Loading...
Building PermitPLUMBING PERMIT NUM City of Edmonds ' 980 1 1 1 www.edmondswa.gov Type: PLUMBING Owner/ Business: MIKE SATKO Status: ISSUED Subtype: COMMERCIAL PLUMBING Parcel No: 27033600102700 Site Address: 22815 EDMONDS WAY EDMONDS,WA 98020-5041 Applied: 4/8/2021 Subdivision: 005462, 005443, LLA 33-99-46 Lot: 0 Issued: 5/21/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 11/17/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: DISTINCTIVE DENTISTRY- PLUMBING FOR T/I WA State Contractor L & I #: LOCALPC063J9 City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT MIKE SATKO 1496, MAPLE VALLEY WA 98038 (425)432-6647 MIKESATKO@OUTLOOK.COM CONTACT LOCAL PLUMBING AND 1496, MAPLE VALLEY WA 98038 (425)432-6647 mikesatko@outlook.com CONCTRUCTION INC. CONTRACTOR NC AL PLUMBING &CONST 1496, MAPLE VALLEY WA 98038 (425)432-6647 mikesatko@outlook.com OWNER DERKSEN LLC* 19827 15TH AVE NW, SHORELINE WA 98177 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 5/21/21 R12471 PERMITS BACKFLOW - 2 INCH 001.000.322.10.000.00 $35.00 $35.00 5/21/21 R12471 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/21/21 R12471 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $150.00 $150.00 5/21/21 R12471 TRAP MEDICAL GAS PIPING 001.000.322.10.000.00 $110.00 $110.00 5/21/21 R12471 PLUMBING - PLAN REVIEW FEE 001.000.322.10.000.00 $165.00 $165.00 5/21/21 R12471 HOURS TOTALS: $550.00 $550.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Friday, May 21, 2021 6:00:08 PM 1 of 2 PLUMBING PERMIT NUM of Edmonds EdmondsCity 9801 1 1 www.edmondswa.gov/425.77 • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. SPECIAL INSPECTION REPORTS O Submit all special inspection reports to the City Building Official on a weekly basis. ORMATION COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR DATE X-0 PLUMBING FINAL** B-3 PLUMB ROUGH IN B-3 PLUMB GROUND WK B-5 BLDG SPECIAL INSPECTION Printed: Friday, May 21, 2021 6:00:08 PM 2 of 2