REVIEWED BLD BLD2020-1253+BLD RESPONSE 1.1+1.28.2021_10.32 (2)RESUB
Jan 28 2021 BLD2020-1253
CITY OF EDMONDS
DEVELOPMENT SERVICES
Donovan Akau, DEPARTMENT
Plumbing Changes:
In addition to the 9 Plumbing Fixtures (including icemaker) that are described on the plans — 5 additional
new fixtures will be replaced, including new supply lines, waste and venting in their existing locations.
Thank you,
Jeff
Jeff Vehrs
206.227.9501