Loading...
BLD2019-0245RED U y OF E Moycn CITY OF EDMONDS 121 5TH A VENUE NORTH - EDMONDS, WA 98020 o PHONE: (425) 771-0220 - FAX: (425) 771-0221 nc. I89 STATUS: ISSUED 09/17/2019 Permit #: BLD20190245BUILDING PERMIT Expiration Date: 09/17/2020 _ Project Address_ 8500 186TH ST SW, EDMONDS, Parcel No: 00567800001400 P&OV1Vx'TYOWNj7AAPPLICANT CONTRACTOR VICTORIA STOCKER DOUGLASNUTTYCAD-ALMOND EVERGREEN CONTRACTING 8500 186TH ST SW 6300 139TH AVE SE C/O ZENGXUN AN EDMONDS, WA 98026-5733 SNOHOMISH, WA 98290 2531 BROADWAY SUITE A EVERETT, WA 98201 (425)327-7686 (206)225-0068 (425)773-4559 LICENSE #: EVERGC'954BQ EXP:01/31/2021 1I DESCRIPTION CONVERT EXISTING BASEMENT STORAGE ROOM INTO 2 FINMSHED BEDROOMS. ADD A SHOWER TO THE EXISTING BASEMENT POWDER ROOM. PLUMBING AND MECHANICAL INCLUDED. VALUATION: $15,000 PERMIT TYPE: Residential PERMIT GROUP: 04 - Alteration/Remodel GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: OCCUPANT GROUP: OCCUPANT LOAD: FENCE: 0 X 0 FT. CODE: OTHER: ------- OTHER DESC: ONE: NUMBER OF STORIES: 0 VESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 BASEMENT: 0 1ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 BEDROOMS:0 BATHROOMS:O BEDROOMS:0 BATHROOMS:0 '1 1 REARSEFBACK REQUIRED: PROPOSED: REQUIRED: PROPOSED: REQUIRED: PROPOSED: HEIGHT ALLOWED:O PROPOSED:O REQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMENS COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS T A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HERD AND ALL FEES ARE PAID. '1460X't'r hVl <,, 49 l7 Signature Print Name /Date / Released By N U Date ATTENTION IT IS UNLAWFUL TU USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC 109/ 1BC310/ 1RC110. = FIRE = APPLICANT = ASSESSOR X CITY 1.�51 iYX� STATUS: ISSUED BLD20190245 CONDITIONS • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: Services are now scheduled online. If you FIRE (425) 775-7720 3. Then: Permits/Development have difficulties, please call the 4. Then: Online Permit Info Building Department front desk for PUBLIC WORKS (425) 771-0235 5: If you don't have one already, create a assistance during office hours. login (upper right hand corner) (425) 771-0220 RECYCLING (425) 275-4801 6: Schedule your inspection When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. • B-Preconstruction meeting • B-Plumb Ground Work • B-Plumb Rough In • B-Mechanical Rough In • B-Framing • B-Insulation/Energy • B-Building Final • B-Other BUILDING PERMIT Only APPLICATION Permit#: L3LD Development Services Building Division 121 5th Ave N / Edmonds, WA 98020 425.771.0220 For handouts, submittal requirements, permit status and inspection scheduling information go to: http://www.edmondswa.gov/ JOB SITE INFORMATION/LOCATION: (Where the work is taking place) -45 Job Site Address: 8ECoC-_, - I &4Z 7. S. ta- 9 8D2(o Parcel: 006(v-1800001q OO SEAJtL V-Z1 -Fog-r='6T Lot /Unit/Suite #: LOT 1 Subdivision: T12-k-7S )bhl . Ai PROPERTY OWNER: Name: QIC-To9-tA ' iEF Mailing Address: 65b0- 18(�TM 5i gr3_T 5 • L'o. City/State/Zip: F_DMC>tJ pS, W A • `i8o2lo -'5-T 3'� Phone #: (`i 2S> �2'l 1(0 el U, Email: -I n @ � 06A-1 C,,- - OWNER INSTALLATION: *If yes, read and sign* Will work be performed by the property owner? ❑ yes K No I own, reside in, or will reside in the completed structure. This installation is being made on property that I own which is not intended for sale, lease, rent, or exchange according to RCW 18.27.090. Owner Signature: APPLICANT / CONTACT INFORMATION: I Name of Applicant: 'bou t-LA S A LMuntfD — iA Ljj" CA4 b Mailing Address: (AOD- 13' =' AJQIuE S•E. City/State/Zip: SnIL*>NoMISI-(a WA. cIS2f-10 Phone#: (Zo�� 225Ocx.& E-mail: �•al,nnortcl r\u ('tKcc�. Coy✓j GENERAL CONTRACTOR: (If different fromapplicant) General Contractor: �JEM Ci2c�.l a47-P-A n4bL Mailing Address: 2.5151 6P-0,40&0A-{ *A City/State/Zip: ];J c (LGT , W)A . i82o Phone #: (q 25) 31.1- o5-I-7 E-mail: ,novA @ MSrI. ConA WA STATE CONTRACTOR L & I # (CCB) & EXPIRATION DATE: *96� Q4 �01 131 12o2f )Q4 col 131 I2o21 ) CITY OF EDMONDS BUSINESS LICENSE #: TYPE OF PERMIT (Provide ❑ Accessory Structure/ Detached Garage Details ❑ Addition ❑ Demolition ❑ Mechanical ❑ New Single Family / Duplex ❑ Plumbing ❑ Fire Sprinkler E Remodel ❑ New Commercial/ Mixed Use ❑ Re -Roof ❑ Signs ❑ Tank ❑ Tenant Improvement ❑ Other Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead; and the profit for the