Loading...
REVIEWED BLD BLD2020-1253+Structural_Analysis_or_Calculations+11.13.2020_9.06.01_AMMEMORANDUM RECEIVED Nov 20 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2020-1253 DATE November 12, 2020 TO Mr. Jeff Vehrs Company/Address White Maple, LLC 546 Forsyth Lane Edmonds, Washington Project Number: 20196.00 Project Name: White Maple, LLC Renovation Design Address: 19911 89th Place West Edmonds, WA IPACIFIC t� 0110 ENGINEERING TECHNOLOGIES, INC. 2150 N. 107t' Street, Suite 320 1 Seattle, WA 98133 www.pacengtech.com 1 206-281-7500 Phone Number: 206.227.9501 DISCUSSION: You have requested that we perform the following services: • Review drawings you prepared for the renovation to the dining room, kitchen and family room. You developed floor plans and showed the locations of three new beams supporting the second floor framing to be installed. • Review calculations prepared by others for the three proposed. • Review and design of three new flush beams (131, B2 and 133) supporting the second -floor framing above the dining room, kitchen, and family room in the central portion of the home. Two existing beams are being replaced (132 and 133) and one wall is being removed (above 131). • Design two attic roof beams (RB1 and RB2) to reduce loads on the second floor beams. • Design support/columns for new beams down to the foundation/grade. • Review and design repairs for three cut floor joists with improper sisters and two floor joists with holes from plumbing lines. Design floor joist connectors for this area of the home. • Review decayed roof joists and design new joists and connectors. It is our understanding that the City of Edmonds is requesting the following information as a result of your permit application in October 2020: Review of structural calculations prepared by others. Add information on the provided plans (prepared by you): o Existing or new roof and floor joists and recommended hangers. o Supports for new beams. I performed a site visit on November 5, 2020 to review the framing conditions. Since then, you have provided additional information related to the framing conditions. Refer to the plans you provided us and we marked -up in our attached Structural Calculations for additional information. Based on our review, we recommend the following: Attic Beams • Above the second floor bedroom ceiling joists, install a (2)1 314" by 11 718" Microllam LVL (2.OE) beam (RB1) directly above the first floor wall to be removed between the dining room and the kitchen (131). The new RB1 beam should span from the south wall above the garage to the wall south of the stair and is expected to have a clear span of 14'-6112" maximum (from column face to column face). • Above the second floor bedroom ceiling joists, install a (2)1 314" by 11 718" Microllam LVL (2.0E) beam (RB2) directly above the first floor beam (132) to be replaced between the kitchen and family room. The new RB2 beam 20196 memo white maple MEMORANDUM should span from the south wall above the garage to the wall north of the stair and is expected to have a clear span of 17'-8" maximum. • Provide a minimum of a (3) 2x4 Hem -Fir #2 column at each end of each beam from the attic ceiling down to the second floor. Provide solid blocking from the attic beam to the second floor top plates and then again from the second floor sheathing to the first floor top plates in the wall below. Fill voids in the joist bay around the beams as required to better transfer loads directly to the column below. The north column for RB2 does not align with the column on the first