Building Permit 2021Type: MECHANICAL Subtype: RESIDENTIAL MECHANICAL I Status: ISSUED
Parcel No: 27032500211200
Subdivision: LLA 97-37
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 902 6TH AVE S EDMONDS,WA 98020-4010
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: MECHANICAL -AIR CONDITIONER ADD ON
Applied: 7/12/2021
Issued:7/12/2021
Final:
Expiration Date:1/8/2022
Issued by: NED
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JOSEPH XAYAMOUANGBO
14148 NE 190TH ST,
(800)840-3346
JXAYAMOUANGBO@BOBSHEATING.0
WOODINVILLE WA 98072
OM
CONTACT
BOB'S HEATING
14148 NE 190TH ST,
(800)840-3346
jxayamouangbo@bobsheating.com
WOODINVILLE WA 98072
BOB'S HEATING
&AIR
14148 NE 190TH ST,
CONTRACTOR
(800)840-3346
jxayamouangbo@bobsheating.com
CNDTNG LLC
WOODINVILLE WA 98072
902 6TH AVE S, EDMONDS WA
OWNER
MARY FRAN JOSEPH
98020
•' IRIM
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
7/12/21
R13465
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
7/12/21
R13465
PUMP - 1.75 BTU OR LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
7/12/21
R13465
PER PERMIT
TOTALS: $140.00
$140.00
CONDITION TYPE
STATUS I
NOTES
Printed: Monday, July 12, 2021 2:43:09 PM 1 of 2
MECHANICAL
Permit
City of Edmonds PERMIT NUM
Edmonds WA 98020 i , ' ' • •
• • • 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
' •NS
- Schedule •https://Inspection.MvBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
DATE
X-0 MECH FINAL"
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
Printed: Monday, July 12, 2021 2:43:09 PM 2 of 2