work indicated on this application. Valuation: PROPOSED NEW SQUARE•• •• THIS APPLICATION Basement sq ft: Finished ❑ Unfinished ❑ 1st Floor, sq ft: 2nd Floor, sq ft: Garage/Carport:, sq ft: Deck/Covered Porch/Patio: Other sq ft: PROJECT• 6an1'1E2-T Ex (ST( Nit--, 61,51EMtPXr STD RA I-E 000M IntTO C2�FI,�ISH 6=400Ms kto a SNDh)E -M 7)4E tK(s-nrIG 13ASEMerLT Po W DI✓2 12o0M I certify that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: 60L'LA 5 Mon►-/J Signature: ()]Date 03 • o-7- 1 `1 NO COMMERCIALGENERAL Occupancy Group(s): Occupant Load(s): Type(s) of Construction: Fire Sprinklers: Yes ❑ No ❑ WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSEC forms. DEFERRED SUBMITTALS: All commercial building permitsthatwill require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet EQUIPMENTMECHANICAL • BTUs Gas / Elec / Other Qty A/C Unit /Compressor Air Handler /VAV Boiler Dryer Duct Exhaust Fans I 1 Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provide eleva- tions if a Commercial Bldg) [Oter: COUNTS 7 PLUMBING FIXTURE ..r re-piped Qty Qty Clothes Washer Tub/ Showers 0 Dishwasher Backflow Device (RPBA, DCDA, AVB) Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Bibs Water Heater - Tankless? Y or N Hydronic Heat Water Service Line Sinks Other: Toilets(w Other: CONNECTION COUNTS.. .. . BTUs Qty BTUs Qty A/C Unit Outdoor BBQ / Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert Other: Furnace Other: GAS, COUNTSMEDICAL AIR VACUUM or re -piped) Qty Qty Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical -Surgical Vacuum Other: DEMOLITION Type of structure to be demolished: Square footage of structure to be demolished: AHERA Survey done? Y / N PSCAA Case #: Critical Areas Determination: Study Required ❑ Conditional Waiver ❑ Waiver ❑ Fill in Place ❑ Fill Material: Removal ❑ Size of Tank (Gallons) Critical Areas Determination: Study Required ❑ Conditional Waiver ❑ Waiver ❑ .D Grading: Cut cubic yards Fill cubic yards Cut / Fill in Critical Area: Yes ❑ No ❑ GENERALPROVISIONS APPLICATIONS: Applications are valid for a maximum of 1 year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed with Washington State Department of Labor & Industries and have a current City of Edmonds Business License. GEA ERAL N OTES LINE SAN'ET Y NOTES (continued FRAMING NOTES (continued Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming, or unpermitted building, structure, or site condition which is outside the scope of the permit application, regardless of whether such building, structure, or condition is shown on the site plan or drawing. Such building, structure, or condition may be the subject of a separate enforcement action. Sound/noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits only during the hours of 7:OOam to 6:OOpm on weekdays and 10:00am and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits, unless a variance has been granted. ECC Chapter 5.30 All changes in plans and field modifications shall be approved by the local jurisdiction. The design professional shall prepare drawings as required for approval. IBC 107.4 Temporary address shall be clearly visible from street during all phases of construction. Failure to properly post house/building numbers may result in no inspection by the City Inspector. Curb signage is not acceptable. Address numbers (4" min. ht. & 1/z" min. stroke width) shall be posted to be plainly visible from the street or road fronting the property. IRC R319 LIFE SAFETY NOTES Smoke alarms shall be installed in each sleeping room, outside of each separate sleeping area in the immediate vicinity of the bedrooms, and on each level (including basements and habitable attics) in new construction and in existing dwellings when alterations, repairs or additions requiring a permit occur. Smoke alarms shall be hard -wired with battery backup, and when more than one smoke alarm is required within an individual dwelling unit, they shall be interconnected. Discuss exceptions to the power source requirements with the Building Inspector. IRC R314 IBC 907.2.11.2 Carbon monoxide alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level in new construction and in existing dwellings when alterations, repairs or additions requiring a permit occur, or when one or more sleeping rooms are added or created. IRC R315 Handrails and guards must be capable of resisting a concentrated load of 