Plan review comments for Harvest Wonton Noodle 4-1-2021
Plan Review Comments
Plan Check #: BLD20210430 Date: March 1, 2021
Project Name / Address: Harvest Wonton Noodle / 22921 Highway 99, Edmonds
Contact Person / Phone Number: Idy Chang / 206 946 5248
Reviewer: Les Krestel Division: Wastewater Treatment Plant / Pretreatment
The subject application has been reviewed but cannot be completed until the following items have been addressed/completed.
The kitchen drains on the plan look good. I will approve the Pretreatment portion of your permit.
The hydromechanical grease interceptor (HGI) size on the plans is approved at 50 gallons.
Since the HGI will be installed suspended under the floor, be sure to install the HGI;
In a location where a service vehicle can reach the HGI and perform required pump outs.
Where the top of the HGI is at least 16” below the bottom of the ceiling and/or insulation.
Where the internal, removeable components can be removed from the HGI for inspection and cleaning.
Not directly above a parking space.
With unobstructed access to the HGI for the purposes of inspections and required pump outs.
Please respond to the questions by email and if I may be of any assistance or if you have any questions please email or call the numbers below. Thank you for your time.
Les Krestel
City of Edmonds Pretreatment Technician
Office: (206) 672 5755
Cell: (206) 595 3117
les.krestel@edmondswa.gov
City of Edmonds Wastewater Pretreatment Program
200 2nd Ave S., Edmonds, WA 98020
Office: (425) 672-5755 Mobile: (206) 595-3117