Loading...
ENG2021-0053 ROW PERMITOF WAY EUC PERMIT PERMIT NUMBER City of Edmonds AveRIGHT ••01 11 www.cityofedmonds.gov Description: PSE-RESTORATION ONLY FOR EXPIRED PERMIT ENG2019-0168 ISSUED: 06/30/2021 Address: 22019 HIGHWAY 99 EDMONDS WA 98020 EXPIRES: 12/30/2021 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 27042900301900 i NAME TYPE NAME ADDRESS PHONE APPLICANT PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 OWNER BEHAR EDMONDS VENTURES LLC 1000 SECOND AVE STE3330, SEATTLE WA 98104 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $220.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW J. majutv'al 06/30/2021 RELEASED BY DATE Printed: Wednesday, June 30, 2021 12:40:06 PM 1 of 2 -KRWOF WAY EUC PERMIT City of • • • Ave•:• •ENG2021-0053 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL E-7 RESTOR LIMITS Printed: Wednesday, June 30, 2021 12:40:06 PM 2 of 2 0 \:L L?,11(7. INC. 1 s`) u RECEIVED FEB 17 2021 ROW PERMIT NO.: ENG 2021-0053 CITY OF EDMONDS ISSUE DATE: 6/30/21 DEVELOPMENT SERVICES DEPARTMENT RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION PROJECT NAME: 106353230 CONTRACTOR: PSE/Infrasource Mailing Address: 1660 Park Lane, Burlington, WA 98233 State License #: INFRASL871 C2 City Business License #: N R-025677 CONTACT: Sue Sidick Phone #: 425-457-6353 Fax #: Email #: Susan.Sidick@pse.com ❑ Liability Insurance ❑ Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 22019 Highway 99 ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑iC Single Family ❑ Other ❑ EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Yes ® No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : Work is for restoration only referencing permit ENG2019-0168 WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑ Year: 1063 PAVEMENT CUT: CONCRETE CUT: ❑ Yes ❑ No ® Yes ❑ No If yes, indicate size of cut: _ If yes, indicate size of cut: 3 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + LF X LF SF Alley 72 Hrs + LF X LF SF Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. Susan-1 1 - sp.d by P,1111 02/17/2021 I d I cK DN at=Susan Sidi[k o=Pen@in DepaNnUS ou=Muniapal SIGNATURE Re1a��nn=emn��-=��=an=d�0700 �nm�-�s DATE Dena: 2019.0405.5922-0�00' Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31 /2021 stephen.gadke@pse.com (425) 424-6431 RESTORATION TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and Lynnwood standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 162' SCL of 220th St SW & 20-38' WCL of SR 99. WSDOT NOTES PAGE 4 Dtl3HV IQ�IaoM DVOH X NOTIFY WSDOT 48-72 HOURS PRIOR TO START OF WORK. CONTACT BONIE NAU AT 206-440-4471 PUGET to SOUND ENERGY JOB# 106354276 22019 SR 99 Edmonds (Rev-3) 3/18/2021 stephen.gadke@pse.com 425-424-6431 SHEET 1 of 4 WORK HOURS - OFF PEAK ONLY •� M-F 9 AM TO 3 PM NO FEDERAL HOLIDAYS. RESTORATION REQUIREMENTS TO MEET WSDOT STANDARDS (SEE LAST PAGE OF PERMIT) OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA x ROAD i WORK �1 AHEAD N � --------------------------' --------------------- - Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. --- ---------------------------- -— - -- — -- - -- — - — -- - — - — - -- — -- - -- — -- - -- — - — - — - — - — - — - — - b- — - — - b ---- 3 ----- b Q 50' 350' ------------------------------ Dom-. �•• LEGEND 9 28" TRAFFIC CONE ® WORK PIT TRAFFIC FLOW UNIFORMED Po�E POLICE OFFICER FLAGGER WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY ROW CHEVRON ARROW BOARD ---------------350' F� 350 i....... a ... .....' ... .... .. d ® _----- b N C-CURB N 220TH ST SW W20-1 W20-5R r c74 .> ENGINEERING DIVISION APPROVED AS NOTED %7at 06/29/2021 RESUB Jun 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31 /2021 stephen.gadke@pse.com (425) 424-6431 RESTORATION TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and Lynnwood standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 162' SCL of 220th St SW & the CL to 11' ECL of SR 99. I bQ 2 J� ------- ------------------ .I/ a -P -- 0 ° ------------------ �' ---- �' — - = - V u LEGEND * 28" TRAFFIC CONE ® WORK PIT TRAFFIC FLOW UNIFORMED 00 po,CE n POLICE OFFICER FLAGGER ti WORK VEHICLE/ oFs<qN gyFq Fp h FLASHING LIGHTS SIGN LOCATION ay�Ok �ti RIGHTOFWAY RESUB CHEVRON Jun 14 2021 ARROW BOARD • CITY OF EDMONDS ' DEVELOPMENT SERVICES ' DEPARTMENT PUGET SOUND ENERGY JOB# 106354276 22019 SR 99 Edmonds (Rev-4) 4/19/2021 stephen.gadke@pse.com 425-424-6431 ' SHEET 2 of 4 . . :°gym,• . WSDOT NOTES PAGE 4 C- ----------- .... .......a .,. .. --- ----- b ti C-CURB --------------------- 2207H ST SW SET UP PCMS AT LEAST 48-72 HOURS PRIOR TO START OF WORK TO NOTIFY REPEAT DRIVERS. DETOUR FOR 220TH ST SW - WB LEFT TURN LANE CLOSURE 220TH ST SW DETOUR LEFT TURN LANE CLOSED AT 220TH ST SW PLACE PCMS BOARDS 1 MILE BEFORE WORK AREA. Qi TWO -SECOND SEQUENCE 3-LINE, 8 CHARACTER MESSAGES WILL READ: � 1) LEFT LANE � � CLOSED AT 220TH ST 2) DAY(S) TIME(S) 3) FOLLOW DETOUR AT 224TH ST SW lib-6W 224TH ST SW DE�� v BFF ��F Ow �Fq Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 010741 Exp.5/31 /2021 stephen.gadke@pse.com (425) 424-6431 RESTORATION TRAFFIC CONTROL PLAN Notes: 1. All signs and spacing to conform to the MUTCD and Lynnwood standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 30" x 30" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 162' SCL of 220th St SW & 32 - 50'ECL of SR 99. WSDOT NOTES PAGE 4 I� � I b ' I 11 I --------------------------------------- -------------- ------------- -- ---------- -------- -_-_ ------------------------------------------------------ PUGET SOUND ENERGY JOB# 106354276 22019 SR 99 Edmonds (Rev-3) 3/18/2021 stephen.gadke@pse.com 425-424-6431 SHEET 3 of 4 P ' SPOTTER TO ASSIST PEDESTRIANS _____________ ... .... .. ... .... .