Loading...
Building Permit 2020ERCIAL ■ LDG Permit PERMIT NUM City of Edmonds -. •. Type: COMMERCIAL BLDG Owner/ Business: JUD IRISH Status: ISSUED Subtype: COM ALTERATION OR REPAIR Parcel No: 00434208800000 Site Address: 700 MAIN ST EDMONDS,WA 98020-3032 Applied: 8/12/2020 Subdivision: 004342 Lot: 0 Issued: 8/14/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $29,950.00 Occupancy Type: Construction Type: Expiration Date: 8/14/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: CHIMNEY ON FRANCES ANDERSON CENTER- otc per B.O. WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JUD IRISH PO BOX 1392, SUMNER WA (253)261-4193 JUD@CHIMSPEC.COM 98390 CONTACT CHIMNEY SPECIALISTS INC, PO BOX 1392, SUMNER WA (253)261-4193 jud@chimspec.com THE 98390 CONTRACTOR CHIMNEY SPECIALISTS INC, PO BOX 1392, SUMNER WA (253)862-1522 jud@chimspec.com THE 98390 OWNER EDMONDS CITY OF 250 5TH AVE N, EDMONDS WA 98020-3146 •' M • DESCRIPTION 7CITY.T.E.C.HNOLOGY ACCOUNT AMOUNT PAID PAID DATE RECEIPT # FEE CHARGED001.000.321.99.100.00 $40.00 $40.00 8/14/20 R7024 PER IT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 8/14/20 R7024 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $640.00 $640.00 8/14/20 R7024 TOTALS: $705.00 $705.00 17 CONDITION TYPE STATUS NOTES ?!!!!! Printed: Friday, August 14, 2020 8:59:51 AM 1 of 2 ■ LDG Permit of • • • PERMITNUM City ir 121 5th Ave N, Edmonds WA •:i66 1 1 1: • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Structural repair is not included in the scope for this permit. If it is found that structural STRUCTURAL REPAIR NOT FOR repairs are needed a separate permit must be submitted to the city for approval, and INCLUDED INFORMATION plans must be stamped and signed by the engineer of record. INSPECTIONS - Schedule Online at: htt s://Inspection.MVBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Friday, August 14, 2020 8:59:51 AM 2 of 2