Loading...
Building Permit'S IDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2020-07613 wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: ELAINE MATTSON Status: ISSUED Subtype: ADDITION Parcel No: 00513100014604 Site Address: 6820 174TH ST SW EDMONDS,WA 98026-5226 Applied: 7/27/2020 Subdivision: 005131 Lot: 0 Issued: 3/1/2021 Fire Sprinklers: Lot Area: 11618 Zoning: RS-12 Final: Valuation: $74,215.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 2/24/2022 Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 1 Issued by: NED Scope of Work: RICHARD- NEW GARAGE, ADDITION AND REMODELP&M INCL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ELAINE MATTSON PO BOX 234, EDMONDS WA (425)828-8811 ELAINE.MATTSON@COMCAST.NET 98020 CONTACT ELAINE MATTSON AND PO BOX 234, EDMONDS WA (425)828-8811 elaine.mattson@comcast.net ASSOCIATES 98020 CONTRACTOR ELAINE MATTSON PO BOX 234, EDMONDS WA (425)828-8811 elaine.mattson@comcast.net &ASSOCIATES 98020 6820 174TH ST SW, EDMONDS OWNER CHERYL A RICHARD WA 98026 •' • DESCRIPTION 71BFASEFEE ACCOUNT AMOUNT PAID PAID DATE RECEIPT # FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 2/27/21 R10774 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 2/27/21 R10774 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 2/27/21 R10774 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 2/27/21 R10774 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $75.00 $75.00 2/27/21 R10774 TRAP EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $30.00 $30.00 2/27/21 R10774 SYTEM ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $220.00 $220.00 2/27/21 R10774 FURNACE OR FIREPLACE 001.000.322.10.000.00 $30.00 $30.00 2/27/21 R10774 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 2/27/21 R10774 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $925.00 $925.00 2/27/21 R10774 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $786.25 $786.25 7/28/20 R6665 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 2/27/21 R10774 WATER HEATER - TANKLESS 001.000.322.10.000.00 $15.00 $15.00 2/27/21 R10774 TOTALS: $2,272.75 $2,272.75 Printed: Monday, March 01, 2021 8:05:08 AM 1 of 3 MIDENTIAL BLDG PermitCity • • • • PERMITNUM 9:0i 1 1 1 www.edmondswa.gov CONDITIONS NOTES 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS FOR arising directly or indirectly from the issuance for this permit. Issuance of this permit shall INFORMATION not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision.\r\r Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. • •NS - Schedule •at:.https://Inspection.MyBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 EXTERIOR INSULATION B-3 GAS PIPING TEST Printed: Monday, March 01, 2021 8:05:08 AM 2 of 3 City of Edmonds PERMIT NUM Permit 7121 98020BLD2020-07613 Aveli: www.edmondswa.Sov wm B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" E-9 COMPOST AMEND X-2 ENGINEERING FINAL A-1 TESC AND MOBILIZE Printed: Monday, March 01, 2021 8:05:08 AM 3 of 3