Loading...
REVIEWED REVISION BLD BLD2020-0876+REVISIONS LETTER+10.27.2020_4.00.33_PMPelletier + Schaar, LLC 26911 9811, Drive NW, Suite B Stanwood, Washington 98292 P 36o-629-5375, f 36o-629-io65 info@pelletierschaar.com www.pelletierschaar.com P E L L E T I E R O S C H A A R Vision Based Architecture October 27, 2020 Denise Nelson Permit Coordinator City of Edmonds 121 Fifth Avenue N Edmonds, WA 98020-3145 RE: Permit Number: BLD2020-o876 Project Name: Morino Additions & Alterations Dear Denise, Itemized below are changes to the current permit application. 1. The new covered deck roof has been pulled away from the house wall requiring us to modify the main and upper floor / roof plans, west elevations, upper framing and foundation plans. a. The new kitchen window (1) has been changed to a taller folding style window requiring a flush header. The window is the same width so the header current header would not change but the framing plans (So.a)and detail 2/A4.1 have been updated. 3. An additional flush beam has been added between the kitchen and dining room. This revision is shown on the framing plan sheet So.2. If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, David Pelletier Pelletier + Schaar, LLC Pelletier + Schaar, LLC • 26911 98th Drive NW, Suite B • Stanwood, WA 98292 p 36o-629-5375, f 36o-629-1095 • info(@,pelletierschaar.com • www.pelletierschaar.com