Loading...
ENG2021-0222 ROW PERMITRIGHT OF WAY EUC PERMIT PERMITNUMBER, City of Edmonds 98020ENG2021-022 www.cityofedmonds.gov Description: Traffic control for valve maintenance. ISSUED: 06/21/2021 Address: 7407 212TH ST SW EDMONDS WA 98026-7635 EXPIRES: 12/18/2021 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00566900400303 i I 11-1411 a NAME TYPE NAME ADDRESS PHONE APPLICANT PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 OWNER SOUND TOWNHOUSE APARTMENTS 16419 SE 24TH ST, BELLEVUE WA 98008 LLC INFORMFEE DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 .jE• • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. 77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 1W U% 6/21 /2021 RELEASED B DATE Printed: Monday, June 21, 2021 11:15:52 AM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • •:• •ENG2021-022 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. RUXIIIII I• INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Monday, June 21, 2021 11:15:52 AM 2 of 2 of EpM04O� RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal /'Vc. i sa° Requirements outlined in Right -of -Way permit Handout E6�. If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name 887036793 Site Address or if no site address use Property Address at NW corner of project area: 7407 212th ST SW Associated Permits: BLD PLN ENG X Owner and Entity Holding Franchise (if applicable) Name of Company PSE/Infrasource Franchise Ordinance No: Point of Contact Susan Sid ick Title SR Permit Specialist Address 1660 Park lane city Burlington State WA Zip 98233 Phone 425-457-6353 Email susan.sidickapse.com Contractor and Authorized Agent of Owner Name of Company (see note below) Contractor Contacts During Construction Primary Name PSE/Infrasource Susan Sidick Agent Name PSE/Infrasource Title SR Permit Specialist Title SR Permit Specialist Mobile 425-457-6353 Address 1660 Park lane Email susan.sidick@pse.com City Burlington State WA Zip 98233 Secondary Name Phone 425-457-6353 Title SR Permit Specialist Email susan.sidick@pse.com Mobile City of Edmonds Business License No: Email State License No: INFRASL871 C2 [N Contractor verifies it is currently bonded d( Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ExOther, please specify: Valve Maintenance ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ExTraffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) To provide traffic control for valve maintenance work area is approx 13' S c/1 of 212th ST SW & 21' W c/l of 74th AVE W No cuts anticipated RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF 1 SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ragas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No x 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the x project is proposed: 6a. Does your project involve wires/cables/lines? If yes: x How many are existing? How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: L How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: L How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 6XVD 6LGI.FN DATE: APPLICANT PRINTED NAME: 6XVDQ6LGLFN APPLICANT TITLE: 653HUPLW6SHFLDOLVW NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 El Z-OZJ TEMPORARY TRAFFIC CONTROL PLAN OV3HV o �210M I 212TH ST SW ---------------------- ---- ----------- �= m m � v ZUU' ZUU - !Wn W20-5R Notes: 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m 8. Work area will be 13' SCL of 212th ST SW & 21' WCL of 74th Ave W. 9. If used, place NO -PARK signs 72 hours in advance of the day that the work is to be done. oc1---------- �m d F- m w =r w 0 £-6M :Sol0= 0�I•-�0ZQM �0104- --- - ---- — — — — — — — Q _ — — — — — — Q ---------------------------------------------------------------------- — ------ ----------- ONLY < > --- 150, -- R3-5R 0 M6-2 0 m �o LEGEND ® 28" TRAFFr�� t O VALVE LO TRAFFIC WORK VE FLASHING G SIGN LOCATION RIGHT OF WAY ROW SCHEDULE TRAFFIC CONTROL INSPECTION THROUGH MYBUILDINGPERMITS.COM "_'a __ � __ 1r�y1 SP�rr✓Pur�1� iC1�� aci 60/65 1000, 45/55 500' 35/40 350' 30 200' 25 100, ;.CHANNELIZATION, MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 G20-2 Puget Sound Energy REV PUGET Designer: Traffic Control Supervisor: SOUND Jason Bisenius Gregory Harwood 06/14/2021 0 Card No. 012238 ENERGY 425-424-7316 Card Ex .pham od@p3 Job # gregory.phamood@pse.com jason.bisenius@pse.com (425)424-6425 887036793 Project Address: 7407 212TH ST SW, EDMONDS, WA 98206 Page 1 OF 1 Job #: 887036793 Date: Jurisdiction: Edmonds Right of Way Permit? RYES El NO Est. Start Date: Est. Duration: PRE -INSPECTION REPORT MEYSOUNO ENERGY 7407 212TH ST SW Address: City / Zip: Edmonds 98026 Customer: CUST PHONE NUffff9lT'___ PIVI / Insp: PHONE NUMBER WORK DESCRIPTION: _P (�,) o % o (— 'T-, c ra t4- ip PLAT MAP: I, (D IJ if L If I Ll rLsx- .77 Construction Method Open Trench ❑ Trenchless ❑ I —A 1 1- if A _-A A1,It' Work Location Size of Cut Surface Type 'If o f C L 2t Z -S 'N S of CIL 'N S of CIL ffFLAGGERS # 3 3 C7 MPH 171 OFFICERS # SPEED LIMIT 171 commercial ❑ Altered Commercial ❑ Residential F1 Altered Residential ❑ Multi -Family 1:1 Replacement Service Q New Constr. E] main maintenance Ej Stub E) rvice maintenance 1771 Extension eValve Maintenance 1­1 compete Sery Ej Cut & Cap I t.0 & _�,11 '" of CIL J4 +"' - )- A,) '1E W of CIL 'E W of CIL ❑ TROLLY LINES El Bus P # ❑ TRAFFIC SIGNAL [I ARTERIAL F1 Leak Repair Service Inform n CP Work Diameter me E]Pothole [:15/8" Ej 2 El Extension El 11/8" [:14 Y 50 25 El 11/4" [1630 El 2" El Iwo Mtr Loc: — El METER HOODS # ❑ NO PARKS # ❑ Template Bar EFV [] 1800 ❑ Bollards 2.5" # 112600 ❑Bollards 4" # ❑ 10,000 D FUEL LINE PERMIT NEEDED Fuel Line Length: Fuel Line Diameter: �3U N 116'N 1 11411 PE� 1991 0 N M CO t— LC-3 C/i O CO N � 212 H :::4::: W 13'S � 11 N 6 S HI 37 u @RISER � N M CV No electric grid information available Scale 1:450 S160068, Q164070 05-21-2021 Lat\Long=47.8069,-122.3329 O �PUGETSOUND ENERGY The Information on the attached maps Is subject to change without notice. Puget Sound Energy makes nowarranty, expressed or imp l l ed, concern Ing thesuitability of this Information for any purp se, Reaple11 agrees to not tlisclose this confidential information to an oth er person or entity, unless auth orized In writing by Puget Sound Energy. This maple not to be used for determining the actual location of sny PSE "edo rues (ca11811�'