Loading...
BLD2020-0985+75percent form+11.10.2020_5.58.07_PMPermit ## BLD2020-0985 Of ED,y O Y Q N RESUB Nov 12 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Address: 640 Dayton Street Home Owner: Soleta, Mark Contractor: Norco Electric C C Cfl h �"lrll(,`il 0 �i REVIEWED BY CITY OF EDMONDS € .....,. BUILDING DEPARTMENT.,... . This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. Replacement cost of existing home $ 488,000 How was the value determined? NAHB standards & Insurance Replacement value Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation 57,584 0% 0 Floor Framing 29,280 35% 10,248 Floor Insulation 9,760 35% 3,416 Wall Framing 19,520 10% 1,952 Wall insulation 8,296 10% 829.60 Siding 31,720 100% 31.720 Roof Framing 19,520 100% 19,520 _ Attic Insulation 8,296 100% 8,296 _ Windows 19,520 50% 9,760 Doors 17,568 80% 14,054 Plumbing 24,400 66% 16,104 Electrical 22,936 66% 15,137.76 HVAC 23,424 10% 2,342.40 Drywall 17,568 66% 11,594.88 Cabinets 22,448 80% 17,958.4 Painting, Flooring and Finishes 34,648 66% 22,867,68 Deck 5,856 100% 5,856 Other 115,656 35% 43,895.60 Total 488,000 235,552.72 % of total removed Percentage of Removed eq Is'Total of Column 4 divided by Full Replacement cost' equals 48 % Owner Date Date Contractor