floor, so another (3) 2x4 column is required at the first floor. Additional support is required down to the foundation (refer to Crawlspace Support Framing section below). • Install a vertical cripple wall between the new beams and the roof rafters above. (Leave the existing diagonal bracing in place to assist with lessening roof deflections.) Screw the top plate to the underside of the roof rafters and provide blocking between the rafters. • Attach the ceiling joists to the new beams with Simpson H2.5As (joists hung from the beam). Floor Beams Supporting Second Floor • Install a (4) 1 314" by 9114" Microllam LVL (2.OE) flush beam (131) directly above the wall to be removed between the dining room and the kitchen, from the south wall adjacent to the the garage to the wall south of the stair. The beam is expected to have a clear span 14'-6112" maximum (column face to column face). • Install a (4) 1 314" by 11 7/8" Microllam LVL (2.OE) flush beam (132) to replace the 412 beam between the kitchen and family room, from the south wall adjacent to the garage to the wall south of the stair. The beam is expected to have a clear span of 14'-6112" maximum. • Provide a minimum of a (3) 2x4 Hem -Fir #2 column at each end of each LVLbeam. With the exception of the north ends of B21RB2, the second floor columns from RB1 and RB2 should align with the first floor columns. Provide solid blocking through the floor as required from column to column. Fill voids in the joist bay around the beams as required to better transfer loads directly to the column below. • Install 5112" by 12" deep 24F-V4 glulam beam(133) to replace the 4x12 beam above the family room (and below the second floor exterior wall). The beam should extend from the south family room wall to the closet wall at the north end of the room. The beam is expected to have a clear span approximately 14'-7" maximum. • Provide a minimum of a (2) 2x6 Hem -Fir #2 column at each end of the glulam beam. • Each of the three beams should have a minimum of 2" of bearing on the wall plate or column below (by the width of the beam). Second Floor Joists above Dinina Room. Kitchen and Familv Room • Above the family room at the north end of the room, there are two 2x10 floor joists with multiple plumbing holes near the bottom of the joist near midspan. There are also three joists above the north side of the kitchen that have been improperly spliced. Replace joists or sister new joists alongside existing for full span, using Hem -Fir #2 2x10 joists. • The existing and new floor joists should be attached to the flush beams with a Simpson LUS210. • Nail the existing floor sheathing to new joists (if replaced) with 10d nails at 6" on center. Low Roof Joists • The seven decayed 2x6 roof joists above the southern two-thirds of the family should be replaced with new Hem - Fir #2 2x6 joists at 16" on center. • The existing and new roof joists should be attached to the blocking on the flush beam with a Simpson LUS26. Attach the blocking to the flush beam with a minimum of (4) 10d nails per block of wood. • Install new roof sheathing to match the existing thickness as required to new/exist joists with a minimum of 8d nails at 6" on center. 