Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ENG2021-0253 ROW PERMIT
OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds AveRIGHT N, Edmonds WA 98020ENG2021-0253 www.cityofedmonds.gov Description: COMCAST-TIE IN AT POLE & RISER DOWN, PROOF & PULL CATV ISSUED: 07/20/2021 Address: 550 MAIN ST EDMONDS WA 98020-3183 EXPIRES: 01/20/2022 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434212001500 NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR Cablecom LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)668-1300 OWNER SEATTLE-SNOHOMISH MILL 9525 AIRPORT WAY, SNOHOMISH WA 98296 COMPANY INC FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 07/20/2021 RELEASED BY DATE Printed: Tuesday, July 20, 2021 10:00:20 AM 1 of 2 -KRWOF WAY EUC PERMIT ER City of • • • •:• •ENG2021-0253 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Tuesday, July 20, 2021 10:00:20 AM 2 of 2 ENG2021-0253 �/0 of EOkjoIV RIGHT OF WAY CONSTRUCTION RECEIVED PERMIT APPLICATION JUL 08 2021 Complete and submit this Application in accordance with the Submittal INC. isa° Requirements outlined in Right-of-WayDEVELOPMENT permit Handout E63. CEPMONDs DEPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name GF 550 Main St - Edmonds - Phase 1 - C - ROW Site Address or if no site address use Property Address at NW corner of project area: 550 MAIN ST. Associated Permits: BLD PLN ENG Owner and Entity Holding•• • Name of Company COMCAST CABLE HOLDINGS Franchise Ordinance No: Point of Contact JOURDEN LAWRENCE Title PERMIT COORDINATOR Address 1525 75TH ST SW City EVERETT State WA Zip 98203 Phone 425-921-8201 Email Jourden Lawrence comcast.com Contractor and Authorized ent of Owner (see note below) Contractor Contacts During Construction Name of Company CABLECOM.LLC Primary Name CABLECOM LLC - BRENT DIXON Agent Name Pauni Vaimili Title CONTRUCTION SUPERVISOR Title PERMIT COORDINATOR Mobile 425-870-4407 Address 20021 120th Ave NE Suite 101 Email brent.dixon@cablecomllc.net City BOTHELL State WA Zip 98011 Secondary Name Phone 360-312-3259 Title Email snohomish.permitting@cablecomlIc.net Mobile City of Edmonds Business License No: N R - 021818 Email State License No: CABLEL*971 DP V Contractor verifies it is currently bonded u/ Contractor verifies it currently has general liability insurance NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) ls4Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) AT POLE LOCATED NEAR 547 DAYTON ST. TIE IN & RISER DOWN APPROX. 25'. PROOF & PULL APPROX. 20' CATV NORTH & CONTINUE WORK ON TO PRIVATE PRO PERTY.JB0000700800 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 2 hours + LF x LF SF Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: : ❑ telecommunications cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. of Work to be Completed Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility stem? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additional poles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: i"nnDATE: 06/29/2021 APPLICANT PRINTED NAME: Pauni Vaimili APPLICANT TITLE: Permit Coordinator NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 I 20 120 b i 4 MAIN ST TEMPORARY TRAFFIC CONTROL PLAN Nb -----------p i ! t MAIN ST ' C r I 10 �A311W I W RESIDENT(S) WILL BE INFORMED E,� , BY CUSTOMER OUTREACH OF ROAD rllli ' I = CLOSURE 10 DAYS IN ADVANCE. � � Ji': I �!' ��� 13� 20 t 20 120 ALLEY I® ® ALLEY I �gp CREW SHALL SHIFT CONES AND I j 12 EQUIPMENT FOR EMERGENCY I $ it VEHICLES ACCESS i tta Notes: i a 1. All signs and spacing to conform to the MUTCD and City of Edmonds standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. CHANNELIZATION DEVICE SPACING MPH TAPER TANGENT 59 40 L 80 35 5 30 60 25 0 20 20 40 - Rb ------ LU Q Use traffic drums (barrels) with steady burning - POLICE AND FIRE SHALL BE NOTIFIED OF Type C lights on all State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall ALLEY CLOSURE A MINIMUM OF 48 HOURS not truct pedestrian PRIOR TO CLOSURE 5.Cre isrequiredtoleavess. 5. Crew is required to leave a minimum of 11' for traveling lane width. - COORDINATE ALLEY CLOSURE WITH TRASH 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m HAULERS unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m 8. Work area will be 4' South of CL Alley 8 223' West of CL 7th Ave S. 9. If used, place NO -PARK signs 72 hours in advance of the day that thevow is to De .silall repair/replace all damage to OWNER/CONTRACTOR IS RESPONSIBLE ronseve improvements in City FOR EROSION CONTROL. AND DRAINAGE Y per o4 standards that is caused 4I W1~4 +1I vet rtni++nrl .,r..in..+ LEGEND ® 28"TRAFFIC CONE ® WORK PIT TRAFFIC FLOW WORKVEHICLEI FlASHING LIGHTS SIGN LOCATION RIGHT OF WAY Row 61NIGINIEEHiNG iDIVISIOIN,! A P OVED AS !�i0 iJ i Date: kl 4o /t' DZ:I3 ZOZ/6 1,/LO IRi 3 NMO AS B U I L D COVER Completed By: John Novelli N '•. ` _.� j S Completion Date: 6/25/2021 Address: 550 Main St Edmonds WA 98020 COMCAST Survey Revision Date: SurveyN. Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab. Engineered For: Project Manager: Are Additional Pages Needed: No P2 ID: JB0000700800 Legend C, y .� T New Ped ❑ Pole New Vault ❑v Existing U/G Lock Box l � Existing Aerial Footage Text Box 150' Text _ Z =— New U/G New Aerial--� Interior Path Callout Arrow New Tap 0 s', - .. __ _ _- __- __ _ as`' v Daley St - Z. c> aLL E I — otd St _.� I I I ,— Footage Break Phase Identifier Sprague st ,a _ Fiber Splice Point Power Supply pp Y Hard Surface Cut Ps O a IL st,r,yuo St � Storage Loop Riser ® Abandoned Cable �• PG h "' M'/ �/ — — :Bun I -,E1 �IIIjI �j—j Z St '°° r Edmonds a' I ! BNI.st 1— St srl i !E"" Provide Clear Construction Details AT POLE LOCATED NEAR 547 DAYTON ST. TIE IN & RISER DOWN APPROX. 25'. PROOF &PULL APPROX. 20' CATV NORTH & CONTINUE WORK ON TO PRIVATE PROPERTY.