Loading...
Building Permit 2021Type: MECHANICAL Subtype: RESIDENTIAL MECHANICAL I Status: ISSUED Parcel No: 27032500211200 Subdivision: LLA 97-37 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 902 6TH AVE S EDMONDS,WA 98020-4010 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MECHANICAL -AIR CONDITIONER ADD ON Applied: 7/12/2021 Issued:7/12/2021 Final: Expiration Date:1/8/2022 Issued by: NED WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JOSEPH XAYAMOUANGBO 14148 NE 190TH ST, (800)840-3346 JXAYAMOUANGBO@BOBSHEATING.0 WOODINVILLE WA 98072 OM CONTACT BOB'S HEATING 14148 NE 190TH ST, (800)840-3346 jxayamouangbo@bobsheating.com WOODINVILLE WA 98072 BOB'S HEATING &AIR 14148 NE 190TH ST, CONTRACTOR (800)840-3346 jxayamouangbo@bobsheating.com CNDTNG LLC WOODINVILLE WA 98072 902 6TH AVE S, EDMONDS WA OWNER MARY FRAN JOSEPH 98020 •' IRIM DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 7/12/21 R13465 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 7/12/21 R13465 PUMP - 1.75 BTU OR LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/12/21 R13465 PER PERMIT TOTALS: $140.00 $140.00 CONDITION TYPE STATUS I NOTES Printed: Monday, July 12, 2021 2:43:09 PM 1 of 2 MECHANICAL Permit City of Edmonds PERMIT NUM Edmonds WA 98020 i , ' ' • • • • • 1 1 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. ' •NS - Schedule •https://Inspection.MvBuildingPermit.com COMPLETED SEQID INSPECTION TYPE INSPECTOR DATE X-0 MECH FINAL" B-3 GAS PIPING TEST B-3 MECH ROUGH IN Printed: Monday, July 12, 2021 2:43:09 PM 2 of 2