20196 memo white maple MEMORANDUM Crawlspace Support Framing • Under the southern columns for 131 and B2, provide solid blocking from the post above down to the concrete foundation below. • Under the northern column for B1, provide a new wood PT 46 post tight to the underside of the floor sheathing below the column. (If there is a joist there, install the post under the joist and add solid blocking from the top of the post to the underside of the floor sheathing.) Provide positive attachments from the posts to the adjacent framing (clips and/or screws). The post should extend down to a 2'-3" by 2'-3" by V-0" deep concrete footing centered below the post. The footing should be reinforced with (3) #4 bars each way and the concrete should have a minimum compressive strength of 2,500 psi. Connect the post to the footing with an ABA46Z Simpson post base and a 5/8" diameter all -thread rod with a nut on the end embedded into the concrete a minimum of 6". Soil bearing below the foundation should be a minimum of 1500 psf. • Under the northern column for B2, provide a (2)1 3/4" by 91/4" LVL 2.0 E from the east foundation wall to the existing (2) 2x10 floor beam and (3) 2x6 post. If adjacent to another joist, connect the LVLs to that joist. Connect the (2) LVL to the top of the beam and to the plate at the foundation wall with a H2.5A framing clip. • Under the northern column for R82 (support framing that extends from the attic down to the foundation), provide a minimum of a (3) 2x4 down to the chimney foundation. Provide a positive connection from the post to the footing using A34 framing clips and concrete screws. Provide a positive connection at the top of the post to the adjacent woof framing (clips and/or screws). • Under the southern column for B3, it appears that there are two joists and a rim joist in the immediate area that provide solid blocking down to the foundation. Confirm the location of the column above to verify this condition, otherwise provide solid blocking down to the foundation. • Under the northern column for B3, the new LVL support recommended for the northern column for B2 will provide solid blocking down to the foundation. Refer to the Structural Calculations for this project (White Maple, LLC 19911 89th Place West, Edmonds) singed on 11/12/20 that includes Sheets 0 through 18 for additional and back-up information. Verification by the contractor that the columns align from floor to floor and that the beam spans are as described above is required. If it is discovered that any of the members do not align during construction, please notify us for additional review and recommendations. The preparation of drawings and specific construction details is outside of our scope of services. Please let us know if you have any questions, or if you require additional information. Michael P. Smith, P.E., S.E. Principal cc: AEL P. SA_ ~F� OF WAS,r, /I 37791 SSI�NAL Enclosure: Structural Calculations (19 pages) 20196 memo white maple PACIFIWAMM IC �0 ENGINEERING TECHNOLOGIES, INC. White Maple, LLC 19911 89`h Place West Edmonds, Washington Job No. 20196.00 Structural calculations for: o Two new roof beams and supports. o Three new second floor beams, including column/footing supports. o Floor joist sister/replacement. o Roof joist replacement. The scope of review is specific to the central portion of the home over the dining room, kitchen, and family room situated in the center of the home. Design is in accordance with the 2015 International Residential Code. 'EL P. S" WAS�rf..'. F� o � x I 79� L SSIONAL A FH � SCLUNO F",tl PVAA( cc ,'sr TO 3EA-w��li,FnO_ W fn�R 5Y <r L/7<.n:ARY ct-Fic! a A' wf (H7 LV 1. hfn 1 �y�IX,x�%y zoE ;. /</Tca.-`N 'FVJMA.�417iN Wq1.�. �CIiJL✓ . wA W ry B1 ao Ofe. ,ea 1 N vO" NGW (y�1�Iy„gYy 2aL L7..v,xt N Ems' Z S%,,,eIL 6,1$Nr FW,-N RGRM N&V (4)1 3/4-x5 Miaolla. L F Lvs lk D CA, - LL "ky"f L REAR EXTERIOR WALL Zoe )al wl".