Loading...
Building Permit 2021Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 00461000100101 Site Address: 21616 76TH AVE W 102 EDMONDS,WA 98026-7512 Applied: 5/24/2021 Subdivision: 005295, 004610, 008167, 010330 Lot: 0 Issued: 7/15/2021 Fire Sprinklers: No Lot Area: Zoning: Final: Valuation: $207,625.00 Occupancy Type: B Construction Type: VA Expiration Date: 7/10/2022 Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: MTI PHYSICAL THERAPY- INTERIOR RENOVATIONS Plumbing incl WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DAVID SOVA 16915 SE 272ND STREET, (206)617-9010 DAVID@DSDAA.COM COVINGTON WA 98042 CONTACT ARCHITECT DAVID SOVA 16915 SE 272ND STREET, (206)617-9010 david@dsdaa.com COVINGTON WA 98042 CONTRACTOR CONTRACTOR UNKNOWN HR ACQUISITION I 3310 WEST END AVE, OWNER CORPORATION NASHVILLE TN 37203 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 7/7/21 R13365 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/25/21 R12556 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 7/7/21 R13365 EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $105.00 $105.00 7/7/21 R13365 TRAP PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $2,077.60 $2,077.60 7/7/21 R13365 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $1,765.96 $1,765.96 5/25/21 R12556 TOTALS: $4,063.56 $4,063.56 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, July 15, 2021 10:51:16 PM 1 of 2 •M MERCIAL BLDG Permit IF City of Edmonds PERMIT NUM 121 5th Ave N, Edmonds WA 98020 BLE12021-6908 www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS•• •nline at: https://Inspection.MyBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE A-1 BUILDING PRECON B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL** Printed: Thursday, July 15, 2021 10:51:16 PM 2 of 2