Loading...
Building Permit 2020_1BLDG Permit PERMITNUMM121 Ir'SIDENTIAL City of • • • 5th Ave N, Edmonds WA 98020 ww.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: HARB NADER N Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00572700001800 Site Address: 19303 80TH PL W EDMONDS,WA 98026-6219 Applied: 3/17/2020 Subdivision: 005727 Lot: 0 Issued: 4/27/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $50,000.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 4/27/2021 Code Edition: 2015 No. Stories: 1 # of Dwelling Units: 1 Issued by: NED Scope of Work: NADER-REMODEL FIRE DAMAGE hvac 4 gas lines inc WA State Contractor L & I #: TERSUCS891DW City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL CG ENGINEERING-DENNIS 250 4TH AVE S SUTIE 200, APPLICANT DENNIST@CGENGINEERING.COM TITUS EDMONDS WA 98020 CONTRACTOR TERSULI CONSTRUCTION P.O. Box 17525, SEATTLE WA (206)793-3744 matt@tersuli.com 98127 19303 80TH PL W, EDMONDS OWNER HARB NADER N WA 98026-6219 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 9/30/20 R7802 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/27/20 R4973 PER PERMIT FURNACE OR FIREPLACE 001.000.322.10.000.00 $30.00 $30.00 9/30/20 R7802 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 9/30/20 R7802 MISC MECHANICAL EQUIPMENT 001.000.322.10.000.00 $30.00 $30.00 9/30/20 R7802 FOR WHICH NO FEE IS INDICATED PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $750.00 $750.00 4/27/20 R4973 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $637.50 $637.50 4/27/20 R4973 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/27/20 R4973 TOTALS: $1,574.00 $1,574.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, September 30, 2020 12:17:59 PM 1 of 2 'SIDENTIAL BLDG '- rmit PERMIT NUM City of Edmonds . ••� i66 1 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Work approved under this permit may or may not qualify as an essential or allowed activity per the Governors Stay Home, Stay Healthy Order. Refer to the Order and the FOR Citys website for up-to-date information related to development activities during COVID- COVID-19 NOTICE INFORMATION 19. Issuance of this permit does not certify that construction is allowed to immediately occur, and inspections may or may not be granted accordingly. Construction activities and all required inspections will resume when the Order has been lifted. INSPECTIONS - Schedule Online at: https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING X-3 BUILDING FINAL" B-3 GAS PIPING TEST B-3 MECH EQUIP ATTACHMENT Printed: Wednesday, September 30, 2020 12:17:59 PM 2 of 2