Building Permit 2021Type: ESLHA PERMITS Subtype: ESLHA RETAINING WALL I Status: ISSUED
Parcel No: 00513102901100 Site Address: 16000 75TH PL W EDMONDS,WA 98026-4524 Applied: 6/17/2020
Subdivision: 005131 Lot: 0 Issued: 7/13/2021
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 9/13/2021
Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: FLOREZ- DEMO RETAINING WALL AND STAIRS IN ESLHA **COD**
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JORGE FLOREZ
16000 75TH PL W, EDMONDS
(425)750-5803
GIRALDOTATIANA77@YAHOO.COM
WA 98026
CONTACT
JORGE FLOREZ
16000 75TH PL W, EDMONDS
(425)750-5803
giraldotatiana77@yahoo.com
WA 98026
CONTRACTOR
OWNER
16000 75TH PL W, EDMONDS
OWNER
JORGE A FLOREZ
WA 98026-4524
INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT#
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/18/20
R5830
PER PERMIT
DEMO - SUB RES BLDG PERMIT FEE
001.000.322.10.000.00
$100.00
$100.00
6/18/20
R5830
DEMO - SUB RES BLDG PLAN
001.000.345.83.000.00
$50.00
$50.00
6/18/20
R5830
REVIEW FEE
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$330.00
$330.00
7/13/21
R13468
ESLHA MINOR PROJECT
001.000.322.10.000.00
$300.00
$300.00
6/18/20
R5830
ADMINISTRATIVE PROCESSING FEE
PLANNING FEE NOT CATEGORIZED
001.000.345.81.000.00
$110.00
$110.00
7/13/21
R13468
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
6/18/20
R5830
VIOLATION COMPLIANCE FEE
001.000.353.70.000.00
$5,300.00
$5,300.00
7/13/21
R13468
TOTALS:
$6,236.50
$6,236.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, July 13, 2021 9:11:23 AM 1 of 3
ESLHA
PERMITS Permit
City of Edmonds PERMIT NUM
www.edmondswa.gov1
1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
Work under this permit must be completed and approved by the City within 60 days after
BUILDING OTHER
O
obtaining the permit, which effectively is September 13, 2021. For reference see Issuance
INFORMATION
Letter from Building Official.
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
As required by Ord 3632 the geotechnical engineer of record shall monitor this site during
construction for compliance with the recommendations in the geotechnical report
including site excavation, shoring, soil support for foundation, including piles, soil bearing
capacity, sub drainage installation, soil compactions, and other geotechnical aspects of
the construction. Specific recommendations contained in the approved geotechnical
report must be implemented by the owner. The geotechnical engineer shall make
written dated reports on the progress of the construction and submit the report to the
City on a weekly basis until all site grading, drainage, foundation and associated ground
work is complete. Omissions or deviations from the approved geotechnical report and or
approved plans or specs shall be highlighted and immediately submitted in a separate
letter to the City for review. The City shall be advised in writing of work stoppages of
FOR
more than one week. In addition to the geotechnical monitoring special inspections
ESLHA REPORTS
INFORMATION
based on the provisions of IBC Section 1704 are required when specified. Other special
inspections may also be required by the geotechnical engineer, architect, or structural
engineer of record. At the completion of final site grading and all permitted structures a
final geo technical report prepared by the geotechnical engineer shall be submitted to
the City. This report shall contain a statement that, based upon his/her professional
opinion, site observations, and testing during the monitoring of the construction, the
completed development substantially complies with the recommendations in the
geotechnical report and with all geotechnical related requirements. Any deviations or
omissions in the report, plans, or specifications that occurred during construction shall be
addressed separately. Occupancy, final approval, or release of the bond for the project
shall not be granted until the report has been reviewed and accepted by the Building
Official.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
Printed: Tuesday, July 13, 2021 9:11:23 AM 2 of 3
ESLHA
PERMITS Permit
City of • • •
hLWI
ww.edmondswa.gov1 1
M
The issuance of this permit in no way constitutes approval from any other agencies
FOR
REGULATING AGENCIES
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
FOR
SPECIAL INSPECTION REPORTS
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
INSPECTIONS
- Schedule
Online
at: httr)s://Inspection.MvBuildingPermit.com
COMPLETED
RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-5 BLDG SPECIAL
INSPECTION
B-7 BLDG SITE INSPECTION
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
X-1 PLANNING FINAL
Printed: Tuesday, July 13, 2021 9:11:23 AM 3 of 3