Loading...
Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00565500001000 Subdivision: 005655, 003931 Fire Sprinklers: Valuation: $6,000.00 Code Edition: 0 Site Address: 1452 8TH PL 5 EDMONDS,WA 98020-6609 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: FRIEL- VOL. SEISMIC RETRO FIT Applied: 6/13/2021 Issued: 7/6/2021 Final: Expiration Date: 7/1/2022 Issued by: NED WA State Contractor L & I #: SEATTSL807JL City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT RYAN VYTLACIL 6712 34TH AVE SW, SEATTLE (206)384-6585 RYAN@SEATTLERETROFIT.COM WA 98126-4208 CONTACT SEATTLE SEISMIC LLC 6712 34TH AVE SW, SEATTLE (206)384-6585 ryan@seattleretrofit.com WA 98126-4208 CONTRACTOR SEATTLE SEISMIC LLC 14054 2ND AVE NW, SEATTLE (206)384-6585 ryan@seattleretrofit.com WA 98177 1452 8TH PL S, EDMONDS WA OWNER JOHN 1R & MARY D FRIEL 98020 DESCRIPTION 7PER ACCOUNT AMOUNT PAID PAID DATE RECEIPT # TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/15/21 R12854 PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $231.00 $231.00 7/3/21 R13332 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $196.35 $196.35 6/15/21 R12854 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 7/3/21 R13332 TOTALS: $473.85 $473.85 CONDITION TYPE STATUS NOTES Printed: Tuesday, July 06, 2021 9:03:06 AM 1 of 2 'RESIDENTIAL BLDG Permit City of Edmonds PERMIT NUM www.edmondswa.gov• • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION �045=410 -tiff MEIN COMPLETED SEQID INSPECTION TYPE INSPECTOR DATE A-1 BUILDING PRECON B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 EXT WALL SHEATHING B-5 BLDG SPECIAL INSPECTION Printed: Tuesday, July 06, 2021 9:03:06 AM 2 of 2