Soil Observation Report
PROJECT: Morino Residence Additions and Alterations JOB #: 20-0754
ADDRESS: 958 Walnut Street, Edmonds, WA REPORT #: S0003
PERMIT #: BLD2020-0876 DATE: 10/26/2020
CLIENT: T-Squared Construction, LLC PAGE #: 1 of 1
CONTRACTOR: T-Squared Construction, LLC INSPECTOR: Tristan Coragiulo
OBSERVATION OF: Spread Footing Subgrade
GeoTest was on site as requested to provide soil observation services at the above locations.
All locations and elevations are approximate and were provided by the contractor.
Upon our arrival, the contractor had over -excavated 12" of native footing soils on site since our
last site visit (refer to GeoTestrs Soil Observation Report S0002, dated October 23rd, 2020).
While on site, GeoTest observed dense, weathered tan to light gray, gravelly, very silty sand or
sandy silt within the base of the excavated footings. GeoTest probed these soils and achieved
up to 3" of penetration within the spread footings.
It is our opinion that these soils currently meet the design requirements put forth in the
structural plan set by others, specifying a load -bearing capacity of 2,000 psf.
GeoTest will return for further observation upon request.
ti ors , )C •d`~
Image 1. Spread footing soil
conditions upon our arrival.
V Y,•
t
COPIES: tsgrdconsbudionBgmai.corn --� Reviewed by
This report shall not be reproduced except in full• without the written approval of GeoTest Services, Inc.
GeoTesrs representatives are on -site to observe, test and provide recommendations. The Contractor retains sole responsibility for the methods,
operations and sequences of construction, including obtaining approval from the design authority and owner prior to proceeding with any change In the work scope and/or any associated costs.
GEOTEST
1.888.251.5276
Bellingham I Arlington I Oak Harbor
www.geotest-inc.com
111111110
Soil Observation Report
PROJECT: Morino Residence Additions and Alterations JOB #: 20-0754
ADDRESS: 958 Walnut Street, Edmonds, WA REPORT #: S0002
PERMIT #: BLD2020-0876 DATE: 10/23/2020
CLIENT: T-Squared Construction, LLC PAGE #: 1 of 2
CONTRACTOR: T-Squared Construction, LLC INSPECTOR: Tristan Coragiulo
OBSERVATION OF: Footing Subgrade
GeoTest was on site as requested to provide soil observation services at the above locations.
All locations and elevations are approximate and were provided by the contractor.
Upon our arrival, the contractor had over -excavated 12" of native footing soils on site since our
last site visit (refer to GeoTest's Soil Observation Report S0001, dated October 2nd, 2020).
While on site, GeoTest observed medium dense, weathered tan to orange, gravelly, very silty
sand or sandy silt within the base of the excavated footings. GeoTest probed these soils and
achieved up to 3" of penetration within the continuous footings, and between 8 and 12" within
the outer spread footings.
It is our opinion that the more dense soil within the continuous footings currently meet the
design requirements put forth in the structural plan set by others, specifying a load -bearing
capacity of 2,000 psf. We also recommend that the spread footings be excavated an additional
12" due to soft soil conditions.
GeoTest will return for further observation upon request.
COPIES: tsgrdconstrucfion@gmail.00m Reviewed by
This report shall not be reproduced except in full, without the written approval of GeoTest Services, Inc.
GeoTesrs representatives are on -site to observe, test and provide recommendations. The Contractor retains sole responsiblltty for the methods,
operations and sequences of construction, including obtaining approval from the design authority and owner prim to proceeding with any change In the work scope and/or any associated costs.
M
401 r
fib.
_ �_ I "� }fin! �yni��- •'•�,' t s ..
',t,, it- i�► F j Y✓ r• }-•.M�
J is t .� 'n -• v - o-�` /�� •` �~ �h f_�'� ,'
}�/ ��, may. r �',� _.rA �?�'_.Y r�` "�/"-` f.���4•�y� ��
may'
10( o- Y `.ice -•1. `..� t r y!ar..
5276
GEOTEST '8 akH Harbor
Dellingham � Arlington � Oak Harbor
vwvw.geotest- i n c.co m
Soil Observation Report
PROJECT: Morino Residence Additions and Alterations JOB #: 20-0754
ADDRESS: 958 Walnut Street, Edmonds, WA REPORT #: S0001
PERMIT #: BLD2020-0876 DATE: 10/2/2020
CLIENT: T-Squared Construction, LLC PAGE M 1 of 2
CONTRACTOR: T-Squared Construction, LLC INSPECTOR: Devin Murphy
OBSERVATION OF: Foundation Subgrade
As requested, GeoTest was on -site to provide soil observations of the kitchen addition
foundation subgrade at the location noted above. Prior to our arrival, the contractor had
potholed 1.5 feet below the current site grade in two locations. The observable soils within the
potholes consisted of a soft, brown, moist, gravelly, slightly sandy silt, interpreted as fill soils.
GeoTest used a 3/8" diameter steel soil probe to probe the bottom of the potholes and
observed approximately 12" of soft conditions before firm and unyielding soils were
encountered. The contractor was notified of our observations while onsite.
Image of proposed kitchen addition area, with one of two potholes in the foreground.
COPIES: tsgrdconstruction@gmail.com
-�' Reviewed by
This report shall not be reproduced except in full, without the written approval of GeoTest Services. Inc.
GeoTesCs representatives are on -site to observe, lest and provide recommendations. The Contractor retains sole responsibility for the methods,
operations and sequences of construction, including obtaining approval from the design authority and owner prior to proceeding with any change in the work scope and/or any associated costs.
jo
0
Soil Observation Report
1.888.251.5276
Bellingham I Arlington I Oak Harbor
vmwgeotest•inc.com
PROJECT: Morino Residence Additions and Alterations JOB #: 20-0754
CLIENT: T-Squared Construction, LLC REPORT #: S0001
CONTRACTOR: T-Squared Construction, LLC PAGE #: 2 of 2
Image of pothole soils with approximately 12" of soil probe penetration.