Loading...
Mietzner-Foundation RevisionIVlietzner Brothers Properties, LLC 244th St Project, Edmonds —11 Lots Revised: 3/7/2019 To whom it may concern The following changes have been made to all plan sets for all lots in the 244th St project to implement slab on grade first floor instead of crawl space: A2: Slab on Grade plan implemented; Detail 6/A2 altered; Detail 5/A2 removed; Detail 10/A2 added A3: Section A updated to slab on grade A5: Type 2 Story Section updated to slab on grade WSEC: Energy Calcs updated to slab on grade with new max BTUH Thank you Doug Williams Designer 425 530-1042 dougwilliams444@gmail.com