-1&2 24"dia.x 36"depth sono tube, poured in place.
Standard rebar cage to meet engineer requirements
to be determined by concrete contractor.
S-5 Upper frame rail
P-1 Polycarbonate Sheet
S-1
Canopy Top Supports
co
S-5 Lower frame rail
S-2
Vertical Columns
S-4
M
(4) Qty holes (each
angle piece)
note: hole
dia. sized to
accommodate
1/2" dia lag screws
after powder coating.
o 4
ti
ATTACHMENTS:
1. Canopy Anchorage Connection to Concrete
Steel, S-1, at base plate to concrete, C-1.
Attach w/(8) qty. 1/2" dia. all thread anchors,
Embed 4"min. w/Simpson set-3G Adhesive.
2. Wood center panel to horizontal steel tubes. S-3
Attach w/ (6) qty. 1/2" dia. x 4"L. Lag screws+washers.
3. Wood column wraps to steel angle, S-2.
Attach each w/ (8) qty. 1/4" dia. x 2"min. depth. (field verify).
4. Polycarbonate,P-1, insert sheet into steel retainers S-5 & S-6
Secure w/ (8) qty. 1/4 x 20 hex head S.S. stud bolt 1"L, or as reqr'd.
FINISH:
1. Steel- all surfaces powder coat finish to match
existing Bell Tower & Signs on site.
2. Wood- as specified by carver.
3. Concrete footings: natural smooth sacked finish at top.
HARDWARE:
1. All hardware to be non -corrosive.
cy
A �s�e 'Po'
�% ok,
,OoLcdrbo
12df
eshe_f eJ
I
0
S-3
CD
N
END VIEW
................................................
Install per manufacturers
specifications. Have all
manufacturer
documentation on site.
...............................................:
S-5 (lower frame rail)
RECEIVED
Nov 06 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Environmental 114 4th Ave. N Project: Edmonds Museum Clayton Moss Sheet 1 of 3
A
Graphics & Signage Edmonds, WA. North Plaza Canopy FABRICATION DRAWING - FOR CONSTRUCTION Drawing Date : 2.15.20 Designer: moss @ formaseattle.com
98020
Direct: 206.920.5912
Upper retain(
(front)
Set Screws:
stainless steel (4) qty
per support angle
Weld as
regr'd to /
secure
support
angle to
frame
1
Detail: Polycarbonate
Typical for both
End View
Frame Rails
weld to S-2
Retainer -
upper & lower
)wer retainer
3ar)
Support Angle Clip
3/4"x3/4" x 1 /8"
steel, (continuous)
1 "x1 "x 3/16" steel
............................................
Install per manufacturers
specifications. Have all
manufacturer
documentation on site.
40" (steel frame structure)
*36-1/2" +/- width of polycarbonate sheet
*NOTE:
Final cut size for polycarbonate to be
provided by metal fabricator after
powder coating finish is applied
1/4" edge margin
S-2
Detail: Polycarbonate Retainer Upper (front)
City Of Edmonds
Building Department
Work : SIGNS
---------------------------- ------
Address: 118 5TH AVE N
-------------------------------------------------
----------------------------- - - --- -
Owner CITY OF EDMONDS MUSEUM
-----------
I -------------------------------------------
Approved Date' 11 /17/2020
Building Official
Permit Number BLD2020-1216
APPROVED
PLANS MUST BE
ON JOB SITE
City of Edmonds
Building Department
APPROVED Plans
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
margin
S-2
Detail: Polycarbonate Retainer Lower (rear)
Applicant shall repair/replace all ENGINEERING DIVISION RECEIVED
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING damage to utilities or frontage APPROVED AS NOTED Nov 06 2020
OWNER/CONTRACTOR IS RESPONSIBLE FOR ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY improvements in City right-of-way
EROSION CONTROL AND DRAINAGE UTILITIES MAY REQUIRE A SEPERATE PERMIT. per city standards that is caused or ee CITY OFEDMONDS
occurs during the permitted project. W4Axw,&e 11 /17/2020 DEVELOPMENT SERVICES
DEPARTMENT
Environmental 114 4thAve. N Edmonds Museum Clayton Moss Graphics9 9 & Si na a Edmonds, WA. Project: North Plaza Canopy FABRICATION DRAWING - FOR CONSTRUCTION Drawing Date : 2.15.20 Designer: cmoss@formaseattle.com 0 Sheet 2 of 3
98020
Direct: 206.920.5912
C/L -
C/L
t
t
P-1 Canopy Top * 38-1 /4"x96"
*NOTE:
Final cut size for polycarbonate to be
provided by metal fabricator after
powder coating finish is applied
V-1: Applied second surface (underside of P-1)
Image: 32" ht. centered on P-1
Maintain 3"margin at top & bottom
RECEIVED
Nov 06 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Environmental Ed 4th Ave. N Project: Edmonds Museum FABRICATION DRAWING - FOR PRODUCTION DrawingDate : 2.15.20 Designer: Clayton
oo s@f rm seattle.com Sheet 3 of 3
' Graphics & Signage Edmonds, WA. North Plaza Canopy 9
98020
Direct: 206.920.5912