��-- a E Main St EE Main _ `r— ED =7-77 v � Dayton st r 0 I I DE El J� , I F II -. _ ,—T M�Pie w,y . I�L� Mao* St I^ FT RECEIVED l --I J U L 08 2021 - S` CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT _ � [ ���� -�,-, Walnut � 5t LEI IELT—= Walnut St1 r OVERVIEW Completed By: John Novelli N ` S Completion Date: 6/25/2021 Address: 550 Main St Edmonds WA 98020 COMCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab. Engineered For: Project Manager: Are Additional Pages Needed: No P2 ID: JB0000700800 Pole Legend NewPed ❑ New Vault ❑v Lock Box • Existing U/G Footage 150' Existing Aerial Text Box Text New U/G Callout Arrow New Aerial--� New Tap A Interior Path Footage Break Phase Identifier 0 Fiber Splice Point Power Supply Storage Loop Hard Surface Cut O Riser ® Abandoned Cable Provide Clear Construction Details AT POLE LOCATED NEAR 547 DAYTON ST. TIE IN & RISER DOWN APPROX. 25'. PROOF & PULL APPROX. 20' CATV NORTH & CONTINUE WORK ON TO PRIVATE PROPERTY. RECEIVED JUL 08 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT , w MA, DETAIL Completed By: John Novelli Address: 550 Main St Edmonds WA 98020 Completion Date: 6/25/2021 Right of Way Footages: IProject COMCAST Survey Revision Date: New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 25 Existing UG Coax: 30 0 Are Additional Pages Needed: No Survey Revision Task ID: Engineered For: Manager: P2 ID: JB0000700800 DETAIL 2 Completed By: John Novelli Address: 550 Main St Edmonds WA 98020 Completion Date: 6/25/2021 Private Exterior Footages: COMCAST Survey Revision Date: New Aerial Coax: 0 Overlash Coax: 0 New UG Fiber: 0 New Aerial Fiber: 0 Overlash Fiber: 0 Existing UG Fiber: 0 Empty Conduit Only: 0 New UG Coax: 0 Existing UG Coax: 0 Are Additional Pages Needed: No Survey Revision Task ID: Engineered For: Project Manager: P2 ID: JB0000700800 DATE TECH ENG � 425.327.6404 61 \��%����/ /�^. �\ ORIGINAL 07/14/21 CS AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 550 MAIN ST. com ca st L/ \J O REV #0 - - _ CABLECOM ENGINEER CHRIS ATKINSON 360.926.3437 EDMONDS WA 98020 T I COVER SHEET E N G 1 N E E R I N G Know what's below. REVIEWED ---- ---- -- CHRIS.ATKINSON@CABLECOMLLC.NET Call before you dl9. AS -BUILT ---- --- CONTACTS ADDRESS: 550 MAIN ST., EDMON DS, WA 98020 CHRISATKINSON SUPERVISOR CABLECOM CHRIS.ATKINSON@CABLECOMLLC.NET PROJECT NAME: J B0000700800 360.926.3437 AARON DIEDRICHS ENGINEER MANAGER , / '. WAECO ENGINEERING VICINITY MAP ;_ AARONWAECOCONSTRUCTION.COM \1 1 F 425.327. 404 o Edmonds ,\ ` l`�/•:•, THE-6 O W L Clly of Lynnwood® OT ED MOWDS �' . Municipal G°Il Course _ -- J ' SITE INDEX 90, ' - • i ` :�� 1 - COVER SHEET/SITE LOCATION / 550 Me n51 o / •Edm°ad:.wAneozo y 1 3 GENERAL NOTES SE - _ �+ / tl fi --at�� - - `. J .�+ 2 -LEGEND r°:r aarx Ea d u' °dwayQ v1M „ _ t — 4 - DESIGN VIEW 1 9°s`°°° ' ^a•� 5 - SITE PHOTOGRAPHS — EEam°aa:camp°:© _ • �•, �, - ir woo dw y x a e F �i IQ Espera AT — _-- - - WESTGE eAm r.r+� SCOPE OF WORK: 4 fill ♦ TIE INTO EXISTING SPLICE CASE LOCATED AT R 1 EXISTING UTILITY POLE NEAR 550 MAIN ST. SHERWOOD �i Y .. �� PULL (11) CAN CABLE DOWN RISER AND THEN tr; 4V , �. ♦ PROOF AND PULL CABLE NORTH. CONTINUE r l _ WORK IN PRIVATE PROPERTY. fit. Ix �.