+c zxa {LiLG .XVIS-I> TT/YP C13 Iu LV✓ I A'rFALO1-Z tit-JLIL,,JI� W1 iEinfsON LVS-ZI.( _ ,I, 4FWN4 E!LS rov,V.04-7J!v ALL �x/st zxio A-r /6A4L T/YYR bl A/.0, LWa/e r N N"Ew (ie"mN•� «,� � / Lu57-ip dAM6C FRONT EXTERIOR WALL - -<-T , 2,W r"e.4- FaAr" IA14 ?iAt( 19911 89th PI. W; White Maple LLC; JeffVehrs; 206.227.9501 1i 01 ui+'N lc Grc/ B�GRcrn ,6ePRawr G B.a r�r �Mc sr e6 L� \ Tb CH, 1 Alsg4v� pal'r dASE �JO W/ IV VT Lv/,c- NEW 7i-",x2. 3A)e I 1 0 OCZA (.s+: PoOTA4v{II W/(-SV04 CA-IvAf n /Y,7.. _: .•-�. — - :rip edw✓<i_m-7d.��tT �ySl Fv✓n,vb YO, ANW iv" ; 4q.. A.4Y Q:4�✓IOi svLlO BbJole �7 Ex�rr(y) zxi0 .�'Ni-,' L'ND EA- �F6Js'2 f}iF.H'N.wl' '\zYb '1b PtivrlD/��7JN / F,yjvN�Al�v ✓ �`�x• Pus; I rwlnn/b waN i �GAn, ,2} /s 191 fAa--QAt- r17V,✓CIA�y,/ ibGi ,2} /s 191 fAa--QAt- r17V,✓CIA�y,/ ibGi Project No: 2-E7k 9 b Date: rroject Name: Comp. By: �� S a Sheet: _1 Of: Chk.By: :=:t i P-4 waft/ [ENGINEERING TECHNOLOGIES, INC. 2150 N. 107th St., Suite 320 Seattle, WA 98133 P:206.281.7500 www.PacEngTech.com MqI A> A ?jest No: Z 'a Date: Sheet: 15 Of: Project Name: IA- �- d/�' 0 %_ i Comp. By: Chk.By: PACI w4w/ ENGINEERING TECHNOLOGIES, INC. (j ! 2150 N. 107th St., Suite 320 Seattle, WA 98133 Contents: iZR ` ka,7G _rr� F, f, avY`, P: 206.281.7500 www.PacEngTech.com •oject No: ZO1Date: Sheet: -�L Of: Project Name: 7la ''- Comp. By: ✓MS Chk.By: \/ ENGINEERING TECHNOLOGIES, INC. r ^ �r ��/ ^ -y , �, �, 2150 N. 107th St., Suite 320 Seattle, WA 98133 Contents: '"' P:206.281.7500 www.PacEngTech.com Tv .t; L,+.yv1,P:✓ ...Ib�i C61, , ✓S.. -ILA✓•✓'._ G Spa -l%=biz R boAO; D =zog _iL6�1 SdS rf0 2to< lPgp:. FM -rNrs Jcfrr+ LL= Zass� �,ti�c (GLIlN/V Ann wgcl T-L = 93zl�� i tv,r dvy MR jV5'� f 2" xo;� YO I Z �V _ 21055 � Ca�✓t, oL2- 3z�n 2 r76i;J awG.y 3.,5 � 7 4-vL 1b,5 re -- I3�r LUG eA-P'- �-- � �w c„ro0A ToP_ y��lr� MAP: kx.�,o ��' :_ EZ v'� ✓ �lF,s,,�s� f/I_k �= utirs/, ' S3L r'1—n.41 Jeff Whrs rAµ'=fF� : to t �-► Nt. l .'n nt>o,.+s n.,t,R isx Crnt�i Rs nAnalyms li \T`� •� 11 /1xn F 2M D iN. Member Data ` Description: Member Type: Beam Application: Floor Top Lateral Bracing: Continuous . Bottom Lateral Bracing: Continuous S�u� Standard Load: Moisture Condition: Dry Building Code: SBC Live Load: 40 PLF Deflection Criteria: U360 live, 11240 total Dead Load: 10 PLF Deck Connedan: Naied 9 iq Member Weight 17.9 PLF Filename: Beam2 Yt IC Other Loads Type Thb. Other Dead (Description) Side Begin End yWuM1 Start Erd start End category Replacement Unfiorrn (PLF) Top O owl 14' 6w' 417 104 LM Spancarned 160 Wcontnuau span —a 4 � 14 6 0 � ---i i 14 6 0 Bearings and Reactions Input @Rn Gravity Gra%* Location Type Material Length Requfrod Reaction UpliR 1 O 0 owl Wall HF End -Grain (797ps) 3.500" 1-500" 378M - 2 14' 6 GW' Wall HF End -Grain 7 3.500" 1.50" 3788# Maldmtrn Load Cass Reactions umrvey,.a pn m(a cobaavrra^W^d+ Live Dead 1 293M aw 2 293M 8W Design spans 14' 0750' Product: 1 3f4"x91l4r' 2.0E N6crollam LVL 4 ply PASSES DESIGN CHECKS connect nuarrhens ve912 rows of U2" uiannebr botte at24.0" oc Design assumes contirrrrrxs laterat tinting along the top chord Design assures continuous lateral bracing along the boltorn chord Allov able Stress Design Pctrat Allowable capecibi Nation traufng Positive Moment 13317.'# 23304.# 57% 725' Total Load D+L Shear 3373 # 12302.# 27% 0.23 Total Load D+t. Max Reaction 3788 At 183751 20°h 0' Total Load D+L TL Deflection 0.5371" 0 7031" Lf314 7.26 Total Load D+L LL Deflection 04154" 0A6W' U406 729 Total Load L Contnt LLDekcbm DOLs Uve--100% &wF115% Roo"-t259/ vW'4-160% De$glasAx ampett�mer b6C ula�mberdnggtr.