Loading...
APPROVED BLD 19911 89th Stamped & Scaled Drawings on 11x17 FormatCity Of Edmonds Buili. mg Department APPROVED PLANS MUST BE ON JOB SITE 00506200000800 RECEIVED PARCEL Nov 20 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Work STRUCTURAL REPAIR- BEAMS Address 19911 89TH PL W ------------------ 1----------------------------------- ------ Owner VEHRS/WHITE MAPLE •---------- ------------------------------------- ---------------------------------------- Approved Date: 12/03/2020 ------------------------------------------ ---------------------------------------- Building Official w• W v&Lacc Permit Number BLD2020-1253 ALL WORK SUBJECT OBTAIN ELECTRICAL TO FIELD PERMIT FROM INSPECTION FOR STATE LABOR & CODE COMPLIANCE INDUSTRIES City of Edmonds Building Department APPROVED Plans A Sk�{ I IJ lti i 2W i ��D�t08�1 I i 1 BA _ i 1IViA16 1 i«... 7,0 ;3 ri w( (H7 Lv Iie-- �y�i%yx 2.0 Kt��cNt•� j p�i�,:W T j i A SC(_UwO FcL )t// PLAW 44tWPV d wa w SAIeA6E 1 N Sew Ive W (_1) ►-vL_ RCA- ()j't/yr" %y 2 6C )9'11t tcllN p). Wj 1nA., J`'1.,Ic LLC-j 444 Vcl^rij 706.22?.915-01 0FFIi6 STRUCTURAL ENGINEERING SCOPE: OUR ENGINEERING SEAL ON THESE PLANS REPRESENTS THE LIMITED REVIEW OF THE FOLLOWING STRUCTURAL ITEMS: • DESIGN OF TWO ATTIC BEAMS ABOVE SECOND FLOOR BEAMS NOTED BELOW. • DESIGN OF THREE SECOND FLOOR BEAMS ABOVE THE FIRST FLOOR DINING ROOM, KITCHEN AND FAMILY ROOM IN CENTRAL PORTION OF THE HOME. • DESIGN OF SUPPORT COLUMNS FOR THOSE BEAMS DOWN TO FOUNDATION. • DESIGN OF ONE FIRST FLOOR BEAM TO SUPPORT POST FROM ABOVE. • DESIGN OF ONE NEW FOOTING FOR POST FROM ABOVE. • DESIGN OF REPLACEMENT FLOOR AND ROOF JOISTS IN CENTRAL PART OF HOME. THE BUILDING PLANS OUTSIDE OF THE AREA OF REVIEW WERE PROVIDED BY WHITE MAPLE; LLC. WE HAVE NOT BEEN ASKED TO REVIEW ANY OF THE EXISTING STRUCTURAL MEMBERS OUTSIDE OF THE CENTRAL PORTION OF THE HOME AS NOTED ABOVE, NOR ANY OF THE ARCHITECTURAL ITEMS ON THE DRAWINGS, INCLUDING. BUT NOT LIMITED TO: FIRE SEPARATION, WATERPROOFING, VENTING, WINDOWS, DOORS, INSULATION, SOUND CONTROL, ETC. THEREFORE, WE ARE NOT TAKING RESPONSIBILITY FOR THESE NON-STRUCTURAL RELATED ITEMS. is zt RECEIVED Nov 20 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT mct= / I. Ftv, N f�rrAr+ b N Env / ` (4)13/4"x91;4"2.0E Miicrollam LVL T w s' A I 9.6" 14'71@" 2 j REAR EXTERIOR WALL 11tn, k ,v1,7o k i j 2X6 ,\\1/9.ic aZI5— j TYp ' (IJ Nt'k, / A•rrdt� -� r31-�: t k,ri�, lati►Nb e2d �2w � �L Hanger All Joists TYp I E;� LwH 2— ! , t KI�C EN r y r j 2x10 +�T I I r I 1TYpN.NJ• N �' i I / y 51;•;sJr � , I jai= �L'b , s�,a.v � 1 ! N�^' /��✓6E2t 6 4AA&C I I I I