� • • ' SHEET 4 � : - � `^ '---• t r..V2�Fw Pq ! u IV D •� � ,� '� ! to � - �� •' ` �+'--•'►� t' - _ Mir - ' m- RECEIVED . a q JUL 08 2021 SITE LOCATION �IPROPRIETARY - NOT FOR DISTRIBUTION11 CLIENT FIRMCABLECOMw clwlrvrzr_rclrv� PROJECT NUMBER: JB0000700800 I PERMIT NUMBER- 7 ---- DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\SUILT\21588 EDMONDS MAINST JB0000700800\ENG PRINTS-21\CAD FILES\JB0000700800 CONSTRUCTION PLANS.DWG CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SHEET # I 1 OF 5 DATE TECH ENG 425.327.6404 ORIGINAL 07/14/21 CS AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 550 MAIN ST. Comcast C� � CEO REV #0 ____ ____ 360.926.3437 LEGEND CableCom E N G I N E E R I N G Know what's below. REVIEWED - CABLECOM ENGINEER CHRIS ATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020 Call before you dig. AS -BUILT ---- ---- ---- LI N E YP L S ® RISER PB PULBOX - PROPOSED CONDUIT - EXISTING IN: 0 CONDUIT -PROPOSED #F OUT: 0 SEQUENTIAL CALLOUT BORE PIT O A AERIAL FIBER - EXISTING C><c STORAGE - EXISTING A AERIAL FIBER - PROPOSED A AERIAL FIBER - OVERLASH `,i PHOTO MARKER R /W RIGHT OF WAY PARCEL BOUNDARY CATCH BASIN/INLET CURB E 0 P EDGE OF PAVEMENT XOX FIRE HYDRANT x FENCE G GAS W WATER III GROUND/BOND T TELEPHONE E ELECTRIC STREET LIGHT POST SEW SANITARY SEWER (SEW) i SD STORM DRAIN STREET LIGHT TV CABLE TV S TM STEAM O I L OIL C- TRAFFIC ARM/STOP LIGHT U N K UNKNOWN UTILITY F/O FIBER OPTIC 0 TREE TE L TELECOMMUNICATIONS STA. 1 +00 - - STATION LINE BUSH HEDGE SYMBOL DESCRIPTION HDPE HIGH DENSITY POLYETHYLENE O MISC. UTILITY HH HANDHOLE JB JUNCTION BOX UTILITY POLE - EXISTING MH MANHOLE MP MILE POST POLE - PROPOSED PVC POLY VINYL CHLORIDE RGS RIGID GALVANIZED STEEL CONDUIT 0 VAULT - EXISTING ROW RIGHT OF WAY STA. STATION [_V] VAULT - PROPOSED PD-## PEDESTAL -NUMBER VT-## VAULT -NUMBER © PEDESTAL - EXISTING UP-## UTILITY POLE -NUMBER O #F 1 IN: 11 TAIL: 0 SEQUENTIAL IN TAIL CALLOUT �� STORAGE - PROPOSED POLE ANCHOR/DOWN GUY - EXISTING TAIL: 0 #F OUT: 0 SEQUENTIAL TAIL OUT CALLOUT POLE ANCHOR/DOWN GUY - PROPOSED OLE OWNER NAME OLE NUMBER DDITIONAL POLE TAG iPROP TAG NUMBER TAG NUMBER POLE TABLE/ ATTACHMENT CALLOUT TILITY1 xkx" unurc ---►� PROPOSED DOWN GUY ON EXISTING ANCHOR GRAVEL/ ROCK WALL PB PULLBOX — EXISTING ° a a ° SIDEWALK FDP FIBER DISTRIBUTION PANEL — EXISTING FDP FIBER DISTRIBUTION PANEL — PROPOSED BRICK ►� SPLICE POINT — EXISTING r r r r WATER ►� SPLICE POINT — PROPOSED \ \ \ \ CONCRETE RESTORATION \ UTILITY CONTINUES ASPHALT RESTORATION UTILITY ENDS RECEIVED ASPHALT OVER PCC RESTORATION J U L 08 2021 1 JLANDSCAPE RESTORATION CITY OF EDMONDS ❑F PEDESTAL - PROPOSED DEVELOPMENT SERVICES DEPARTMENT PROPRIETARY - NOT FOR DISTRIBUTION ENGINEERING FIRM: WAECO ENGINEERING CLIENT FIRM: CABLECOM PROJECT NUMBER: JB0000700800 I PERMIT NUMBER: ---- DRAWING NAME: G:\SHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOMERS\CABLECOM\BUILT\21588 EDMONDS MAINST JB0000700800\ENG PRINTS-21\CAD FILES\JB0000700800 CONSTRUCTION PLANS.DWG SHEET # I 2 OF 5 DATE TECH ENG 425.327.6404 ORIGINAL 07/14/21 CS AJD WAECO ENGINEER AARON DIEDRICHS AARON WAECOCONSTRUCTION.COM O 550 MAIN ST. Comcast �/ O REV #0 ____ ____ ____ 360.926.3437 GENERAL NOTES rmie...Um ENGINEERING Know what's below. REVIEWED CABLECOMENGINEER CHRISATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020 Call before youdlg. AS -BUILT ---- ---- ---- 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: ---- CURRENT INTERNATIONAL BUILDING CODE (IBC) ---- 2016 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION ---- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION SYSTEM. