Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00565500001000
Subdivision: 005655, 003931
Fire Sprinklers:
Valuation: $6,000.00
Code Edition: 0
Site Address: 1452 8TH PL 5 EDMONDS,WA 98020-6609
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: FRIEL- VOL. SEISMIC RETRO FIT
Applied: 6/13/2021
Issued: 7/6/2021
Final:
Expiration Date: 7/1/2022
Issued by: NED
WA State Contractor L & I #: SEATTSL807JL City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
RYAN VYTLACIL
6712 34TH AVE SW, SEATTLE
(206)384-6585
RYAN@SEATTLERETROFIT.COM
WA 98126-4208
CONTACT
SEATTLE SEISMIC LLC
6712 34TH AVE SW, SEATTLE
(206)384-6585
ryan@seattleretrofit.com
WA 98126-4208
CONTRACTOR
SEATTLE SEISMIC LLC
14054 2ND AVE NW, SEATTLE
(206)384-6585
ryan@seattleretrofit.com
WA 98177
1452 8TH PL S, EDMONDS WA
OWNER
JOHN 1R & MARY D FRIEL
98020
DESCRIPTION
7PER
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/15/21
R12854
PERMIT
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$231.00
$231.00
7/3/21
R13332
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$196.35
$196.35
6/15/21
R12854
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
7/3/21
R13332
TOTALS: $473.85
$473.85
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, July 06, 2021 9:03:06 AM 1 of 2
'RESIDENTIAL
BLDG Permit
City of Edmonds PERMIT NUM
www.edmondswa.gov•
•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
�045=410
-tiff MEIN
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
DATE
A-1 BUILDING PRECON
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-3 EXT WALL SHEATHING
B-5 BLDG SPECIAL
INSPECTION
Printed: Tuesday, July 06, 2021 9:03:06 AM 2 of 2