Building Permit 2021Type: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00434212103700
Subdivision: 004342
Fire Sprinklers:
Valuation: $10,500.00
Code Edition: 0
Site Address: 203 5TH AVE S #1 EDMONDS,WA 98020
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: VINBERO-LIKE FOR LIKE WINDOW CHANGE OUT
Applied: 5/19/2021
Issued:7/12/2021
Final:
Expiration Date: 7/12/2022
Issued by: WAC
WA State Contractor L & I #: CENTEHL832KN City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
LEVI MASCIOTRA
PO BOX 61, MOUNTLAKE
(425)231-7065
LEVI@CLHHOMES.COM
TERRACE WA 98043
CONTACT
CENTERLINE HOMES,
LLC
PO BOX 61, MOUNTLAKE
(425)231-7065
levi@clhhomes.com
TERRACE WA 98043
CONTRACTOR
CENTERLINE HOMES LLC
PO BOX 61, MOUNTLAKE
(425)231-7065
levi@clhhomes.com
TERRACE WA 98043
VINBERO-R H OLD MILL
PO BOX 5003, BELLEVUE WA
OWNER
TOWN ASSOC LLC
98009
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/20/21
R12426
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
7/10/21
R13455
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$341.20
$341.20
7/10/21
R13455
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$290.02
$290.02
5/20/21
R12426
TOTALS: $696.22
$696.22
CONDITION TYPE
STATUS
NOTES
Printed: Monday, July 12, 2021 11:02:17 AM 1 of 2
•M MERCIAL BLDG Permit
City of Edmonds PERMIT NUM
IF
121 5th Ave N, Edmonds WA 98020 BLD2021-06�992
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS - Schedule Online
at: https://Inspection.MVBuildingPermit.com
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
X-3 BUILDING FINAL**
Printed: Monday, July 12, 2021 11:02:17 AM 2 of 2