The following changes have been made to all plan sets for all lots in the 244th St project to implement
slab on grade first floor instead of crawl space:
A2: Slab on Grade plan implemented; Detail 6/A2 altered; Detail 5/A2 removed; Detail 10/A2 added
A3: Section A updated to slab on grade
A5: Type 2 Story Section updated to slab on grade
WSEC: Energy Calcs updated to slab on grade with new max BTUH
Thank you