�. .. .. ... • ... . ... ... ... C-CURB ---------- _______________________ _ 220TH ST SW ----------- ---------------------- d4 DRIVEWAY CLOSED - USE DRIVEWAY TO THE NORTHEAST OFF OF 220TH ST SW LEGEND ® 2811 TRAFFIC CONE ® WORK PIT TRAFFIC FLOW PonE UNIFORMED POLICE OFFICER FLAGGER WORK VEHICLE/ FLASHING LIGHTS SIGN LOCATION RIGHT OF WAY ROW CHEVRON ARROW BOARD RESUB Jun 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No.010741 Exp.5/31/2021 stephen.gadke@pse.com (425) 424-6431 CHANNELIZING DEVICE SPACING (FEET O.C.) MPH TAPER TANGENT 55/70 40 80 35/45 30 60 25/30 20 40 ONE -LANE. TWO—WAY/FLAGGER TAPER APPROXIMATELY 20 FEET O.C. DOWNSTREAM OR TERMINATION TAPER APPROXIMATELY 20 FEET O.C. RESTORATION TRAFFIC CONTROL PLAN BUFFER DATA BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 1 60 65 70 LENGTH (FEET) 155' 200' 250' 305' 360' 425' 495' 570' 645' 730' TMA ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 LBS. HOST VEHICLE WEIGHT > 22,000 LEIS. < 45 MPH 45-55 MPHI > 55 MPH < 45 MPH 45-55 MPHI > 55 MPH 100' 1 123' 1 172' 74' 1 100' 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED SIGN SPACING = X (FEET) DISTANCE BETWEEN ROAD TYPE SPEED SIGNS FREEWAYS & EXPRESSWAYS 55/70 MPH 1500+- (OR AS PER MUTCD) RURAL HIGHWAYS 60/65 MPH 800+- RURAL ROADS 45/55 MPH 500+- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350+- RURAL ROADS, URBAN ARTERIALS 25/30 MPH 2O0+-(2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 125 MPH OR LESS 1 100+-(2) ALL SIGNS ARE 48"X48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. (1)ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS. AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2)THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. TAPER/CHANNELIZING DEVICE TABLE LANE WIDTH 10 FEET 11 FEET 12 FEET SHOULDER TAPERS ASSUMES 10- SHOULDERS L 1/2 L L 1/2 L L 1/2 L •1/3 L MPH MERGING DEVICES SHIFTING DEVICES MERGING DEVICES SHIFTING DEVICES MERGING DEVICES SHIFTING DEVICES MPH L(EFT) NGT20 DEVICE 70' 5 35' 3 75' 5 40' 3 80' 5 40' 3 20 25' 3 25 105' 6 55' 4 115' 7 60, 4 125' 7 65' 4 25 35' 3 30 150' 8 75' 5 165' 9 85' 5 180, 10 90' 5 30 50' 3 35 20V 8 105' 5 22V 9 11V 5 245' 9 12V 5 35 70' 4 40 270' 10 135' 6 295' 11 150' 6 320' 12 160' 6 40 90' 4 45 450' 16 225' 9 495' 18 250' 9 540' 19 27V 10 45 150' 6 50 500' 14 250' 8 550' 15 275' 8 600' 16 300' 9 50 170' 6 55 550' 15 275' 8 605' 16 305' 9 660' 18 33V 9 55 185' 1 6 60 600' 16 300, 9 660' 18 330' 9 720' 19 360' 10 60 200' 6 65 650' 17 325' 9 715' 19 370' 10 1 780 21 390' 11 65 220' 7 70 700' 19 350' 10 770' 20 385 11 840' 22 420 12 70 235' 7 4 FOR SHOULDER TAPER EQUALS SHOULDER WIDTH X SPEED. FIGURES SHOWNARE FIM A 10' SHOULDER PUGET SOUND ENERGY JOB# 106354276 22019 SR 99 Edmonds (Rev-3) 3/18/2021 stephen.gadke@pse.com 425-424-6431 SHEET 4 of 4 NOTES: 1. NOTIFY WSDOT AT LEAST 5 DAYS PRIOR TO STARTING WORK. 2. AT TIME OF WORK, CALL WSDOT RADIO (PER REGION AS INSTRUCTED IN PERMIT) AT THE TIME THE LANE IS CLOSED (OR INTERSECTION FLAGGED); AND AGAIN WHEN THE LANE/INTERSECTION IS OPENED. LEAVE A CONTACT NAME AND CELL PHONE NUMBER WITH RADIO. 3. FLAGGERS SHALL BE IN RADIO CONTACT WITH EACH OTHER AT ALL TIMES; FLAGGER STATIONS SHALL BE ILLUMINATED DURING HOURS OF DARKNESS WITH MINIMUM 150W LIGHT. 4. ONLY ESSENTIAL EQUIPMENT OR MATERIALS SHALL BE ON WSDOT R/W DURING NON —WORKING HOURS. 5. ALL CHANNELIZING DEVICES SHALL BE TRAFFIC SAFETY DRUMS UNLESS OTHERWISE NOTED. ANY CHANNELIZING DEVICES USED DURING HOURS OF DARKNESS SHALL HAVE STEADY BURN TYPE C LIGHTS. 