+a64% LUo-A %+✓t MPS r�rrof.cifaYn.fudtta giprecrae l;4Tgr (CI Z1150y 9npm•3rtpTn CnfpNkc NL NfMSRf:iN1® TLps4YI/tlla Nc1le MTlb P'n pr 4vfuO� ffynmlMJMb�rs gltlY�ioraep ImB lutpCmlm N£{aR Yftlwll�Ytl IM1Jgf mW YrosW 4 �Jfr,� awn/Ir 10 tic® mil rtlrbmaY fOflnmTriLl05 Timber Beam -Column Design Pacific Engineering White Maple NDS 2012 Edition - Technologies - 20196 Supports for B I Sheet 8 Member Identification Column Simple Span Timber Species: Hem -Fir Grade is No. 2 Sawn Lumber 2" to 4" wide Service conditions: Dry service Temperature up to 100 deg F Timber Properties Cm Ct CF Cfu CI Cr Adjusted Properties Fb x-x 850 psi 1.00 1.0 1.50 - 1.00 1.00 F*b x-x = 1,275 psi Fby-y 850 psi 1.00 1.0 1.50 1.10 1.00 1.00 F*by-y= 1,403 psi Ft 525 psi 1.00 1.0 1.50 - 1.00 - Ft= 788 psi Fv 150 psi 1.00 1.0 - - 1.00 - Fv = 150 psi Fc 1,300 psi 1.00 1.0 1.15 - 1.00 - F*c= 1,495 psi E 1,300,000 psi 1.00 1.0 - - 1.00 - E' = 1,300,000 psi Emin 470,000 psi 1.00 1.0 - - 1.00 - E'min = 470,000 psi Member is --> three 2 by 4 nominal Y adjust size in in True dimensions 4.50 in 3.50 in Area = 15.75 in S x-x = 9.19 in Height 8.00 It 5y-y= 11.81 in x--- - - -x lux-x 8.00 It Ke x-x = 1.00 -> le 1/d = 27.43 m lu y-y 8.00 It Ke y-y = 1.00 -> le 2/d = 21.33 Le*d = 2.06 x lu y-y *d = 692 for major axis bending Le/d = 27.43 for compression Y (3) 2x4 OK Member Service Loads Dead Live Snow Windl Wind2 E/1.4 Axial 2,086 lb 2,655 lb 1,704 lb lb lb lb Mx-x ft-lb ft-lb ft-lb ft-lb ft-lb ft-lb My-y ft-lb ft-lb ft-lb ft-lb ft-lb ft-lb V lb lb lb lb lb lb LDF 0.90 1.00 1.15 1.60 1.60 1.60 RB 5.85 5.85 5.85 5.85 5.85 5.85 NDS 3.3 F*b 1,148 1,275 1,466 2,040 2,040 2,040 NDS 3.3 FbEl 9,999 9,999 9,999 9,999 9,999 9,999 NDS 3.3 CL 0.99 0.99 0.99 0.99 0.99 0.99 NDS 3.3 F*c 1,346 1,495 1,719 2,392 2,392 2,392 NDS 3.71 FcE1 514 514 514 514 514 514 NDS 3.71 FcE2 849 849 849 849 849 849 NDS 3.71 CP 0.35 0.31 0.28 0.20 0.20 0.20 NDS 3.71 ------------------ -------------- AnalysisResults-------------------------------- Inter - Load Case Axial Mx-x My-y V fc fbx-x fby-y fv F'c/Ft F'bx-x F'by-y F'v action D+L 4,741 0 0 0 301 0 0 0 470 1266 1403 150 0.64 D+S 3,790 0 0 0 241 0 0 0 477 1454 1613 173 0.50 D+0.75(L+S) 5355.3 0 0 0 340 0 0 0 477 1454 1613 173 0.71 D+0.6*W1 2086 0 0 0 132 0 0 0 488 2015 2244 240 0.27 D+0.6*W2 2086 0 0 0 132 0 0 0 488 2015 2244 240 0.27 D+0.75(L+Wl+S) 4716.3 0 0 0 299 0 0 0 488 2015 2244 240 0.61 D+0.75(L+W2+S) 4716.3 0 0 0 299 0 0 0 488 2015 2244 240 0.61 D+0.75(L+S+E) 5355.3 0 0 0 340 0 0 0 488 2015 2244 240 0.70 0.6D-.6*W1 1252 0 0 0 79 0 0 0 488 2015 2244 240 0.16 0.6D-.6*W2 1252 0 0 0 79 0 0 0 488 2015 2244 240 0.16 0.6D-.7E 1252 0 0 0 79 0 0 0 488 2015 2244 240 0.16 printed 11/11/20207:23 PM Project No: 7pi0b Date: Sheet: 1Of: — Project Name: W �' Comp. By: t4( Chk.By: 010 i. p INr 1111ft1/ [ENGINEERING TECHNOLOGIES, INC. 2150 N. 107th St., Suite 320 Seattle, WA 98133 P: 206.281.7500 www.PacEngTeGh.com - oject No: ZJ ! lt!� Date: Sheet: j b of Project Name: Comp. By:� Chk.By: PACIFIC %ftW ENGINEERING TECHNOLOGIES, INC. r----� 2150 N. 107th St., Suite 320 Seattle, WA 98133 P: 206.281.7500 www.PacEngTech.com ^roject No: Z()I 9 G Date: Sheet: I l Of: Project Name: I'k— A�- M^ ,, !, Comp. By: p/-r Chk.By: PACIFIC Wa/ ENGINEERING TECHNOLOGIES, INC. —I 2150 N. 107th St., Suite 320 Seattle, WA 98133 Contents: ! (� y �� " = " �� �"n �' k-d dM P: 206.281.7500 www.PacEngTech.com lv3'9 :... /JoN'FH's -9 3.5 Q't6: j� I nJ�r 52 y-'z A& 4- "e n^ 1 / TL _Srobl r i,. Iz4 f�Y, gL s /V : L. 4P CA ��Na 1 �✓ �T L-63 S Y" i ' ai i✓ �... /"�•r.. i Zk v LX/Lvi� .• :fir 13/ �i /L LVL 2,0E r .✓s(� 6� rN sfZ�9 dN ➢ e 5�+ '„P�( [q.,� wig. tv' s .APB a�T N _�^ 4 vM,N FV g I ,am.�2015sne &ff VAIM Lnilixid�y�cd li 10I ID- t-�LI \Iftw, 1Tl 153X t'tnla Beim Ar Ay.%5 � `T -t ti M P-00hM Member Data Description. Member Type. Beam 2 Application: Flow I cJZ Top Lateral Bracing_ Continuous Bottom Lateral Bracing: Continuous Standard Load. Moisture Condition: Dry Building Code: SBC Live Load- 40 PLF Deflecinn Criteria: L/360 live, L7240 total ? 0 tq b Dead Load: 10 PLF Deck Connection: Nailed Member Weight 179 PLF Filename: VehrsBeam2. (i&/ 4LM c Other Loads Type Trux cow Dead (Description) Side Begin End Y1idd1 Start End Start End Category Additional Uniform (PLF) TOP 0 0.00" 14' 60(" 190 48 Lm 9-TTnbrda,,y% rooad Replacement Uniform( PLF) TOP 0 0.00" 14' 6.OX 167 42 Lre Spmcinied 90037'smplesw P 1460 �r laso Bearings and Reactions Input Min Gravity Graft Location Type Malaria{ l8ngih Regired Reac6On uplift 1 9 0.000" wait HF Endfinait (797pst) 3.5W 1.500" 32619 2 14' 6.000' Wag HF EnGGfdi1 3.500" 1.SOi7' 3251M Maldmum Load Case Reactions u.naNwawl c.cicbmymmµya,�m. Lne Dead 1 2WW 753M 2 250BM 7539 Design spans 14' 075LT Product 13W x9 UV 2AE Microllam LVL 4 ply PASSES DESIGN CHECKS Correct neuters with 2 rows of 1/7' cliianwhei bake at 24.0" oc Design assnrees comma as lateral bracing along ft lop chord Design assuirm c6rdnua6 lateral (racing along the botlotn chord. Allowable Stress Design Actual A lowabie capacity Lacallon LOO&V Positive Moment 11464.'S 23304'# 49% 726' TOW load D+L Shear 2903A 123024 23% 023' TOW Load DtlL Max Reaction 3261 # 18375A 17% 0 TOW Load D+L TL Dellection 0.4623' 0 7031" U365 7.25 Total Load D+L LL Deflection 0.3559' 046W' U474 7-W Total LOW L co" uoeoedon DOLS L1%e=100%Snov�115%Rrnf=125%LMM--160% DesgnaswmesarW%bwnenl6er u9"irgam 01iWx%Vskess; 4% 1LG L1(it7}77dr 1 H.itlrrwtrrr.ewmw �tl-.3aS4 �T'bwPs.Cmpesc ti.rtglrL WfB+MU IY fsr a �J !.}IP.A CIYOv�t 4Pv>J oYapluY i:OV (AdVY tC Wt f W a`AI Its �'*rV' a.! ¢Art yees.r !i !R ItVY. I4 Yti'JV6/t Timber Beam -Column Design White Maple NDS 2012 Edition 20196 Supports for B2: S end Member Identification Column Timber Species: Hem -Fir Grade is No.2 Service conditions: Dry service Temperature up to 100 deg F Pacific Engineering - Technologies - Sheet 13 Simple Span Sawn Lumber 2" to 4" wide Timber Properties Cm Ct CF Cfu Ci Cr Adjusted Properties Fb x-x 850 psi 1.00 1.0 1.50 - 1.00 1.00 F*b x-x = 1,275 psi Fby-y 850 psi 1.00 1.0 1.50 1.10 1.00 1.00 F*by-y= 1,403 psi Ft 525 psi 1.00 1.0 1.50 - 1.00 - Ft= 788 psi Fv 150 psi 1.00 1.0 - - 1.00 - Fv= 150 psi Fc 1,300 psi 1.00 1.0 1.15 - 1.00 - F*c= 1,495 psi E 1,300,000 psi 1.00 1.0 - - 1.00 - E' = 1,300,000 psi Emin 470,000 psi 1.00 1.0 - - 1.00 - E'min = 470,000 psi Member is --> three 2 by 4 nominal y adjust size in in True dimensions 4.50 in 3.50 in Area = 15.75 in Sx-x= 9.19 in3 Height 8.00ft Sy-y= 11.81 in x--- ---x lu z-x 8.00 It Ke x-x = 1.00 -> le 1/d = 27.43 m lu y-y 8.00 ft Ke y-y = 1.00 -> le 2/d = 21.33 Le*d = 2.06 x lu y-y *d = 692 for major axis bending I Le/d= 27.43 forcompression y (3) 2x4 OK Member Service Loads Dead Live Snow Windl Wind2 E/1.4 Axial 2,263lb 2,164lb 2,508lb lb lb lb Mx-x ft-lb ft-lb ft-lb ft-lb ft-lb ft-lb My-y ft-lb ft-lb ft-lb ft-lb ft-lb ft-lb V lb lb lb lb lb lb LDF 0.90 1.00 1.15 1.60 1.60 1.60 RB 5.85 5.85 5.85 5.85 5.85 5.85 NDS 3.3 F*b 1,148 1,275 1,466 2,040 2,040 2,040 NDS 3.3 FbEl 9,999 9,999 9,999 9,999 9,999 9,999 NDS 3.3 CL 0.99 0.99 0.99 0.99 0.99 0.99 NDS 3.3 F*c 1,346 1,495 1,719 2,392 2,392 2,392 NDS 3.71 FCE1 514 514 514 514 514 514 NDS 3.71 FCE2 849 849 849 