FRONT EXTERIOR WALL A CA L-C 19911 89th PI. W; White Maple LLC; JeffVehrs; 206.227.9501 STRUCTURAL ENGINEERING SCOPE: LIMITED REVIEW OF THE FOLLOWING O OUR ENGINEERING SEAL ON THESE PLANS REPRESENTS THE STRUCTURAL ITEMS: • DESIGN OF TWO ATTIC BEAMS ABOVE SECOND FLOOR BEAMS NOTED BELOW. ` 3 • DESIGN OF THREE SECOND FLOOR BEAMS ABOVE THE FIRST FLOOR DINING ROOM, KITCHEN AND FAMILY ROOM IN CENTRAL PORTION OF THE HOME. 37791 �9 �� • DESIGN OF SUPPORT COLUMNS FOR THOSE BEAMS DOWN TO FOUNDATION. '1STI" �1 I'L • DESIGN OF ONE FIRST FLOOR BEAM TO SUPPORT POST FROM ABOVE. DESIGN OF ONE NEW FOOTING FOR POST FROM ABOVE. *+``' • DESIGN OF REPLACEMENT FLOOR AND ROOF JOISTS IN CENTRAL PART OF HOME. THE BUILDING PLANS OUTSIDE OF THE AREA OF REVIEW WERE PROVIDED BY WHITE MAPLE, LLC. WE HAVE NOT BEEN ASKED TO REVIEW ANY OF THE EXISTING STRUCTURAL MEMBERS OUTSIDE OF THE CENTRAL PORTION OF THE HOME AS NOTED ABOVE, NOR ANY OF THE ARCHITECTURAL ITEMS ON THE DRAWINGS. INCLUDING, BUT NOT LIMITED TO: FIRE SEPARATION, WATERPROOFING, VENTING, WINDOWS. DOORS, INSULATION, SOUND CONTROL. ETC. THEREFORE, WE ARE NOT TAKING RESPONSIBILITY FOR THESE NON-STRUCTURAL RELATED ITEMS. 4 RECEIVED Nov 20 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT I1P , 47b5 _ c rr ft. L.r -lb ri I!•Zv•LO NrW�� f'cs,- 7... ' Q..c�;, �n� sooty g��a�.r•l xtsr(y)tX/p �n/DE�- �cd,r�L fttea�+W� AgA+1�� Pc>r aAyE �i 1)4 jr 6 7ti Fv,rJn n0,- D wf 11lu r_J /fitirBw ( , vAlf.M-•7Itn/ VAAW 1^A.k.Ay I i ­�-am_­- - 1 ___ __ - - i 19111 81"" PI . I„a; Wt%.-c- ^P Il- LL-t^; 3-e.4 t4l r; lob .727R5'01 STRUCTURAL ENGINEERING SCOPE: OUR ENGINEERING SEAL ON THESE PLANS REPRESENTS THE LIMITED REVIEW OF THE FOLLOWING STRUCTURAL ITEMS: • DESIGN OF TWO ATTIC BEAMS ABOVE SECOND FLOOR BEAMS NOTED BELOW. • DESIGN OF THREE SECOND FLOOR BEAMS ABOVE THE FIRST FLOOR DINING ROOM, KITCHEN AND FAMILY ROOM IN CENTRAL PORTION OF THE HOME. • DESIGN OF SUPPORT COLUMNS FOR THOSE BEAMS DOWN TO FOUNDATION. • DESIGN OF ONE FIRST FLOOR BEAM TO SUPPORT POST FROM ABOVE. • DESIGN OF ONE NEW FOOTING FOR POST FROM ABOVE. • DESIGN OF REPLACEMENT FLOOR AND ROOF JOISTS IN CENTRAL PART OF HOME. THE BUILDING PLANS OUTSIDE OF THE AREA OF REVIEW WERE PROVIDED BY WHITE MAPLE, LLC. WE HAVE NOT BEEN ASKED TO REVIEW ANY OF THE EXISTING STRUCTURAL MEMBERS OUTSIDE OF THE CENTRAL PORTION OF THE HOME AS NOTED ABOVE, NOR ANY OF THE ARCHITECTURAL ITEMS ON THE DRAWINGS, INCLUDING. BUT NOT LIMITED TO: FIRE SEPARATION. WATERPROOFING, VENTING, WINDOWS, DOORS, INSULATION, SOUND CONTROL, ETC. THEREFORE. WE ARE NOT TAKING RESPONSIBILITY FOR THESE NON-STRUCTURAL RELATED ITEMS.