Loading...
Crawford structural inspection report 051621BEBURT ENGINEERING May 16, 2021 City of Edmonds Building Division Edmonds, WA 98020 18530 MERIDIAN AVE N. SHORELINE, WA 98133 RE: Report of Special Inspection: Replace rotted OSB under siding and deck framing 850 Edmonds St Plan Check BLD2021-0215 Compliance: Burt Engineering was hired to perform the structural inspection of the wood framing assemblies related to the replacement of exterior wall framing and sheathing materials at 850 Edmonds St. Items on the Construction Inspection Progress Card are outlined below in order of compliance; items B-3, and B-4. Item B-3 and B-4, deck area general sheathing installation: Sheathing installation was performed in accordance with our drawings and the standard of care for such work. Special inspection of the sheathing installation was not warranted, so our inspection was limited to framing placement, sheathing installation, and nailing. The framing repairs included exterior Northeast wall framing where walls were supporting deck and elevated walkway structure. We observed that work on several occasions between March 161h and March 291h. Where we could not directly observe, photographs were provided showing compliance. Note that where the rim joist was exposed, sheathing was placed with LTP connectors for shear transfer. Blocking was added at unsupported panel edges where necessary. This installation of all framing and sheathing materials in this area were deemed appropriate for the given conditions. 2. Item B-3 and B-4, Main floor north framing: This framing had to be exposed, so siding had to be removed in order to complete the load transfer details, including blocking and new sheathing, and floor to floor shear transfer clips. Installation of all framing and sheathing materials was deemed compliant. 3. Item B-3 and B-4, Main floor east framing: This framing had to be exposed, so siding had to be removed in order to complete the load transfer details, including blocking and new sheathing, and floor to floor shear transfer clips. Installation of all framing and sheathing materials was deemed compliant. 4. Item B-3, Main floor west framing: This framing had to be exposed, so siding had to be removed in order to complete the load transfer details, including blocking and new sheathing, and floor to floor shear transfer clips. Installation of all framing and sheathing materials was deemed compliant. BLBUR T 18530 MERIDIAN AVE N. SHORELINE, WA 98133 ENGINEERING 5. Item B-3 and B-4, Upper floor north framing. This framing had to be exposed, so siding had to be removed in order to complete the load transfer details, including blocking and new sheathing, and floor to floor shear transfer clips. Installation of all framing and sheathing materials was deemed compliant. 6. Item B-3 and B-4, Upper floor east framing: This framing had to be exposed, so siding had to be removed in order to complete the load transfer details, including blocking and new sheathing, and floor to floor shear transfer clips. Installation of all framing and sheathing materials was deemed compliant. 7. Item B-3 and B-4, Upper floor west framing. This framing had to be exposed, so siding had to be removed in order to complete the load transfer details, including blocking and new sheathing, and floor to floor shear transfer clips. Installation of all framing and sheathing materials was deemed compliant. 8. Item B-3 and B-4, Upper floor south framing: This area required only siding to be removed and replaced and re -sheathed. Installation of all framing and sheathing materials was deemed compliant. Special Inspection: We were also hired to perform the special inspection of the Epoxy anchors for the shear walls supporting the deck structures near the east side of the house, item B-5 on the same card. Item B-5 should be resolved with satisfactory completion of item B-3. We visited the site on numerous occasions and observed the installations accordingly. This section is repeated from our April 131h report: Anchor installation: Per ICC-ESR 2508, adhesive anchors were installed with special inspection in accordance with Section 1705 of the IBC. Anchor description and adhesive: The anchors were 5/8" diameter ASTM A307 threaded rod. The anchor length varied but exceeded the minimum specified in all cases. The adhesive product was Simpson SET-XP, expiring July 2022. Hole preparation: Holes were drilled with a Bosch rotary hammer, using bits in compliance with ANSI B212.15-1994. All holes were drilled 0.75" diameter to prepared according to the permit drawings and per Figure 2 of the ES Report. All holes were properly blown, brushed, and blown again, per the installation instructions. Final torque: After curing, each anchor was torqued to 30 ft-lb. The anchors held without slipping and were checked again 48 hours after initial inspection. Photographs are available upon request by interested parties. Please do not hesitate to contact this office with any questions. Sincerely, BE BURT ENGINEERING BURT ENGINEERING PLLC Cornell E. Burt, P.E. President Cc: File 18530 MERIDIAN AVE N. SHORELINE, WA 98133