849 849 849 NDS 3.71 Cp 0.35 0.31 0.28 0.20 0.20 0.20 NDS 3.71 -------------------------------- AnalysisResults-------------------------------- Inter - Load Case Axial Mx-x My-y V fc fbz-x fby-y fv F'c/Ft F'bx-x Pby-y F'v action D+L 4,427 0 0 0 281 0 0 0 470 1266 1403 150 0.60 D+S 4,771 0 0 0 303 0 0 0 477 1454 1613 173 0.64 D+0.75(L+5) 5767 0 0 0 366 0 0 0 477 1454 1613 173 0.77 D+0.6*W1 2263 0 0 0 144 0 0 0 488 2015 2244 240 0.29 D+0.6*W2 2263 0 0 0 144 0 0 0 488 2015 2244 240 0.29 D+0.75(L+Wl+S) 4826.5 0 0 0 306 0 0 0 488 2015 2244 240 0.63 D+0.75(L+W2+S) 4826.5 0 0 0 306 0 0 0 488 2015 2244 240 0.63 D+0.75(L+S+E) 5767 0 0 0 366 0 0 0 488 2015 2244 240 0.75 0.6D-.6*Wl 1358 0 0 0 86 0 0 0 488 2015 2244 240 0.18 0.6D-.6*W2 1358 0 0 0 86 0 0 0 488 2015 2244 240 0.18 0.6D-.7E 1358 0 0 0 86 0 0 0 488 2015 2244 240 0.18 printed 11/11/20207:56 PM --,ojectNo: ?? i? b Date: Sheet: �"4 Of: — Project Name: Comp. By: Chk.By: r 2150 N. 107th St., Suite 320 Seattle, WA 98133 Contents: P:206.281.7500 www.PacEngTech.com 5 £el0 FNA A/... ...... Ir+(-q .�.. r..f 'crJd'w�_�' !.PL°-+D,� Ow.5.0aeo iS�..Oer,.✓e : � ,VS� .C1�i�-rrii.y �Uv�'n:✓L �G AND y S�`r4. %✓ !32P`�,NL 7y GN�Al xN� dNL.D 1� r'i;Pr— IN CGdv e— T1J _mars+Et Etf , M v,N fStrt �� _ 3, ZJL3) s7 V yap S- x L_ ✓0, Y _ o � 0s K t� Project No: ?01") A> Date: Sheet: ' y Of: Project Name: Comp. By: Chk.By: FIC P� \r/ ENGINEERING TECHNOLOGIES, INC. j`p 2150 N. 107th St., Suite 320 Seattle, WA 98133 Contents: 9_ P-�)n" i�-)r'' 1"I- 1,, P:206.281.7500 www.PacEngTech.com PrJ�?bi8� ).�Lx It its ZyF-k`f .... pdSTS toNS,Pi2 L2) 2,c E... M'r QL_z ZS3y ��r}T lSE'7.,•.: �l•itli :_ 4L, ILb � � SEfi xrGk7' 1LR lonri lye_ SL 2uSl pn f 4t_sia„ tPl�.v /4;r1i 'f6_ bh'33�'�t/v,� FLOd2 T72 6 p� �L Lyxx +c� Eip NS. P$,C -D EA2„VG Z" M,N.. . PflQiNG SLs is ✓` 4 Ql /W tk pL! �C W� j 1T IOJ� !f fiGVidGM�✓%1 �iLkbw( S/ALE E ow' G Tr2 SL' 2S:t3 i ✓c i . r�o .ls�� P 961, 2Z1-1 (1q 1Pa/Yj-. h= 2�.5'K So C3�. �S •� C��uu-cL... Sol.id� I?LvL)<Y✓� 1�Owr� Frv4,_ a Arc �= A•°rx''0b :F 2— '&0 ib_zi.9 `X Iz_ K L fO LMQJ �4 � - w Lt f ,'ve _ 4lt - 3�4 !p� O y°��Xj•�64 �l��S. .. z ✓dK y(7SP5 ArL ,� ` -: Q�Z�� Timber Beam -Column Design Pacific Engineering White Maple NDS 2012 Edition - Technologies - 20196 I f J s/ 5 Member Identification Column Simple Span Timber Species: Hem -Fir Grade is No. 2 Sawn Lumber 2" to 4" wide Service conditions: Dry service Temperature up to 100 deg F Timber Properties Cm Ct CF Cfo CI Cr Adjusted Properties Fb x-x 850 psi 1.00 1.0 1.30 - 1.00 1.00 F*b x-x = 1,105 psi Fby-y 850 psi 1.00 1.0 1.30 1.15 1.00 1.00 F*by-y= 1,271 psi Ft 525 psi 1.00 1.0 1.30 - 1.00 - Ft= 683 psi Fv 150 psi 1.00 1.0 - - 1.00 - Fv= 150 psi Fc 1,300 psi 1.00 1.0 1.10 - 1.00 - F*c= 1,430 psi E 1,300,000 psi 1.00 1.0 - - 1.00 - E' = 1,300,000 psi Emin 470,000 psi 1.00 1.0 - - 1.00 - E'min = 470,000 psi Member is two 2 by 6 nominal y adjust size -� in in True dimensions 3.00 in 5.50 in Area = 16.50 in 3.00" Sx-x= 15.13 in' Height 8.00 ft Sy-y= 8.25 in' x--- M x lu x-x 8.00 ft `' L!w!* ' Ke x-x = 1.00 -> le 1/d = 17.45 lu y-y 8.00 ft } Ke y-y = 1.00 -> le 2/d = 32.00 Le*d = 2.06 x lu y-y *d = 1088 for major axis bending , Le/d = 32.00 for compression Y Member Service Loads Dead Live Snow Windl Wind2 E/1.4 Axial 2,334 lb 1,267 lb 2,831 lb lb lb lb Mx-x ft-lb ft-lb ft-lb ft-lb ft-lb ft-lb My-y ft-lb ft-lb ft-lb ft-lb ft-lb ft-lb V lb lb lb lb lb Ib LDF 0.90 1.00 1.15 1.60 1.60 1.60 Re 10.99 10.99 10.99 10.99 10.99 10.99 NDS 3.3 F*b 995 1,105 1,271 1,768 1,768 1,768 NDS 3.3 FbEl 4,667 4,667 4,667 4,667 4,667 4,667 