BINDER FIELD REPORTS 1 2 & 3FIELD REPORT NELSON Project: Binder Residential Development GEOTECHNICAL Owner: Deborah Binder ASSOCIATES, INC. Location: Edmonds, WA 17311 135TH Ave. NE #A-500 Weather: Sunny; 70's Woodinville, WA 98072 Purpose of Geotechnical Consultation and (425) 486-1669 FAX 481-2510 Visit: Construction Monitoring East Wenatchee, WA 98802 (509)665-7696 File No.: 11544B-20 Date: 8/7/2020 Report No: 1 Page 1 of 2 By: AJS We visited the site today at the request of Deborah Binder to provide geotechnical consultation and earthwork construction monitoring services for the residential development project located at 8912 — 192°d Street SW in Edmonds, WA. Upon arrival, we met with Leif, the contractor on site, to discuss the current excavation progress. We noticed that the foundation and basement subgrade had been completely excavated. We were requested to evaluate the subgrade for bearing capacity. Foundation and basement subgrade consisted of a gray silty sand with gravel which we interpreted as native glacial till. We evaluated the subgrade with a V2 inch diameter steel probe rod under moderate pressure. Probing yielded less than %2 inch, which we interpreted as dense or better conditions. It was noted that a roughly 100 square foot portion of the foundations in the southwestern corner probed up to 4 inches. We interpreted this as medium dense and recommended its removal before foundations were placed. The contractor on site said this would be done. While on site we also evaluated the cut stability of the basement excavations. Excavation cuts were roughly 8 feet in height and consist completely of the native glacial till. We observed no signs caving or signs of imminent failure while on site. Basement cuts appeared stable at the time of our site visit. Our findings and conclusions are based on observations made while on site_ Foundation subgrade and the temporary basement cuts appear to be prepared in accordance to the approved site plans and our recommendations and should support the planned loads. We are able to return to the site upon request. Attachment: Distribution: Signed: t Austin Slabaugh Binder Res Deer Site Plan 11544E-20 Date: FR##'I Page: of a Legend F :1 Ama of Excavation Basement cx._ Drawings Not To Scale FIELD REPORT NELSON Project: GiEOTECHNICAL Owner: ASSOCIATES, INC Location: 17311 135th Ave. NE #A-500 Weather: Woodinville, WA 98072 purpose of (425) 486-1669 FAX 481-2S10 105 Palouse Street Visit: Wenatchee, WA 98801 (509)665-7696 COE # RLD2020-0412 Binder Residence Development Deborah Binder & Gaetan Veilleux 8912 —192nd St SW, Edmonds, WA Rain, 58"F Geotechnical Consultation and Construction Monitoring NGA File: 11544B20 Date: 9/24/2020 Report No: 2 Page 1 of 2 By: CTC We visited the site today on behalf of the owners to observe the drainage system installation and temporary cut conditions located at the above address in partial fulfilment of the permit requirements. Upon arrival we met with John the contractor to discuss the current status of the project. Upon arrival to the site, we observed that foundations had been completely constructed, and that footing drains had been installed around the lowest exterior portions of the structure in temporary excavations. Drain board was installed on subsurface walls above footing drains. Footing drains were properly oriented and connected, and were connected on either side of foundations with sleeve 'culverts' beneath the footings where necessary. We understand the contractor intends to place drain rock above the footing drains, which was partially stockpiled on - site. Other areas of backfill are intended to utilize select, native excavation spoils. While on site, we also observed the cut stability of the basement excavations. Temporary excavation cuts were roughly 8 feet in height and consisted completely of the native, glacial till. We observed no signs caving or signs of imminent failure while on site. Temporary cuts appeared stable at the time of our site visit. We are currently experiencing significant precipitation. We documented the presence of erosion control in the form of silt fencing on the downhill, western portion of the site. We recommended covering soil stockpiles to retain optimum moisture content, due to their fine-grained nature. If stockpiles are exposed to too much precipitation, they may not function adequately as backfill until dried back to optimum conditions. We have been providing geotechnical consultation and construction monitoring services on a part-time basis. Our findings and conclusions are based on specific observations made while on site. In our opinion, the drainage installed around the perimeter of the foundations appeared to be installed correctly. We will continue to monitor the construction, specifically backfill compaction processes in accordance with permit requirements, and are available to return to the site upon request to provide additional consultation. Attachment: Site Plan Signed: a Distribution: Carston T. Curd, GIT I Binder Residence CM NGA #11544820 Date: 912-4/lo2,0 FR# OX Pg 4 Legend N Drawings not to scale All drawings approximate FIELD REPORT NELSON GEOTECHNICAL ASSOCIATES, INC 17311 135th Ave. NE #A-500 Woodinville, WA 98072 (425) 486-1669 FAX 481-2510 105 Palouse Street Wenatchee, WA 98801 (509) 665-7696 Project: Binder Residence Development Owner: Deborah Binder & Gaetan Veilleux Location: 8912 —192"d St SW, Edmonds, WA Weather: Sunny, 70°F Purpose of Geotechnical Consultation and Visit: Construction Monitoring NGA File: 11544620 Date: 9/28/2020 Report No: 3 Page 1 of 2 By: AJS COE # BLD2020-0412 We visited the site today on behalf of the owners to observe backfill compaction around the building foundations as part of the permit requirements. Upon arrival, we met with John, the contractor, to discuss the current construction operations. We observed that foundations were backfilled with the on -site soils to within 2 feet of the top of the footings. Backfill material consisted of a brown silty sand with trace organics compacted with a hand operated jumping jack. We evaluated the backfill with a %: inch diameter steel probe rod under moderate pressure. Probing yielded up to 1 inch, which we interpreted as medium dense or better conditions. We have been providing geotechnical consultation and construction monitoring services on a part-time basis. Our findings and conclusions are based on specific observations made while on site. In our opinion, that the backfill placed around the foundations is compacted in accordance with the approved site plans and our recommendations. If further geotechnical consultation is required, we are available to return to the site upon request. Attachment: Site Plan Distribution: Signed:J""J Austin Slabaugh Binder Residence CAA NGA #19544B20 Date: I/ a--91aO o FR# 3 P9 -Wa Le end � � � # &411;v F004,061.1.)+ Af4% *Afros Probed n N Drawings not to scale All drawings approximate