6. DURING NON —WORKING HOURS, WORK AREA SHALL MEET CRITERIA IN WSDOT STD. SPECS. 1-07.23; INCLUDING, BUT NOT LIMITED TO, 'DROP OFF PROTECTION. SIGNS ARE TO BE 48" X 48" RETRO REFLECTIVE AND SIGNS AND STANDS NEED TO MEET THE (NCHRP) 350 CRASH WORTHY REQUIREMENTS. SEE STD. SPEC 1-10.2(3) (CONFORMANCE TO ESTABLISHED STANDARDS) PAGE 1-108 IN THE 2012 STANDARD SPECIFICATIONS MANUAL. 0 ALL PERSONNEL SHALL WEAR HIGH —VISIBILITY APPAREL MEETING THE ANSI/ISEA 107-2004 CLASS 2 OR 3 STANDARD. DURING HOURS OF DARKNESS, FLAGGING STATIONS SHALL BE ILLUMINATED. (SEE STD. SPEC 1-10.3(1)A (FLAGGERS AND SPOTTERS) PAGE 1-110 IN THE 2012 STANDARD SPECIFICATIONS MANUAL. THE CONTRACTOR SHALL PROVIDE PORTABLE LIGHTING EQUIPMENT CAPABLE OF SUFFICIENTLY ILLUMINATING A FLAGGER AND THEIR STATION WITHOUT CREATING GLARE FOR ONCOMING MOTORISTS, YET WILL MEET THE MOBILITY REQUIREMENTS OF THE OPERATION. THE LIGHTING STATIONS SHALL BE LOCATED ON THE SAME SIDE OF THE ROADWAY AS THE FLAGGER AND AIMED EITHER PARALLEL OF PERPENDICULAR TO THE TRAVELED LANES TO MINIMIZE GLARE. THE LIGHTING DEVICES SHALL BE LOCATED 5 TO 10 FEET FROM THE EDGE OF TRAVEL LANE WITH A MOUNTING HEIGHT OF 15 25 FEET ABOVE THE GROUND. THE FLAGGER SHOULD BE VISIBLE AND DISCERNABLE AS A FLAGGER FROM A DISTANCE OF 1,000 FEET. RESUB Jun 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Machuga, Jen From: Sidick, Susan <Susan.Sidick@pse.com> RESUB Sent: Tuesday, June 29, 2021 12:54 PM To: Griggs, Natalie Subject: FW: PSE Permit App for Restoration Only at 22019 Hwy 99 - ENG2021-0053 Categories: Green category Hi Natalie see answers below in Red. Susan Sidick 1660 Park Lane Burlington Wa 98233 425-457-6353 SR Permit Specialist From: Cooper, Jordan <Jordan.Cooper@pse.com> Sent: Tuesday, June 29, 2021 11:09 AM To: Sidick, Susan <Susan.Sidick@pse.com> Subject: RE: PSE Permit App for Restoration Only at 22019 Hwy 99 - ENG2021-0053 See in red below From: Sidick, Susan <Susan.Sidick@pse.com> Sent: Tuesday, June 29, 2021 10:37 AM To: Cooper, Jordan <Jordan.Cooper@pse.com> Subject: FW: PSE Permit App for Restoration Only at 22019 Hwy 99 - ENG2021-0053 Hi Jordan see email below and advise Thanks Susan Sidick 1660 Park Lane Burlington Wa 98233 425-457-6353 SR Permit Specialist From: Edmonds Engineering Permits<EngineeringPermits@edmondswa.gov> Sent: Tuesday, June 29, 2021 10:25 AM To: Sidick, Susan <Susan.Sidick@pse.com> Subject: RE: PSE Permit App for Restoration Only at 22019 Hwy 99 - ENG2021-0053 CAUTION - EXTERNAL EMAIL Phishing? Click the PhishAlarm "Report Phish" button. For mobile - forward to --m Hi Sue, Jun 29 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT I have reviewed the revised TCP with the detour with our Transportation Engineer, and I have the following comments/questions: Where does PSE intend to put the VMS/PCMS sign? There is only V of ROW behind the sidewalk in most of this stretch of Highway 99, so putting it on there or on the sidewalk would not be a good option as it would obstruct the sidewalk and would require the sidewalk to be closed. Can PSE put the VMS/PCMS sign at the intersection of 76th and Highway 99 (circled below)? There is a vegetated/bark area off the sidewalk that could potentially work for the sign. Please confirm that this sign placement could work for line of sight for northbound traffic on Hwy 99. 