APPROVED BLD BLD2021-0740+Structural_Analysis_or_Calculations+6.3.2021_2.20.30_PM+2230906RECEIVED
Jun 03 2021
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Structural Calculations For:
Salish Crossing
Outdoor Deck #1
150 Sunset Ave S, Suite #184
Edmonds, WA 98020
Prepared for: Salish Crossing TIC
Job #: 00005-2013-05-14
Date: June 3, 2021
CITY OF EDMONDS
BUILDING DIVISION
APPROVED PLAN
Erica Ca,rfe-r 6-9-2021
BLD2021-0740
APPROVED
PLANS MUST BE
ON JOB SITE
SEATTLE 2124 Third Ave, Suite 100, Seattle, WA 98121 0 206-443-6212 ssfengineers-com
Ic»WHme MG TACOMA 934 Broadway, Suite 100, Tacoma, WA 98402 0 253,284,9470
xx
to
N r t-
x v`
�t
I`
2--25 `4-
G clL T—A
L-v y> 6, fir
FLU; vsr=
—
PRO.JECT DATE
PROS. #
DESIGN
1
SHEET
w
a
'a
0
0
z
bq k
a \�l
Y �
ht
(d ..
PROIECf DATE
pol#
DESIGN
Z
SHEET
Top Rail Bi
HF
8 x4
50 pit
R=!
225 �lbs
tI-n
�
410'pi s
1300!
- - ---- ksi--
22] in
C�
Cv= <1.0
1/11
493;
W
-
- - - - - - - - - - - - - J
Bench Rails
82
HF 4 x 8
236!plf
R 1,062 Ibs
_4
L=
M= 2,390 ;ft-lbs
------------
'psi
iin
Fv= 54 psi
30Oksi
0=1 0.2411n
Gv=
1.00s1.0
W
t
+
Project: SPUD Deck Handrail
SFATME 2124 Third Ave, Suite 100, Seatt;e, WA 98121
TACOMA 934 Broadway, Suite 100, Tacoma, WA 98402
w 3sfenqineers.com
offila: 206,443.6212
Fax. 206.443.4870
Date: 01/25/16
Project #:
Design: RJA
Sheet: —3
PROVIDE (2) 1/2" DIA KWIK
BOLT EXPANSION ANCHORS
w/ 2" SQ x 1/4" PLATE
WASHERS @ Yoc VERT
PEELED POLE TO (E) CONC
(4" EMB). TYP (3) LOCATIONS.
DECKING SPAN
DIRECTION
DECKING AND RIPPED P.T.
—/
2x SLEEPERS PER ARCH.
NOTCH POLE 1-1/2" @ SIDEWALK.
PROVIDE STEEL PLATE AND
ANCHORAGE TO FACE OF
SIDEWALK PER SECTION B.
7t
Co
CO
i
EXISTING 1 NEW DECK AREA
PLANTER
-------------------�._�------------�0
PROVIDE FULL DEPTH
4x BLKG x FULL DECK N
WIDTH w/ CONT. CS16
STRAP ABOVE (BELOW co
DECKING). � � CH I Co
8'-2 3A �. 8'-2 3/4" / 4
PROVIDE 4x RIPPED P.T.
SLEEPERS @ PEELED
POLE LOCATIONS.
DECK FRAMING PLAN
scale: 1/4" = V-0"
DTT2Z CENTERED
ON PEELED POLE
TO CONT. 4x
SLEEPER OR BLKG
PER SECTION A.
TYP (3) LOCATIONS.
LTS
'/ (4)
S
AM
SIDS SCREWS @ 4"oc W/
PENETRATION.
SECTION A
NTS
Salish Crossing
PROJECT
DA'r E
PFtOJ. �
DESIGN
SHEET
J
F
Lt.
0
N
z
LU
t