Loading...
20180725100807July 17, 2018 City of Edmonds 121 — 51h Avenue North Edmonds, WA 98020 Mietznerlm., A Family of Home Building Companies 6�ii�r Re: Plan Check BLD2017-1336 Project Address: 8609 — 244th St. SW, Lot 3 To Whom It May Concern: This letter is in response to the Plan Review Comments made by the Planning & Engineering Division. Planning Division Reference is made to the letter dated November 28, 2017 from Mike Clugston & Brad Shipley, Associate Planners. Item 5. ADB Condition 2. To meet ADB Condition 2, we have added trim to all windows, and providing varied colors for trim around the windows. The trim will match the color of the gutters. It will look very nice. Item 6 ADB Condition 3. To meet ADB Condition 3, we added additional windows to the homes facing 244th (lots 1 & 11), the homes facing the hammerhead turnaround (lots 4 & 8), and the sides of homes facing east and west (Lots 5 & 7). Refer to the Exterior Colors Site Plan. Additional windows will provide for more architectural interest, especially on the 2nd floor. Item 7 Height Calculations. We have added a height calculation table to Sheet A-1 and clouded the change. Enp,ineering Division Reference is made to the letter dated December 15, 2017 from JoAnne Zulauf, Engineering Technician. Item 1. We added a note to Sheet Al to reference the Fill/Grade permit and clouded the change. Item 2. Noted. Item 3. We added the total impervious surface to sheet A-1 and clouded the change. In addition, we added the total impervious on each Lot Exhibit. 4seWV11= RESUB rWrwr ---ter.,.= JUL 2 5 2018 www.MietznerGroup.com ■ 11611 Airport Rd., Ste. B1 ■ phone 40J2MQi DEPARTMENT info@MietznerGroup.com Everett, WA 98204 fax 425. OF EDMONDS 3 July 17, 2018 City of Edmonds Re: Plan Check BLD2017-1336 Page 2 of 2 13uildinp, Division No comments were received by the Building Division. Should you have any questions, I can be reached at 425-212-2490, ext. 304. Respectfully submitted, Mike Mietzner Mietzner Brothers Properties, LLC Encl.