Loading...
Building PermitPermitMECHANICAL PERMIT NU of Edmonds EdmondsCity 98020 BLD2021-0774 www.edmondswa.gov71.022 Type: MECHANICAL Owner/ Business: KIMBERLY PRECOUR Status: ISSUED Subtype: COMMERCIAL MECHANICAL Parcel No: 00580700003000 Site Address: 21700 HIGHWAY 99 EDMONDS,WA 98026 Applied: 6/7/2021 Subdivision: SP AFN 200307295008, 005807, BLA AFN 199909155005 Lot: 0 Issued: 6/16/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 12/16/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: SWEDISH RADIA-MECHANICAL, REPLACE OUTDOOR CONDENSER WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS.Ida j NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KIMBERLY PRECOUR 11621 E. MARGINAL WAY S., (206)650-7891 PERMITS@PSFMECH.COM SEATTLE WA 98168 CONTACT PSF MECHANICAL INC 11621 E. MARGINAL WAY S., (206)650-7891 permits@psfinech.com SEATTLE WA 98168 CONTRACTOR P S F MECHANICAL INC 11621 E. MARGINAL WAY S., (206)650-7891 permits@psfinech.com SEATTLE WA 98168 PUBLIC HOSPITAL DISTRICT 2 4710 196TH ST SW, LYNNWOOD OWNER SNOHOMISH CO WA 98036-5517 •- • DESCRIPTION 7PERM ACCOUNT AMOUNT PAID PAID DATE RECEIPT # E FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 6/16/21 R12855 ITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 6/16/21 R12855 PUMP - 1.75 BTU OR LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/16/21 R12855 PER PERMIT MECHANICAL PLAN REVIEW FEE 001.000.345.83.000.00 $110.00 $110.00 6/16/21 R12855 PLANNING FEE NOT CATEGORIZED 001.000.345.81.000.00 $110.00 $110.00 6/16/21 R12855 TOTALS: $360.00 $360.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, June 16, 2021 2:20:25 PM 1 of 2 PermitMECHANICAL PERMIT NUM City of Edmonds 14, . •:01 1 -. •. � • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS•• •nline at: https://Inspection.MyBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-0 MECH FINAL** Printed: Wednesday, June 16, 2021 2:20:25 PM 2 of 2