ENG2021-0222 ROW PERMITRIGHT OF WAY
EUC PERMIT
PERMITNUMBER,
City of
Edmonds
98020ENG2021-022
www.cityofedmonds.gov
Description: Traffic control for valve maintenance.
ISSUED: 06/21/2021
Address: 7407 212TH ST SW EDMONDS WA 98026-7635
EXPIRES: 12/18/2021
rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00566900400303
i
I 11-1411 a
NAME TYPE NAME
ADDRESS
PHONE
APPLICANT PSE/INFRASOURCE
1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
CONTRACTOR PSE/INFRASOURCE
1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
OWNER SOUND TOWNHOUSE APARTMENTS
16419 SE 24TH ST, BELLEVUE WA 98008
LLC
INFORMFEE
DESCRIPTION
AMOUNT
PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00
$0.00
ENGINEERING INSPECTION FEE
$110.00
$0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE
$110.00
$0.00
.jE•
•
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
1W U% 6/21 /2021
RELEASED B DATE
Printed: Monday, June 21, 2021 11:15:52 AM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
•:• •ENG2021-022
www.cityofedmonds. ov/425.771.0220
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
RUXIIIII I•
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 TRAFFIC CTRL
Printed: Monday, June 21, 2021 11:15:52 AM 2 of 2
of EpM04O�
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
/'Vc. i sa° Requirements outlined in Right -of -Way permit Handout E6�.
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name 887036793
Site Address or if no site address use Property Address at NW corner of project area: 7407 212th ST SW
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
State WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
ExOther, please specify: Valve Maintenance
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
ExTraffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
To provide traffic control for valve maintenance work area is approx 13' S c/1 of 212th ST SW & 21' W c/l of 74th
AVE W No cuts anticipated
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
1
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ragas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
L
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
L
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: 6XVD 6LGI.FN DATE:
APPLICANT PRINTED NAME: 6XVDQ6LGLFN
APPLICANT TITLE: 653HUPLW6SHFLDOLVW
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
El
Z-OZJ
TEMPORARY TRAFFIC CONTROL PLAN
OV3HV
o �210M I
212TH ST SW
----------------------
----
-----------
�= m
m � v
ZUU' ZUU -
!Wn
W20-5R
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall
not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m
8. Work area will be 13' SCL of 212th ST SW & 21'
WCL of 74th Ave W.
9. If used, place NO -PARK signs 72 hours in
advance of the day that the work is to be done.
oc1----------
�m d F- m
w =r
w 0
£-6M
:Sol0=
0�I•-�0ZQM
�0104-
--- - ----
— — — —
— — —
Q
_ — — —
— — —
Q
---------------------------------------------------------------------- — ------
-----------
ONLY < > --- 150, --
R3-5R 0
M6-2 0 m
�o
LEGEND
®
28" TRAFFr��
t
O
VALVE LO
TRAFFIC
WORK VE
FLASHING G
SIGN LOCATION
RIGHT OF WAY
ROW
SCHEDULE TRAFFIC CONTROL
INSPECTION THROUGH
MYBUILDINGPERMITS.COM
"_'a __ � __ 1r�y1 SP�rr✓Pur�1� iC1�� aci
60/65
1000,
45/55
500'
35/40
350'
30
200'
25
100,
;.CHANNELIZATION,
MPH
TAPER
TANGENT
55/70
40
80
35/45
30
60
25/30
20
40
G20-2
Puget Sound Energy REV
PUGET Designer: Traffic Control Supervisor:
SOUND Jason Bisenius Gregory Harwood 06/14/2021 0
Card No. 012238
ENERGY 425-424-7316 Card Ex .pham od@p3 Job #
gregory.phamood@pse.com
jason.bisenius@pse.com (425)424-6425 887036793
Project Address:
7407 212TH ST SW, EDMONDS, WA 98206 Page 1 OF 1
Job #: 887036793
Date:
Jurisdiction: Edmonds
Right of Way Permit? RYES El NO
Est. Start Date:
Est. Duration:
PRE -INSPECTION REPORT MEYSOUNO ENERGY
7407 212TH ST SW
Address:
City / Zip: Edmonds 98026
Customer:
CUST PHONE NUffff9lT'___
PIVI / Insp:
PHONE NUMBER
WORK DESCRIPTION: _P (�,) o % o (— 'T-, c ra t4- ip
PLAT MAP: I, (D
IJ
if
L
If
I Ll rLsx-
.77
Construction Method
Open Trench ❑
Trenchless ❑
I —A 1 1- if A _-A
A1,It'
Work Location Size of Cut Surface Type
'If o f C L 2t Z -S
'N S of CIL
'N S of CIL
ffFLAGGERS # 3
3 C7 MPH
171 OFFICERS #
SPEED LIMIT
171 commercial
❑ Altered Commercial
❑ Residential
F1 Altered Residential
❑ Multi -Family
1:1 Replacement Service
Q New Constr.
E] main maintenance
Ej Stub
E) rvice maintenance
1771 Extension
eValve Maintenance
11 compete Sery
Ej Cut & Cap
I t.0
& _�,11 '"
of CIL J4 +"'
- )- A,)
'1E W of CIL
'E W of CIL
❑ TROLLY LINES
El Bus P #
❑ TRAFFIC SIGNAL
[I ARTERIAL
F1 Leak Repair
Service Inform
n CP Work
Diameter me
E]Pothole
[:15/8" Ej 2
El Extension
El 11/8" [:14
Y
50
25
El 11/4" [1630
El 2" El Iwo
Mtr Loc: —
El METER HOODS #
❑ NO PARKS #
❑ Template Bar
EFV
[] 1800
❑ Bollards 2.5" #
112600
❑Bollards 4" #
❑ 10,000
D FUEL LINE PERMIT NEEDED
Fuel Line Length:
Fuel Line Diameter:
�3U N
116'N
1 11411 PE�
1991
0
N M
CO
t— LC-3
C/i O
CO
N �
212 H :::4:::
W
13'S
� 11
N 6
S HI
37
u @RISER
� N
M CV
No electric grid information available Scale 1:450
S160068, Q164070
05-21-2021 Lat\Long=47.8069,-122.3329 O �PUGETSOUND ENERGY
The Information on the attached maps Is subject to change without notice. Puget Sound Energy makes nowarranty, expressed or imp l l ed, concern Ing
thesuitability of this Information for any purp se, Reaple11 agrees to not tlisclose this confidential information to an oth er person or entity,
unless auth orized In writing by Puget Sound Energy. This maple not to be used for determining the actual location of sny PSE "edo rues
(ca11811�'