Permit Issuance Instructions,Ile. 1 8yl
CITY OF EDMONDS
121 5T" AVENUE NORTH • EDMONDS, WA 98020 • 425.771.0220 • Website: www.edmondswa.gov
DEVELOPMENT SERVICES DEPARTMENT
Planning • Building • Engineering • Fire
Your permit is issued!
Read below to find out what is next
First- Please print your Issued Permit, Inspection Card, and Approved
Documents that have been uploaded. Plans must be printed and in original
size. They may be larger than your home printer is able to accommodate. Most
local copy and print stores can print the most common 24 x 36 size.
These must be kept at the project site and made available for inspections.
Then- Review your documents
• Read the permit conditions on the Issued permit
• Review your Inspection Card. If there is a "Preconstruction
Meeting" listed then you will need to schedule the inspection prior
to beginning work
• Review the approved documents and plans for comments from City staff
To schedule an inspection
• Go to https://mVbuildingpermit.com/ Select "Schedule Inspections"
• Search by jurisdiction and permit number
Inspections can be scheduled for any of the next 5 business days
We cannot provide a specific time that the inspection will occur during the day.
Inspections are between AM (8:00 — Noon) or PM (Noon to 3:00).
Please note we cannot guarantee AM, PM or a specific time.
To see the results of your inspection
• Go to https://mybuildingpermit.com/
• Select "Check Status" and enter your permit information.
Information will be within the drop -down box marked "inspections"
• Incorporated August 11, 1890 •
Sister City - Hekinan, Japan