200 pounds per square foot applied in any direction at any point along the top. Guard in -fill components must be capable of resisting 50 pounds per square foot. IRC Table R301.5 IBC 1607.8 Handrails shall be continuous through stair flights of four or more risers, without interruption by newel posts (unless at a turn) or other obstructions, and return to a wall, newel post, or safety terminal. The grip -size shall be Type I or II or of equivalent graspablity. IRC 311.7.8 ide one operable escape window in the basement, habitable and in each sleeping room meeting all of the following requirements: -An operable area of not less than 5.7 sq. ft. (5 sq. ft. for grade floor opening) •A minimum clear opening height of 24 inches •A minimum clear opening width of 20 inches -Not more than 44 inches between the finished floor and the bottom of the clear opening. Escape windows located under decks or porches must have a path 36 inches in height to a yard or court. R310 IBC 1029 The greatest riser height within any flight of stairs or the greatest tread depth within any flight of stairs shall not exceed the smallest by more than 3/8 inch. IRC R311.7.5.1 IRC R311.7.5.2 IBC 1009.7.4 FOOTINGS/FOUNDATIONS Footing drains are required around concrete/masonry foundations that retain earth and enclose habitable or usable spaces located below grade, or for crawl spaces when a minimum 6 inch slope within the first 10 feet of the foundation wall is not achieved. A separate footing drain inspection by the Building Inspector is required. IRC R401.3 IRC R405.1 Slab -on -grade floors shall be a minimum 3.5-inch thick concrete over a 6 mil vapor barrier and 4-inch base of sand/gravel/etc. There shall be a thermal -break for slabs inside a foundation wall, and if the slab is less than 24" below the exterior grade, 24" wide R-10 perimeter insulation must be provided. Slabs used as part of a hydronic heating system shall have R-10 insulation provided throughout the entire slab area. IRC R506 WSEC R402.2.9 WSEC Table R402.1.1 Vertical rebar must be hooked and tied in place at time of footing inspection. Maintain minimum 3" clearance to earth, 1-1/2" to form -work for reinforcement. R403.1.3 R404.1.2.3.7.4 Anchor bolts shall be at least 1/2 -inch in diameter and extend 7 inches into concrete. There shall be a minimum of two bolts per plate, with one bolt within 12 inches but not closer than seven bolt diameters from the end of the plate. The bolt spacing shall not exceed 6 feet o.c. and shall have a nut and 3"x3"x0.229" washers unless engineered. IRC R403.1.6 FRAMING NOTES Hardware and fasteners in contact with preservative -treated wood shall be of hot -dipped zinc galvanized steel, stainless steel, silicon bronze or copper. IRC R317.3.1 IBC 2304.9.5.1 Joists less than 18" and beams less than 12" to grade and all wood exposed to weather shall be preservative -treated or naturally resistant to decay. IRC R317 IBC 2304.11 Joists shall have not less than 1.5 inches bearing on wood or metal and 3 inches on concrete. Joists shall be prevented from rotating at the ends and at intermediate support by approved hangers, 2 :h nominal blocking, or attachment to a rim board. C 502.6/502.7 IBC 2308.8 Foundation cripple walls shall be framed of studs not less in size than the studs above. Walls over 4 feet in height shall be framed of studs having the size required for an additional story. Cripple walls studs less than 14 inches in height shall be sheathed on at least one side with a wood structural panel that is fastened to both the top and bottom plates in accordance with Table R602.3 (1), or cripple walls shall be constructed of solid blocking. Cripple walls shall be supported on continuous foundations. IRC R602.9 Prior to the framing inspection, the building must be dried in with a minimum of roofing, windows, and siding paper installed. Truss layouts showing girder truss/hip-master locations are not permitted to change and must be followed correctly. If the truss manufacturer requests to change, in part or in whole, the layout shown, they must contact the architect/designer to ensure that the structural design of the building is maintained. If the layout shown is changed, in part or in whole, the Building Division requires new engineering calculations and must approve the changes prior to the installation of the roof sheathing. Exterior and bearing