APPLICANT RESPONSE TO BLDD. Palmaff
Building Division
City of Edmonds
Donovan Akau
Re: 7926 203rd St SW
Donovan,
De S 1 n ] 2925 47th Dr SE Everett, WA (425) 338-7880
Mar. 5, 2020
The following is in response to your correction items under a previous project number
with the same address:
1. This building is 4976sf which means it still falls under the category of 3.5 credits.
2. This detail has been added to the plans and is located on sheet B-1.
3. The whole house fan is located in the basement laundry room. It is to run
continuously upon occupancy and this note has been added to the plans.
4. As you can see this letter is provided.
5. This note has been corrected.
6. The black square refer to point loads from above and sometimes they can be
handled with 2 studs, other times they need to be larger members. The larger
members call outs have been added to the plans. If they are not called out then
they are enough studs to match the width of the member creating the point load.
7. The fresh air for the ventilation system is coming through the furnace thus the
exterior venting connection shown on the (basement) plan.
8. Since this is the location of the whole house fan this requirement is not
necessary.
9. Please see the ventilation fan sizing on sheet A-5.
10.This note has been corrected.
11.There are no non -industry standard abbreviations used on this sheet or plans,
please specify.
12. The sheer walls have already been installed and covered with siding. They have
also been inspected or the siding would not have been allowed to be installed.
13.These are callouts from the engineer and his required schedule. P1-4 is not
being used as a call -out and has been eliminated. Please see the shear wall
schedule on sheet
14. This has been covered in correction item #6.
15. This has been covered in correction item #9.
16. This has been corrected in item #12 & #13.
17. The carbon monoxide detectors have been added to the plans.
18.This has been covered in correction item #13.
19. SD 110V is the proper call -out.