NDS 3.3 CL 0.99 0.99 0.98 0.97 0.97 0.97 NDS 3.3 F*c 1,287 1,430 1,645 2,288 2,288 2,288 NDS 3.71 FcE1 1,268 1,268 1,268 1,268 1,268 1,268 NDS 3.71 C2� Zv. FCE2 377 377 377 377 377 377 NDS 3.71 C OY�. CP 0.27 0.25 0.22 0.16 0.16 0.16 NDS 3.712 '(3 ------------------------------ AnalysisResults-------------------------------- Inter - Load Case Axial Mx-x My-y V fc fbx-x fby-y fv F'c/Ft F'bx-x F'by-y F'v action D+L 3,601 0 0 0 218 0 0 0 354 1088 1271 150 0.62 D+S 5,165 0 0 0 313 0 0 0 357 1248 1461 173 0.88 / D+0.75(L+5) 5407.5 0 0 0 328 0 0 0 357 1248 1461 173 0.92 V D+0.6*W1 2334 0 0 0 141 0 0 0 364 1718 2033 240 0.39 D+0.6*W2 2334 0 0 0 141 0 0 0 364 1718 2033 240 0.39 D+0.75(L+W1+S) 4345.9 0 0 0 263 0 0 0 364 1718 2033 240 0.72 D+0.75(L+W2+S) 4345.9 0 0 0 263 0 0 0 364 1718 2033 240 0.72 D+0.75(L+S+E) 5407.5 0 0 0 328 0 0 0 364 1718 2033 240 0.90 0.6D-.6*W1 1400 0 0 0 85 0 0 0 364 1718 2033 240 0.23 0.6D-.6*W2 1400 0 0 0 85 0 0 0 364 1718 2033 240 0.23 0.6D-.7E 1400 0 0 0 85 0 0 0 364 1718 2033 240 0.23 printed 11/10/20203:55 PM Cse a2l)15.5.0,4 Jeff Nbh1a 10-2-20 kmarm�iglne 4.1110.1 \lveiaty D� 153E Center Beam Analysis /-4 �r,y` n 1:16pm �1M Li of I Member Data Description: Member Type: Beam Application: Floor Top Lateral Bracing: Continuous Bottom Lateral Bracing: Continuous Standard Load: Moisture Condition: Dry Building Code: SBC Live Load: 40 PLF Deflection Criteria: U360 live, U240 total 20)a b Dead Load: 10 PLF Deck Connection: Nailed Member Weight: 16.0 PLF Filename: Vehrs Beam2. Other Loads Type Trib. Otifer Dead (Description) Side Begin End Width Start End start End Category Additional Uniform (PLF) Top 0' 0,001, 14' 6.00" 0 80 Live 8' Wall Load Additional Uniform (PLF) Top a 0.001, 14' 6.00" 450 270 Snow 36'TribtutaryTrum Load Replacement Uniform (PLF) Top 0' 0.001, 14' 6.00" 190 48 Live Srancanned 9'0.04"ample span O 1460 0 14 6 0 Bearings and Reactions input Min Gravity Gravity Location Type Material Length Required Reaction Uplift 1 0' 0.000" Wall HF End -Grain (797psi) 3.500" 1.757" 6282# - 2 14' 6.000" Wall HF End drain 97 si 3.500" 1.757" 6282# - Maximum Load Case Reactions Us Icrq)l B � 1u li%4 110 rrryv9mantas Live Snow Dead 1 1336# 3164# 2907# 2 1336# 31644 2907# Design spans 14' 0 750' Product: 24F-V4` DF/DF 5.500 x 12.000 PASSES DESIGN CHECKS Design assumes continuous lateral bracing along the top chord. Design assumes continuous lateral bracing along the bottom chord. Allowable Stress Design Actual Allowable Capacity Location Loading Positive Moment 22087.'4 30360.'# 72% 7.25' Total Load D+0.75(L+S) Shear 5389.# 13409.# 40% 0.23' Total Load D+O. Max. Reaction 6282.# 12512.# 500/6 0' Total Load D+O. LL Deflection 0.2963" 0.4688" U569 7.25' Total Load 0.75 TL Deflection 0.5515" 0.7031" U305 7.25' Total Load D+O. Control: TL Defedion DOLs: Live=hrrr SRONk115%Roof=125%Wind=160% This member has been designed in aoordanoe Wth NDS 2005 a � rmm¢arelm4a15 a 1n5, r�mmew=es Cgryrgv (C) 2H5Ly 5in{en9mpT'e Can(vry Im NL RIGHTS RESERVE➢. ^r reps ��rey®wm lre mania, lax i�rt®n agr�srmmlrena+4gmms aplf�rEadwlleia lolffis,lmirg cOtlllnB. am $HB IymmO[9] xTreaainmw rerc«mvrlM aamil�l devlcra a, 'gym lu wd.1m �rsiaua��o-a io lre mavxlvas rra�ar:. Project No: ?4 1`1 f Date: Sheet: _LL Of: Project Name: Comp. By: S Chk.By: Contents: L0 K PACIFIC ftwO ENGINEERING TECHNOLOGIES, INC. 2150 N. 107th St., Suite 320 Seattle, WA 98133 P:206.281.7500 www.PacEngTech.com ZK.r /�77✓�` 3'1i4i o/(1vt :. SL : P C //SF - - _... TL-S'd FL 1= d7s � � I � ��s ..Q�563 ✓�JY _ S: 20, g,:,, H 4, -tom � ��. � . �. (2� � C2a, /J bt AIQc(c