wall studs may be notched <25% and bored <40% of the stud width. Non -bearing wall studs may be notched <40% and bored <60% of the stud width. Any bore located <5/8" from the stud face is considered a notch. Rafters and joists may be notched in the outer thirds of the span with a maximum notch depth 1/6th and a notch width 1/3rd the depth of the member. Rafters and joists may be bored up to 1/3rd the depth of the member no closer than 2" to each edge or to another bore. Top plates notched or bored >50% of the width must have a 16ga. strap, 6 inches past and fastened with 8-1Od nails at each side of the opening. IRC R502.8 IRC R602.6 IBC 2308 Attic access openings are required for buildings with combustible ceiling or roof construction over an area >30 sq. ft. and with a 30" vertical space between ceiling and roof framing members. The rough -framed opening shall be 22"x30" and located in a hallway or other readily accessible location. The access cover shall be weather-stripped and insulated to a level equal to the surrounding surfaces. IRC R807.1 WSEC 402.2.4 Attic ventilation openings shall not be less than 1/150 of the area of the space ventilated. It may be reduced to 1/300 if at least 50 percent and not more than 80 percent of the required openings are at least 3 feet above the eave vents with the balance provided by the eave vents. The net free cross -ventilation area may also be reduced to 1/300 when a Class I or II vapor barrier is installed on the warn -in -winter side of the ceiling. IRC R806.2 ADDITIONAL REQUIREMENTS A survey may be required prior to the foundation wall inspection if the Building Inspector is unable to verify setbacks. Lot line stakes should be in place at the time of the foundation inspection and established property pins should be made visible. o oN Z 00 N E.� �4 of ED& CN MECHANICAL N MEN PLUMBINU NMEN HKL-KAl D LUN J'l KU U l 1UN Provide outdoor air inlets in all habitable spaces.IRC 1507.3.4.4 A 30"x30" level working space shall be provided in front of the control side to service appliances. In attics and underfloor areas, a passageway a minimum of 30 inches high and 20 inches wide traveling not more than 20 feet from the access shall be provided. A 24 inch wide solid pathway shall be provided in attics. A switch -controlled luminaire is required at the passageway opening and a receptacle outlet at or near the appliance. A means of electrical disconnect is required within sight of the appliance or the breaker is to be capable of being locked in the open position. IRC M1305 IMC 306 NEC 422.31(B) Provide the combustion air required for the proper operation of the appliance(s). The minimum required volume per the standard method is 50 cubic feet per 1000 BTU/hr. Where exhaust fans, clothes dryers, and kitchen ventilation systems interfere with the operation of appliances, makeup air shall be provided. Fuel -fired appliances shall not be located in sleeping rooms, bathrooms, toilet rooms, or storage closets unless specific installation requirements are met. IRC G 2406.2 G2407.4 G2407.5.1 IFGC 303.3 304.4 304.5 An exhaust hood/system of >400cfm installed or required by the range or cooktop manufacturer must be provided with makeup air equal to the exhaust air rate. IRC M1503.4 IMC 505.2 Provide required makeup air in the laundry room. Louvered doors or openings/grilles into other spaces may be used to meet the requirements. Other limitations may arise if a gas dryer is installed. IMC 504.5 G2407.4 G2407.9.1 Dryer ducts shall terminate outside of the building, 3 ft. from any openings into the building. The termination shall have a backdraft damper and no screen. The dryer duct shall be a minimum .016-in. (27 ga.) thick, a minimum 4 inches in diameter, have a smooth interior finish, have sections joined with the insert end in the direction of airflow without the use of fasteners, be supported at 4 ft. intervals, and secured in place and protected by nail plates that extend 2" above/below bottom/top plates. The joints shall be sealed with UL181A listed mastic or tape. Dryer- duct maximum lengths are 25 ft. for electric and 35 ft. for gas with deductions for fittings (or sized/length per manufacturer). If concealed, the equivalent length of the duct shall be permanently labeled or tagged within 6 ft. of the dryer connection. IRC M1502 M1601.4.1 G2439 IMC 504 IFGC 614 Hydronic heating system