Loading...
Building Permit 2021Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00610700200600 Site Address: 10032 EDMONDS WAY EDMONDS,WA 98020-5128 Applied: 6/9/2021 Subdivision: 006107, ROS AFN 200203075001, SP S-3-85 Lot: 0 Issued: 7/1/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 5/13/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: THRIVE KIDS DENTISTRY- PLUMBING FOR NEW T/I (@WESTGATE VLG) WA State Contractor L & I #: LOCALPC063J9 City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT MIKE SATKO 1496, MAPLE VALLEY WA 98038 (310)982-8557 MIKESATKO@OUTLOOK.COM CONTACT LOCAL PLUMBING AND 1496, MAPLE VALLEY WA 98038 (310)982-8557 mikesatko@outlook.com CONCTRUCTION INC. AL PLUMBING &CONST CONTRACTOR NC 1496, MAPLE VALLEY WA 98038 (310)982-8557 mikesatko@outlook.com 4025 DELRIDGE WAY SW STE OWNER WESTGATE VILLAGE LLC 350, SEATTLE WA 98106 INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 7/1/21 R13259 PERMITS BACKFLOW - 2 INCH 001.000.322.10.000.00 $70.00 $70.00 7/1/21 R13259 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/1/21 R13259 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $195.00 $195.00 7/1/21 R13259 TRAP MEDICAL GAS PIPING 001.000.322.10.000.00 $260.00 $260.00 7/1/21 R13259 PLUMBING - PLAN REVIEW FEE 001.000.322.10.000.00 $110.00 $110.00 7/1/21 R13259 HOURS WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 7/1/21 R13259 EXPANSION TANK TOTALS: $740.00 $740.00 IM �iiiiim ._.Iw CONDITION TYPE STATUS NOTES Printed: Thursday, July 01, 2021 2:36:06 PM 1 of 2 Permit City of Edmonds PERMIT NUM EdmondsPLUMBING 98020 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION COMPLETED RESULT I r SEQID INSPECTION TYPE INSPECTOR DATE X-0 PLUMBING FINAL" B-3 PLUMB ROUGH IN B-3 PLUMB GROUND WK B-7 BUILDING OTHER INSP B-5 BLDG SPECIAL INSPECTION Printed: Thursday, July 01, 2021 2:36:06 PM 2 of 2