Project Description
This project involves the design of a new covered deck and an addition to an existing kitchen. The new
covered deck will be wood framed. The roof will be framed with sawn lumber joists and supported by
wood beams and columns. The floor will be framed with wood joists supported by wood beams and
concrete footings. These calculations are supplemental to the originally submitted calculations dated
08.13.20. These calculations only include the design of a new flush beam between the kitchen and
entry area that was not included in the original submittal. Please refer to the calculations dated
08.13.20 for the rest of the design calculations.
Scope of Work
Provide structural calculations in accordance with current building code.
Basis of Design
Roof Loads Dead 15 psf
Snow 25 psf (snow)
Floor Loads Dead 15 psf
Live 40 psf
Deck 60 psf
Description By Date
CGP 10/26/2020
Checked Date
Project Summary
ENGINEERING Scale Sheet No.
NTS
250 4th Ave South
Project Job No..
Suite 200
Edmonds, WA 98020 Morino Residence 20264.10
IA a -r-) oo � r= �Z���.�;J�J L 1.
SM g
TZ&n q ))"
.UL-- /5 PsF
=60f!!5r
EM9
(' (Z
1.')L-=tsFSF
LL - % (;5 F
USA 5'/q psc.
sir- rorL-rr
CM
ENGINEERING
250 4th Ave. South
Suite 200
Edmonds, WA 98020
425.778,8500
www.cgengineering.com
Description By / Dateg�1��
�J
��j MAN Checked Date
/�— Scale Sheet No.
Project Job No.
ri�I F (} N T `It'd. MEMBER REPORT
PASSED
Roof, BM9
1 piece(s) 5 1/4" x 11 7/8" 2.0E Parallam@ PSL
Overall Length; 13' 3"
0
I, 12' 8" I.
❑1
All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal.
De 'gn Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
4700 @ 2"
5020 (2.25")
Passed (94%)
1.0 D + 1.0 L (All Spans)
Shear (Ibs)
3852 @ P 3 3/8"
12053
Passed (32%)
1.00
1.0 D + 1.0 L (All Spans)
Moment (Ft-Ibs)
15032 @ 6' 7 1/2"
29854
Passed (50%)
1.00
1.0 D + 1.0 L (All Spans)
Live Load Dell. (in)
0.238 @ 6' 7 1/2"
0.323
Passed (L/652)
1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)
0.336 @ 6' 7 1/2"
1 0.646
Passed (L/461)
1.0 D + 1.0 L (All Spans)
• Deflection criteria: LL (1-/480) and TL (1-/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Floor Live
Total
1 - Stud wall - SPF
3.50"
2.25"
2.11"
1394
3379
4773
1 1/4" Rim Board
2 - Stud wall - SPF
3.50"
2.25"
2.11"
1394
3379
4773
1 1/4" Rim Board
• Rim Board is assumed to carry all loads applied directly above It, bypassing the member being designed.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
13' 1" o/c
Bottom Edge (Lu)
13' 1" o/c
-Maximum allowable bracing intervals based on applied load.
Vertical Loads
Location (Side)
Tributary Width
Dead
(0.90)
Floor Live
(1.00)
Comments
0 - Self Weight (PLF)
1 1/4" to IT 1 3/4"
N/A
19.5
--
1- Uniform (PSF)
0 to 13' 3" (Front)
IT 9"
15.0
40.0
Default Load
+
0
System : Floor
Member Type : Flush Beam
Building Use : Residential
Building Code: IBC 2015
Design Methodology: ASO
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to
www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by ForteWEB Software
ForteWEB Software Operator
Job Notes
Cameron Partlow
CG Engineering
(425) 778-8500
cameronp@cgengineering.com
10/8/2020 9:25:54 PM UTC
ForteWEB v3.0, Engine: V8.1.3.1, Data: V8.0.0.0
Weyerhaeuser File Name: Morino Framing
Page 1 / 1
4
C A
nas aa.,
K
NTS
MOR) M0 R-C7s1)7,P7rJGra
FLyoR yK i NG,
rXIST x C,LK
-rv- I Q
vN, J
-04
ISPSr (Ftrz)�'lopSi:Cw�u-
LL- _ Flo PS r: (rm,
T. gMil - r31q#00 t 333q# Cu-)
C CM
ENGINEERING
250 4th Ave. South
Suite 200
Edmonds, WA 98020
425.778.8500
www.cgengineering.com
Description
Project
0. ski
/7Zo C/
By(::JCy�a I Date f�
Checked I Date
Scale I Sheet No.
