Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ENG2021-0254 ROW PERMIT
RIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds ...0i 1 1 � www.cityofedmonds.gov Description: COMCAST-INSTALL 2" CONDUIT FROM SITE TO PED ISSUED: 07/20/2021 Address: 714 ALDER ST EDMONDS WA 98020-3416 EXPIRES: 01/20/2022 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00434209100900 I 11-14111 a i NAME TYPE NAME ADDRESS PHONE APPLICANT COMCAST 1525 75TH ST SW, EVERETT WA 98203 (425)921-8201 CONTRACTOR SOUND DRILLING LLC , SEDRO WOOLLEY WA 98284-8309 (425)244-2303 OWNER BEZUG JOHN L 2839 MOSSWOOD DR, LODI CA 95242 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $0.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW a. 07/20/2021 RELEASED BY DATE Printed: Tuesday, July 20, 2021 10:01:44 AM 1 of 2 RIGHT OF WAY EUC PERMIT City of • • • I[ Z, C, www.cityofedmonds.•. • • CONDITIONS CONDITION TYPE Easement and/or permission from adjacent property owner is required prior to entry or work within ADJACENT PROPERTY an adjacent property. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. Alert affected residents and/or businesses prior to work start. Verify clear bore crossings. ENGINEERING OTHER Restore landscape to like or better conditions. Call for required inspections as noted. ESC REQ Maintain erosion and sedimentation control per City and SWMMW standard requirements. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND OR NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROL Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS RESULT INSPECTION MEN A-1 JOB START X-2 ENGINEERING FINAL" Printed: Tuesday, July 20, 2021 10:01:44 AM 2 of 2 ENG2021-0254 j of EDA4041, RIGHT OF WAY CONSTRUCTION RECEIVED PERMIT APPLICATION J U L 08 2021 Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS /'Vc. i s`l° Requirements outlined in Right -Of -Way permit Handout E6:I. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General• Project Name er rop ime Site Address or if no site address use Property Address at NW corner of project area:714 Alder St, Edmonds Associated Permits: BLD PLN ENG Owner and Entity Holdingapplicable) Name of Company COMCAST Franchise Ordinance No: Point of contact YVONNE, JERDEE Title Address City EVERETT state WA "P 98284 Phone Emai'VVONNE JERDEE � COMCAST Contractor and Authorized Agent of Owner (see note below) Name of Company Sound Drilling LLC Contractor Contacts During Construction Primary Name O ton a mer Agent Name KOlton Palmer Title Owner Title Owner Mobile 425-244-2303 Address24499 E State St Email kolton@sounddr-illinglic.com City Sedro Woolley State WA T—zip98284 Secondary Name Phone 425-244-2303 Title Email kolton sounddrillin llc.com Mobile City of Edmonds Business License No: SOUNDDL821JQ Email State License Nos OUNDDL82 I JQ X Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well ❑ Traffic Control Only (no associated development) XUtility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) INSTALL 2 INCH CONDUIT FROM 714 ALDER STREET TO COMCAST PED LOCATED IN FRONT OF 712 ALDER ST. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 72 hours + LF x LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: Xtelecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No X 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? X If yes, describe: Fmore 3. Does the proposed work connect a lot or commercial development with utilities that serve than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? X Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the X project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? 1 City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: / __ DATE: 7/7/2021 APPLICANT PRINTED NAME: KOLTON PALMER APPLICANT TITLE: OWNER NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 VAN moil NOIlr1S w3'oc" OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE SOO • w • 1w SEE NOTE 4 W • 120 RECEIVED JUL 08 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT G20-2 M S►4AOOW VEHICLE REOUIRE D SEE NOTE 4 w 1w FLAGGER STATION SEE NOTE 2 SEE NOTE I • -- W20-7 SEE �t NOTE I • — W3-4 SEE SEE NOTE 9 NOTE I W20-4 SEE 41 1 NOTE I ENG A PIROVED AS OT DN m '! IL jX 1&411,4?_ 07/19/2021 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY Vill UTILITIES MAY REQUIRE A SEPERATE PERMIT. W20. 1 �3t11 AV@ oL" ""'" --� 8th Ave Connecto, c w 1 � to o m ,• ch 1� J n _ I i r , ' 4!V M r • ,TI 1 - - 40 t•� vJ 1 r 1 N Lul low jlb i IL o %o ch �. c� CY) � 1 t • ` � n .J� 4- r .� sks Drawing Tool Labels X .© � R View Identify Print Export Share Basic Tools Layers = x < yers -� - Filter al Areas L r) itional Layers Stormwater 8 6 a Water Sewer Utility Cable 'n + �. 4- [ r Pan Zoom In Zoom Out Full Extent Previous Extent Navigation M O 8-5 M CLOSED Z O Ct O k 1137� -7 80 PSI Transportation CO AsBuilts / Easements Lr) Property i Planning / Zoning Maps hour Lines [I] P-q— Bookmarks Linked Maps Lf) (� T . Ln j� r— O O N M 8-710 EW-301 8-1152 ; 8-7 - 23 x all r)F .4151 8-1150 I N �O O O O 415 !W 1 R Basemaps y 0 30 soft -0 0 co - M M `- s- R_17Z8-1253 CLOSLUB-1254 N d' %.O CO O N �' r- r- Cal CN N RECEIVED J U L 08 2021 CITY OF EDMONDS DEVELOPMENT SERVICgSDEPARTMENT Ln Ln � I � 8-133B