APPLICANT RESPONSE TO ENGD. Palmaffy Design 1,,,, 47th DrSE F%crcit. WA (4`,) 338-7880
20. There is no need for a detail, the archway is a build-up and the beam above is in
the joist bay, thus the "flush top".
21.Again, this item has been covered in correction item #9.
22. Please see the engineer's square stamp on the appropriate pages.
Engineering Division
JoAnne Zulauf,
Re: 7926 203rd St SW
JoAnne,
The following is in response to your correction items under a previous project number
with the same address:
1. Please see redrawn site plan. This site plan has all of the same information as
the previous version, just hopefully easier to read. The difference of the height
calculation versus the surveyor's letter is because of the addition of the attached
garage to the plan changes the base height.
If you have any other questions feel free to call me at 425-345-2530.
Dante