piping shall be tested at 100 psi water pressure or 1 1/2 times the operating pressure, whichever is greater, for a minimum of 15 minutes. Piping embedded in concrete shall be pressure tested prior to the placing of concrete and be maintained at operating pressure during concrete placement. The test must be observed by the Building Inspector prior to concrete placement. Note: a means of providing outdoor air per IRC R303.4, M1507 and IMC 403.2 is required. IMC 1208 - i209 Refrigerant circuit access ports located outdoors shall be fitted with locking -type tamper- resistant caps. IRC M1411.6 IMC 1101.10 (tures installed on a floor level that is lower than the next stream manhole cover of the public or private sewer shall be )tected from backflow of sewage by installing an approved type backwater valve. Fixtures on floor levels above such elevation Ishall not discharge through the backwater valve. UPC 710.1 Vent all plumbing fixtures through the roof per UPC 906.0 or with a loop vent per UPC 909.0. Air admittance valves are not permitted unless first approved by the Building Inspector on a case by case basis. Water heaters installed in attics, attic -ceiling assemblies, floor -ceiling assemblies or a floor/sub-floor assembly, where damage may occur from a leak, shall be installed in a watertight pan made of corrosion -resistant materials. The pan shall have a minimum 3/a" drain and the drain shall terminate in a visible location. The drain cannot empty into the crawlspace beneath a building. Discharge from a relief valve into a water heater pan shall be prohibited. UPC 507.4 UPC 507.5 Access will be required for the whirlpool/jetted tub pump and the tempering valve for all tubs. The tempering valve may also be installed at the water heater. UPC 409 Showers shall be a minimum of 900 square inches and be capable of encompassing a 30 inch circle. The shower receptor shall have a finished darn, curb, or threshold between 2" and 9" above the top of the drain. The floor of the shower shall slope a minimum of 1/a" and a maximum of 1/z". Lining materials for built-up showers and shower seats shall be sloped, extend upward 3" above the horizontal surface, and over the top of the dam or threshold. Shower receptors shall be tested by filling with water to the top of the rough threshold while plugged at the drain. Protect the weep holes in the sub -drain clamping ring from clogging. UPC 408.5 - 408.7 Main building shut-off required on water supply line. UPC 606.2 Pressure reduction valve on main water supply line required by City code. Vent hot water tank relief valve directly to the outside. UPC 608.5 Hot water heater must be seismically anchored or strapped at points within the upper one-third and lower one-third of its vertical dimensions. At the lower point, a minimum distance of 4" must be maintained above the controls with the strapping. UPC 507.2 All pressure absorbing devices (e.g. air chambers, mechanical devices, hammer arrestors) shall be accessible or installed per manufacturer. UPC 609.10 (Minimum 1" air -gap required at dishwasher. UPC 414.3 I Hose bibs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. UPC 603.5.7 Soaker and jetted tubs shall be installed and supported per the manufacturer's installation specifications. UPC 409.6 Dwelling/garage separation shall be maintained by installing 1/z" gypsum wallboard on the garage side from the foundation to the underside of the roof sheathing. Ceiling of garages with habitable space above shall have 5/8-inch Type X gypsum wallboard attached with 1-7/8 inch 6d coated nails or equivalent drywall screws and the structural elements supporting the ceiling protected with 1/2 gypsum wallboard. Enclosed accessible space under stairs shall have walls, under -stair surface and any soffits protected on the enclosed side with 1/z" gypsum wallboard. Water resistant gypsum shall not be used as a tile backing board where there will be direct exposure to water, or in areas subject to continuous high humidity (showers, etc.). IRC R302 IRC R702.3.8.1 Fireblocking shall be provided to cut off all concealed draft openings (both vertical and horizontal) and to form an effective fire barrier between stories, and between a top story and the roof space. Fireblocking shall be provided in wood -frame construction in the following locations: 1) In concealed spaces of stud walls and partitions, including furred spaces and parallel rows of studs or staggered studs as follows: 1.1 Vertically at the ceiling and floor levels. 