Loading...
Engineering Permit FormSEWER NEW MULTI FAMILY PERMIT PERMIT NUMBER of Edmonds hLCity www.cityofedmonds.gov• • Description: Sewer for 4 Unit Townhomes ISSUED: 06/30/2021 Address: 7528 215TH ST SW EDMONDS WA 98026-7691 EXPIRES: 06/30/2022 Permit Type: SEWER NEW MULTIFAMILY Permit Subtype: Parcel Number: 00501200001600 iiii I I NAME TYPE NAME ADDRESS PHONE APPLICANT CARL PIRSCHER 23114 100 AVE W, EDMONDS WA 98020 (206)368-9668 CONTACT CDA + PIRSCHER ARCHITECTS,INC 23114 100 AVE W, EDMONDS WA 98020 (206)368-9668 CONTRACTOR KMF CONSTRUCTION LLC 1209 N 47TH ST, SEATTLE WA 98103-6617 (206)604-8770 OWNER KEITH FORDE 77 1209 N 47TH ST, SEATTLE WA 98103 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 SEWER GENERAL FACILITY CHARGE - NEW MF $7,420.60 $7,420.60 SIDE SEWER PERMIT - NEW MULTI -FAMILY $220.00 $220.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW DATE Printed: Wednesday, June 30, 2021 3:02:20 PM 1 of 2 EWMTEW MULTI FAMILY PERMIT City of • • • www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Handout E71 for SEWER ASBUILT requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. WATER AND SEWER Maintain 10' of separation between the sanitary side sewer and the water service line. SEPARATION INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE X-2 ENGINEERING FINAL" E-2 SEWER PRESSURE E-2 SIDE SEWER Printed: Wednesday, June 30, 2021 3:02:20 PM 2 of 2