Loading...
APPROVED Purser SP Lot 2- Drainage Memo 2020-06-09RAM Engineering RECEIVED 6/10/20 To: City of Edmonds Engineering Division From: Rob Long, PE RAM Engineering Subject: Purser Short Plat- Lot 2 Stormwater Memo RAM Job No. 19-014 Memorandum Date: June 9, 2020 COMPLIES WITH APPLICABLE C DE This memo provides a summary of the stormwater hard surface allocation for Lot 2 of the Purser Short Plat (PLN 20190040). A site -specific geotechnical evaluation recommends two stormwater BMPs for the site; Infiltration and BMP T5.13: Post -Construction Soil Quality and Depth. Project impervious/hard surface (roof, driveway, walk/patio areas) will be managed by a shared stormwater infiltration trench system with the short plat development. The infiltration trench system has been designed as part of the short plat development and thus includes hard surface areas allocated for each individual lot (see Purser Short Plat Stormwater Site Plan Report). Lot 2 has an allocation of 3,700 sf of impervious/hard surface, which include roof, driveway, patio and walkway areas. Below is a stormwater control summary table for Lot 2: Stormwater Control Summary: Project Site Category: Category 2 (part of the Purser Short Plat) Discharge Location: City's Municipal Separate Storm Sewer System (MS4) Type of Area Square Footage Stormwater Facility Lawn and Landscape 4,838 sf Soil Amendments (BMP T5.13) Roofs 2,835 sf Detention Vault Hard Surfaces 1,165 sf Detention Vault 25% Retrofit 0 SF None Purser Short Plat- Lot 2 Stormwater Memo RAM lob No. 19-014 Page 2 of 2 Purser Short Lot 2 Hard Surface Summary: Roof = 2,535 sf Driveway = 1,065 sf Sidewalk/Patio = 100 sf Total = 3,700 sf G �N WRSON LONDSA i' 'DRONVa WA r � v000"Zx THE PURSER SMART PLAT (PLNaa�so04o) 1 61W20 DREr-W rE CARLO$ 1427 7th RL S EDMOND$ WA 9W20 PARCEL NO, 0034000DD0720O W AL ,M AND unurr EASEMENT E!W PC9rNEFmr OF LDTS r & 2. RAM Engineering 165311311 Ave W, Suite A108 Lynnwood WA 98037 (425)678-6960 RAMengineeringinc.com