Loading...
BLD2021-0074+Eligible Facilities Request Letter+2.22.2021_12.22.53_PM+2057706INFINIGY8 FROM ZERO TO INFINIGY the solutions are endless Section 6409 (a) Modification Worksheet Purpose: This letter is to verify that T-Mobiles proposed project is an Eligible Facilities Request Per ECDC 20.50.080. This letter is provided to verify that T-Mobiles proposed collocation or modification to an existing facility qualifies as an eligible facilities request or if it would cause a substantial change as defined by ECDC 20.50.080 and the FCC Section 6409(a) of the Middle -Class Tax Relief and Job Creation Act of 2012 (Spectrum Act) (47 U.S.C. § 1455(a)). Pursuant to Section 6409(a) an application for review under Section 6409 (a) must answer two general questions: (1) is the proposed modification an eligible facilities request and if so, (2) will it cause a substantial change? Applicant Name: Vinh Dinh agent for American Tower/T-Mobile Phone: 206.295.5926 Email: vdinh@infinigy.com Project Address: 24329 Highway 99 (BLD2021-0074) 1. Eligible Facilities Request • Has the facility been previously approved either through a land use approval, or a building permit? Yes. • Has the facility been installed as originally approved? Yes. 2. Substantial Change Factors • Height Increases o Will modification cause the Tower height increases by more than 10% or 20 feet, whichever is greater? No INFINIGY8 o Other support structure height increases by more than10% or 10 feet, whichever is greater? No. • Width Increases o New appurtenance on the tower would extend horizontally by more than 20 feet or the width of tower structure at elevation of change, whichever is greater? No. o New appurtenance on the structure would extend horizontally from the edge of the structure by more than 6 feet? No. • Equipment Cabinets o More than standard number of new equipment cabinets for technology in question, but not more than 4 new cabinets? No. • New excavation or deployment at ground level o Any excavation or deployment outside the current boundaries of the leased/owned site and any access/utility easements? No. • Concealment elements o Does the proposed modification comply with all conditions in any prior approvals? yes. Site has no concealment - all new antennas and equipment will be of similar color. will fit inside new canister. 2