1 don't see an issue with the placement _ V .Q Icc a�;UJ W� Approximately how many days does PSE anticipate the work to take? for AA 2 days work The City will want PSE to provide at least 48-72 hours' notice prior to start of work (up to 1 week would be preferred). This would include putting up the VMS/PCMS ahead of time to notify traffic of the upcoming detour. Info For AA will contact Let me know if you have any questions. Thanks, Natalie City of Edmonds, Engineering Division Permitting EngineeringPermits@edmondswa.gov Natalie Griggs (she/her), Engineering Technician (425) 771-0220 ext. 1353 CITY HALL IS CURRENTLY CLOSED TO GENERAL PUBLIC ACCESS. APPOINTMENTS MAY BE CONSIDERED FOR SPECIAL CIRCUMSTANCES. Development services will continue to be provided by email or the web and by phone. Please visit www.edmondswa.gov for up-to-date information on City services. For engineering permit inquiries, please email: enaineeringpermits(aa-)edmondswa.gov For all other inquiries please email: devserv.admin(c�edmondswa.gov Web Map: www.maps.edmondswa.gov WSDOT RESTORATION REQUIREMENTS a. Cut in unpaved area outside of shoulder i. Backfill with native material, compact (no loose material left behind), restore to pre -construction b. Cut in unpaved shoulder i. Backfill with gravel or select borrow, compact using method "C", place shoulder dressing c. Potholing(Paved) (maximum 12" dimension) i. Backfill with CDF, match existing HMA or concrete depth. ii. 5' minimum distance from other potholes d. Potholing(Soft Shoulder ditch and outside) (maximum 12" dimension) i. Backfill with Native Material, 12" topsoil min below ground. e. Jacking pit or Bore Pit i. Repave with HMA Class '2" PG 5SH-22. ii. Pave full lane or shoulder width five feet (5') on either side of the pit longitudinally matching existing HMA depth. iii. CDF backfill should be used only where compaction is hard to reach (such as an open cut where trench width is less than 40"), gravel borrow or select borrow is normally the preferred back fill to have free draining material. iv. Maximum trench width needs to be outside casing pipe width plus one foot on either side. v. The top lift paving minimum width needs to be 40" plus 6" minimum on both sides. vi. CSBC thickness should specify 4" minimum or match existing depth whichever is greater. vii. Pavement to be replaced to the centerline or lane line on lane of open cut". f. Cutting Concrete Roadway i. Replace full panel, match existing depth or 0.75' whichever is higher. Match existing underlayment material and depth. g. Asphalt over concrete No less than % of PCCP panel can be left. Replace removed PCCP portion with HMA, match existing HMA depth over concrete panel. h. Concrete sidewalk i. Full panel replacement to the nearest joint. Please let me know if you have any questions. Thanks, 12