1.2 Horizontally at intervals not exceeding 10 feet. 2) At all interconnections between concealed vertical and horizontal spaces such as occur at soffits, drop ceilings and cove ceilings. 3) In concealed spaces between stair stringers at top and bottom of the run. 4) At openings around vent, pipes, and ducts at ceiling and floor level, with an approved material to resist the free passage of flame and products of combustion. For additional requirements see IRC 302.11 Draftstops shall be installed in combustible construction where there is usable space both above and below the concealed space of a floor/ceiling assembly, so that the area of the concealed space does not exceed 1000 sq. ft. and shall divide the space into approximately equal areas. Where the assembly is enclosed by a floor membrane above and a ceiling membrane below, draftstopping shall be provided in floor/ceiling assemblies under the following circumstances: 1.Ceiling is suspended under the floor framing. 2.Floor framing is constructed of truss -type open -web or perforated members. Draftstopping materials shall not be less than 1/2 inch gypsum board, 3/8 inch wood structural panels or other approved materials adequately supported and installed parallel to the floor framing rnembersIRC R302.12 ADDITIONAL REQUIREMENTS Height verification shall be done by the applicant's agent/contractor and observed by the Building Inspector on site. The agent/contractor shall set up the equipment (transit/builders level), establish the datum point, and the point of average grade. These items must be consistent with the approved plans. If the proposed height of a building (as shown on the plans) is within 12 inches of the maximum height permitted for the zone, an elevation survey is required. An elevation survey consists of three components to be conducted by a licensed surveyor. 1) Prior to construction, the surveyor shall establish average grade as specified in ECDC 21.40.030, and shall establish a reference datum point that will be and can be freely accessed. 2) The surveyor shall locate the ation of the first floor prior to the City under -floor inspection. 3) A t letter of height confirmation shall be provided upon completion of the structure. CN 2 IF THIS PLAN IS NOT ON 18x24 PAPER, IT HAS BEEN SCALED ACCORDINGLY Partial Basement As -Build SCALE: 1/4'=1'-0" 15'-3" 2'-3Y" ° REP LACE EXISTING TOILET EXISTING MECHANICAL R E S() TAIRS 4'- - 1'-10' (FIELD VERIFY PR 3° BE t � 3° BF / �y \Si_'. 20' SHELVES BEDROOM-5 3 0 z w r HOWE 2'6° PKF 2° BE -� RELOCATE EXISTING DOOR FAMILY w (M b"3" IDBL CAS 4'-0' 10'-10° Proposed Basement Alterations SCALE:1/4"=1'-.0" APPROVED PLANS MU&V,.4gN ON JOB S� ii �r Plan Legend: o-_o Existing 2x wall framing to be removed o Existing 2x wall framing to remain o New 2x wall framing Q 110v Smoke Alarm with Battery Backup Q 110v Carbon Monoxide Alarm with Battery Backup Ceiling Ventilation Fan —F Fuel Gas shutoff (Flame Safeguard) 0 Window Type, Reference Schedules Plan ® Door Type, Reference Schedules Plan TSG Tempered Safety Glass (Z) Structural hardware per Hardware Schedule ® Shearwall per schedule CITY OF EDMONDS BUILDING DE ARTMENT WORK '"�mp� ADDRESS _. -S OWNER #_:�r_- APPROVED DATE: l9 BLDG.OFFICIAL: - -` PERMIT imuiUd.u-Ii Assi..—o2yPL . N NORTH Code References: Section R314 Smoke Alarms: R330.1 Genera[: Smoke alarms shall mmplywkh NFPA 72 and Secd.n R314 R3M.1.1 Lists ess Smokealarm h IIInfrW1n....M,,mwkh UL2317.Cambinationsmokeandcarbonmonoxide alarms shall be listed In accordance with UL 217 and 1.1.2034. R32C211firerereaulred: Smoke alarms shall be provided in accordance with this mdion. IUM2.1 New compmethm Smoke alarms shall be provided In dwelling units. R314.2 2 Ntemtians reoalro and additions: Where,l mtfons, reppin rsddilionsrequilms a permit occur, or where one or more sleeping rooms re added or created in existing dwellings, the individual dwelling unit shall be equipped with smoke alarms located as required for new dwellings. Exceptions: 1. Work Involving the exterior surfaces or dwelfings, such as the oplacementof roofing or sldin& the addition or replacement of windows or doors, or the addition of a porch w deck, are exempt from the requirements of this section. 