This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost, the structure will be required to be rebuilt to the standards of new
construction.
Replacement cost of existing home $ 488,000
How was the value determined? NAHB standards & Insurance Replacement value
Component
Value of
Existing
Component
Percentage
removed
Replacement cost
of removed
component
Notes
Foundation
57,584
0%
0
Floor Framing
29,280
35%
10,248
Floor Insulation
9,760
35%
3,416
Wall Framing
19,520
10%
1,952
Wall insulation
8,296
10%
829.60
Siding
31,720
100%
31.720
Roof Framing
19,520
100%
19,520
_
Attic Insulation
8,296
100%
8,296
_
Windows
19,520
50%
9,760
Doors
17,568
80%
14,054
Plumbing
24,400
66%
16,104
Electrical
22,936
66%
15,137.76
HVAC
23,424
10%
2,342.40
Drywall
17,568
66%
11,594.88
Cabinets
22,448
80%
17,958.4
Painting, Flooring
and Finishes
34,648
66%
22,867,68
Deck
5,856
100%
5,856
Other
115,656
35%
43,895.60
Total
488,000
235,552.72
% of total
removed
Percentage of Removed eq Is'Total of Column 4 divided by Full Replacement cost' equals 48 %
Owner Date
Date
Contractor