Building Permit 2020MANUFACTURED
Permit
PERMIT NU M
City of Edmonds
EdmondsI
98020
1 1 .
-. •.
Type: PREMANUFACTURED Owner/ Business: MATT CHRISTENSEN
Status: ISSUED
Subtype: MANUFACTURED COACH
COMMERCIAL
Parcel No: 27033600404600 Site Address: 9521240TH ST SW EDMONDS,WA
98020-5602
Applied: 4/7/2021
Subdivision: 005548, 004633, 005553, 005048, 004464, 004468, 004565,
Lot: 0
Issued: 6/18/2021
004476, 004463
Fire Sprinklers: No Lot Area: Zoning:
Final:
Valuation: $3,620.00 Occupancy Type: E Construction
Type: VB
Expiration Date: 6/13/2022
Code Edition: 2018 No. Stories: 1 # of Dwelling
Units: 0
Issued by: NED
Scope of Work: ESD - PORTABLE CLASSROOM 2
WA State Contractor L & I #: PACIFMS033DC City of Edmonds Business License #: 602454996-001-0001
,CONTACTSAmimmm
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MATT CHRISTENSEN
4010 LAKE WASHINGTON BLVD
(425)828-8948
MCHRISTENSEN@HOARCH.COM
STE 320, KIRKLAND WA 98033
CONTACT
HUTTEBALL+ OREMUS
4010 LAKE WASHINGTON BLVD
(425)828-8948
mchristensen@hoarch.com
ARCHITECTURE
STE 320, KIRKLAND WA 98033
CONTRACTOR
PACIFIC MOBILE STRUCTURES
PO BOX 1404, CHEHALIS WA
(877)225-5298
98352
20420 68TH AVE W,
OWNER
EDMONDS SCHOOL DIST 15
LYNNWOOD WA 98036-7405
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/13/21
R11639
PER PERMIT
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$110.00
$110.00
6/18/21
R12980
MANUFACTURED COACH
001.000.322.10.000.00
$500.00
$500.00
4/13/21
R11639
COMMERCIAL FEDERAL HUD LABEL
PARK IMPACT FEE - COM ADMIN
001.000.322.10.000.00
$100.00
$100.00
6/18/21
R12980
PARK IMPACT FEE - NON
332.100.345.85.000.00
$1,185.90
$1,185.90
6/18/21
R12980
RESIDENTIAL SQFT
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$223.60
$223.60
6/18/21
R12980
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$190.06
$190.06
6/18/21
R12980
TOTALS: $2,349.56
$2,349.56
CONDITIONS
CONDITION TYPE STATUS
NOTES
Printed: Friday, June 18, 2021 1:14:33 PM 1 of 2
MANUFACTURED Permit
PERMIT NU
City of Edmonds
•:� i 1 1 .
-. •.. •
JIL1-
HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
REQUIRED SPECIAL
FOR
Bolting in concrete.
INSPECTIONS
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
X-2 ENGINEERING FINAL
A-1 BUILDING PRECON
B-2 FOOTINGS
B-3 UNDERFLR FRAMING
B-4 FRAMING
B-5 BLDG SPECIAL
INSPECTION
X-3 BUILDING FINAL"
X-1 FIRE FINAL
Printed: Friday, June 18, 2021 1:14:33 PM 2 of 2