2. Installation, alteration pr repairs of plumbing or mechanical systems are ecempt from the requirements of this section. ML4.3 Lerathm; Smoke alarms shall be installed in the following locations: 1. In each sleeping room. 2. outside each separate sleeping..¢. In the Immediate vicinity of the bedrooms. 3. On each additional story of the dwelling Including basements and habitable attics and not Including crawl spaces antl uninhabitable attics. In dwellings a dwelling unitswith spilt levels and 'thou[ an intervening door between the adjacent levels, a smoke alarm Installed on he upper level shall suffice for the adjacent lower level provided that the lower level is less than one Full story below the upper level. 4. Smoke alarms shall be Installed not less than 3 feet (914mm) horhontally from the doctor opening of a bathroom that —Ins, bathtubor shower unless this would prevent placement ofa smoke alarm required by Section R314.3. R814.3 hods, tat m near000klne pliances• Smokealarms shall not b t Installed lot he following locations unless this would prevent placement ofa smoke alarm Ina location mquired by Section R314.3. 1. Ionization smoke alarms shall not be Installed less than 20 feet (6096mm) horizontally from a permanently Installed cooking opplionce. 2. loniration smoke alarms with an alarm -silencing switch shall not be installed less than 10 feet (3048mm) horizontally from a permanently Installed cooking opplimce. 3, photoelectric smoke alarms shall not be Installed less than 6 feet (1828mm) horizontally from a permanently Installed cooking oppliance. R314A Intenam—ton: Where more than one smoke alarm is regmred to be installed within an Individual dwelling unit In accordance with Sedion R314.3, the alarm devices shall be InmrmnneRed In such a manner thatthe ctuation of one alarm will activate all of the alarms in the individual dwellfno unit. Phvslral InterconnMion of smoke alarms shall not be required where listed wireless alarms are installed and all alarms sound upon activation of one alarm. Esorption: Interconnection of smoke alarms in existing areas shall not be required where olterotions or repairs do not result in removal of Interiorw.It mailing finishes exposing the semcture, unless there is n attic, crawl space or basement... liable that could provide access for Intereonnectipn without the removal of marl,, finishes. R314.5 combine "" alarms• Combination smoke and carbon monoxide alarms shall be permitted to be used in Ile, of smoke alarms. R314.6 Power Smoke alarms shall receive their primary power from the building wiring where such wiring Is served from a commercial source and, where primary power is Interrupted, shall receive power from a battery. Wiring shall be permanent and without a disconnecting switch other than those required for wrrent protection. Exceptions: 1. Smoke alarms shall be permitted W be battery operated where installed in buildings without I wva. comm¢Z Smoke alarms installed in accordance with Sedion R314.2.2 shall be permitted to be banery Powered. R324.7 nre at.- °.stems: Fire alarm systems shall be permitted to be used In lieu of smoke alarms and shall comply with Sections R314.7.1 through R314.7.4. R314.7.SGeneral • Fire alarm simems shall comply with the provisions of this code and the household fire warning equipment provisions of NFPA 72. Smoke detectors shall be listed in accordance with UL 269. R314.7.2 Location: Smoke detectors shall be installed in the Iocatlons specified In Sedion R314.3. R314.7.3 permanent Rd — Where a household fire alarm system is Installed, it shall become a permanent fixture of the occupanry, owned by the homeowner. R314.7.4 comblimlon detectors: combination smoke and carbon monoxide detectors shall be permitted to be Installed In fire alarm systems In l'euof smoke detedprs, provided that they are listed in accordance with UL 268 and UL 2a75. Basement Conversion Plans TABLE M1507A MINIMUM REQUIRED LOCAL EKHAUSTRATES FOR - ONE -AND TWO-FAMILY DWELLINGS AREA TO BE EXHAUSTED EXHAUST RATES Kitchens 100 cfmintermittent or 25 cfm cont] nuous D. Almond p m Bathroos-Toilet Rooms Mechanicalexhaustcapacltyof50cfm 02/01/2019 intermithentor 20 cfm continuous For Sl:lc blcfootperminute=0Ao04719m%s. 19-004-01r Hon'Redeiana ALL WORK SUBJECT TO FIELD INSPECTION FORCM cop 6 CODE COMPLIAPICE O - o - nNS EXAMINER APPROVAL: F2ECEi\fE® 9heel MAR 0 7 2019 BUILDING A 1.0 oe —