Job No.
ZOUY 10
a F OR T �r1'I
MEMBER REPORT PASSED
Floor, Exist 5.125x12GLB
1 piece(s) 5 1/8" x 12" 24F-V4 OF Glulam
Overall Length: 8'
I
11
N
All locations are measured from the outside face of left support (or left cantilever end). All dimensions are horizontal.
Design Results
Actual @ Location
Allowed
Result
LDF
Load: Combination (Pattern)
Member Reaction (Ibs)
7032 @ 7' 10 3/4"
9161 (2.75")
Passed (77%)
1.0 D + 1.0 L (All Spans)
Shear (Ibs)
5824 @ 1' 2 3/4"
10865
Passed (54%)
1.00
1.0 D + 1.0 L (All Spans)
Pos Moment (Ft-Ibs)
16974 @ 3' 2"
24600
Passed (69%)
1.00
1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)
0.093 @ 3' 11 9/16"
0.260
Passed (L/999+)
1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)
0.130 @ 3' it 1/2"
1 0.390
Passed (L/720)
1.0 D + 1.0 L (All Spans)
• Deflection criteria: LL (L/360) and TL (L/240).
• Allowed moment does not reflect the adjustment for the beam stability factor.
• Critical positive moment adjusted by a volume factor of 1.00 that was calculated using length L = 7' 91/2".
• The effects of positive or negative camber have not been accounted for when calculating deflection.
• The specified glulam is assumed to have its strong laminations at the bottom of the beam. Install with proper side up as indicated by the manufacturer.
• Applicable calculations are based on Nos.
Supports
Bearing Length
Loads to Supports (Ibs)
Accessories
Total
Available
Required
Dead
Floor Live
Total
1 - Column Cap - steel
2.75"
2.75"
2.00"
1920
4756
6676
Blocking
2 - Column Cap - steel
2.75"
2.75"
2.11"
1998
5034
7032
Blocking
• Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Lateral Bracing
Bracing Intervals
Comments
Top Edge (Lu)
8' o/c
Bottom Edge (Lu)
8' o/c
-Maximum allowable bracing intervals based on applied load.
Vertical Loads
Location (Side)
Tributary Width
Dead
(0.90)
Floor Live
(1.00)
Comments
0 - Self Weight (PLF)
0 to 8'
N/A
14.9
1- Uniform (PSF)
0 to 8' (Front)
12' 4"
15.0
40.0
Default Load
2 - Uniform (PSF)
3' 2" to 8' (Front)
12' 9"
15.0
40.0
3 - Point (lb)
3' 2" (Top)
N/A
1394
3379
Linked from: BM9,
Support 1
0
System : Floor
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2015
Design Methodology: Aso
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties
related to the software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is
responsible to assure that this calculation is compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC-ES under evaluation reports ESR-1153 and ESR-1387
and/or tested In accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser product literature and installation details refer to
product application, input design loads, dimensions and support information have been provided by ForteWEB Software Operator
ForteWEB Software Operator
Job Notes
Cameron Partlow
CG Engineering
(425) 778-8500
cameronp@cgengineering.com
10/8/2020 9:55:48 PM UTC
ForteWEB 0.0, Engine: V8.1.3.1, Data: V8.0.0.0
Weyerhaeuser File Name: Morino Framing
Page 1 / 1
G,LT3 Fa)7-TJ "e , S
• 2 � S Q �d lrTl � Cj
w
G/k PA C rrV- 1, 7 3o
(EC
b
ADD N FW fOOT106, UNWL f?
N F W C-, L 13 `OO-por,"
TIZ 113 _ 7- - 5 12"" 0-6 -r VO Fsrr) t 10'(W75F) 4- I L'- 4" 65-"Vu T�r ))
= 4. -75tA-
TL = y,-� S " -F L(, -4 o' = ", `l S L�
T90VIDr Z-6 x Z-6 x(0" DGrr-P
rT 4 ,-// (3 ) // y f,!�A rL- 5A W�.1
Description By Date /a a
p7bWDA �r� � D S Checked Date
ENGINEERING 1�-L Scale Sheet No.
250 4th Ave. South
Suite 200 project Job No.
Edmonds, WA 98020
425.778.8500
www.cgengineering.com r' lVi'C). .r. 6'� 1'-d