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO JEFF.KOBLYK@EDMONDSWA.GOV. BACKFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY THEREAFTER. 22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE RECEIVED WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER J U L 08 2021 THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT (PROPRIETARY - NOT FOR DISTRIBUTION PROJECT NUMBER: JB0000700800 I PERMIT NUMBER: ---- SHEET # I 3 OF 5 co m ca st O able om E N G I N E E R I N G QAORIGINAL Know what's below. DATE TECH ENG WAECO ENGINEER AARON DIEDRICHS 425.327.6404 AARON@WAECOCONSTRUCTION.COM O SSO MAIN ST. EDMONDS WA 98020 r f1 PROJECT SHEET 07/14/21 CS AJD REV #0 ---- 360.926.3437 CHRIS.ATKINSON@CABLECOMLLC.NET REVIEWED ---- ---- -- _ CABLECOM ENGINEER CHRIS ATKINSON Call before you dlg. AS -BUILT ---- ---- ---- O O O N � N 0 Z � Q O � O pp J N W U a R —R/W El 00434212001500 550 MAIN ST CONTINUE WORK IN PRIVATE PROPERTY 0 a PARCEL# 00434212002400 547 DAYTON ST N 09 CONSTRUCTION NOTES TIE INTO EXISTING SPLICE CASE NEAR EXISTING UTILITY POLE. 2O FROM SPLICE CASE, PULL (1) NEW CAN CABLE DOWN RISER. O3 EXISTING COMCAST CONDUIT. PROOF CONDUIT PRIOR TO CONSTRUCTION AND PULL (1) CAN CABLE THROUGH. SYMBOL CORRESPONDS TO PHOTO LOCATIONS AND ORIENTATION. �� PARCEL# 00434212002800 RECEIVED 533 DAYTON ST PARCEL# 00434212002600 PARCEL# 00434212002100 J U L 08 2021 543 DAYTON ST 555 DAYTON ST CITY OF EDMONDS / DEVELOPMENT SERVICES DEPARTMENT PROPRIETARY -NOT FOR DISTRIBUTION11 ENGINEERING FIRM: WAECO ENGINEERING PROJECT NUMBER: JB0000700800 PERMIT NUMBER: ----� CLIENT FIRM: CABLECOM SHEET # 4 OF 5 DRAWING NAME: GASHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\SUILT\21588_EDMONDS MAINST JB0000700800\ENG PRINTS-21\CAD FILES\JB0000700800 CONSTRUCTION_PLANS.DWG -CALL " " 20' (comcast � � 0 DATE TECH ENG WgECO ENGINEER AARON DIEDRICHS 425.327.6404 AARON@WAECOCONSTRUCTION.COM O 550 MAIN ST., SITE GREVIGI 07/--- CS AJD REV #0 #0 360.926.3437 REVIEWED _ CABLECOM ENGINEER _ able um ENGINEERING Know what's below. CHRIS ATKINSON CHRIS.ATKINSON@CABLECOMLLC.NET EDMONDS, WA 98020 PHOTOGRAPHS AS -BUILT ---- ---- ---- Call before you dlg. CONSTRUCTION NOTES TIE INTO EXISTING SPLICE CASE NEAR EXISTING UTILITY POLE. FROM SPLICE CASE, PULL (1) NEW CAN CABLE DOWN RISER. EXISTING COMCAST CONDUIT. PROOF CONDUIT PRIOR TO CONSTRUCTION AND PULL (1) CAN CABLE THROUGH. i ' I -, lY RECEIVED J U L 08 2021 II II i! !1_JIII/f JJ �IIII// CITY OF MONDS V LI Lf� 1JL'7Lul L��Ji� DEVELOPMENT FACING WEST FROM THE NORTH SIDE OF PARCEL 00434212002400 SERVICES DEPARTMENT PROPRIETARY - NOT FOR DISTRIBUTION11 ENGINEERING FIRM: WAECO ENGINEERING PROJECT NUMBER: JB0000700800 PERMIT NUMBER: ---- SHEET # 5 OF 5 CLIENT FIRM: CABLECOM DRAWING NAME: GASHARED DRIVES\WAECO ENGINEERING SERVER\2021\1 - CUSTOM ERS\CABLECOM\SUILT\21588 EDMONDS MAINST JB0000700800\ENG PRINTS-21\CAD FILES\JB0000700800 CONSTRUCTION PLANS.DWG