APPROVED PLN_BLD BLD2020-1232+SITE PLAN+10.22.2020_2.13.20_PM■ TENT PERMIT CONDITIONS
1;
! 1. Occupant load shall comply with state
1
1 regulations.
■
' 2. Doors and door hardware shall comply
! with IBC chapter 10.
W
1 3. Concrete ballast blocks shall be located
W
1
so as to safely distribute weight on
. existing deck structure, or other locations
1 as approved.
1 4. Tent structure is not to be occupied
. during heavy snow events.
1 5. Tent structure is not to be occupied
'
j during high wind events.
■ 6. This permit is temporary and tent
Li..
! structure must be removed no later than
'
1 60 days after permit is issued.
■ 7. Pre -occupancy inspections by Fire and-
! Building inspectors required.
1 8. Post -removal inspection by Building
■
' inspector is required.
! 9. Installation, use and maintenance of
�-
1 equipment and components shall be per
' manufacturer's specifications, installation
instructions, and applicable state codes.
Ib
! 10. Heating equipment must be approved
1 by Fire Marshal.
=r Z
nio�
(�D -0
0
o 2:
m
00
;7 m
c,Q
0-
0- 0 Z
CD 0 0
770
on (0 cCD
vow,
o �v
W
5�
nt Sgaure Footage: 1100sgft
r--—-—-—-—-—-—-—
----
MAINTAIN 48 INCHES CLEAR
! WALKWAY BETWEEN TENT
! AND EDGE OF DECK
— - — - — - — - — - — - — - — - — - — - J
it Width: 10' Wide Open Sides
ccupent Load Capacity: 73 people
ased on 15sgft per occupent
One 7001b weight
APPROVED BY PLANNING
Nov 13 2020
---------------------
TEMPORARY TENT ERECTED.
OVER WOOD DECK.
! TENT MUST BE REMOVED 60
DAYS AFTER ISSUANCE OF
I
PERMIT.
---------------------�
Date:10.22.2020
Project:Epulo Bistro Tent
PARTY RENTAL owner : CORT Party Rental
Designer:Felix Felipa
1 ---------
Page 1 of 4 !
1.3A�y�1yZIb��C3�
RECEIVED
Nov 10 2020
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT